Callout 1 of 3
Lead flashings at the Broomy Hill wall junction
Wherever a roof slope runs into a wall, such as a side wall, a party wall or the back of a chimney, something has to seal the gap. That something can be lead. A step flashing is a run of lead cut in a staircase pattern to match the rising steps of brick or stone, an apron is the piece that covers the lower face of a stack, and a cover flashing is the strip that hangs down over the upturn of another piece. Each of these tucks into a joint in the masonry, where the wall's own mortar holds the top edge.
Failures are easy to see once you are close. Lead can lift out of its joint when the pointing around it breaks down. It can split along a fold, and it can slide down the wall if it was never wedged. The wall behind can also be the cause, since crumbling pointing gives the lead nothing to hold. We check the lead, the pointing and the line of the roof tiles together, and we photograph each junction from the roof surface so the evidence arrives with your report.
Royston Lead labels each thickness with a code. Code 3 is marked "Recommended for lead soakers only", and Codes 4, 5 and 6 are listed for flashings among other uses. Matching the code to the position matters more than choosing the heaviest sheet, because heavy sheet resists being worked into a narrow joint. HomeBuilding gives lead flat roofs "60-100 years", and MyJobQuote says correctly installed lead flashing "can last for over 80 years". Those figures describe lead that was fitted well and left undisturbed, so a flashing that has failed after a few decades points to a fault in the detail, and the fault is what we look for.
Where a lead flashing fails, the repair can be as small as a new section dressed into a raked-out joint. Our lead roofing page explains the full range of leadwork, from soakers to flat roofs.
Lead at the wall
Is a failed flashing a reason to re-roof?
Not on its own. A flashing that has lifted or split is replaced as a repair, along with the pointing that holds it. A whole new covering becomes the question only when the tiles or slates themselves are at the end of their life.
Lead flashing holds at the joint along its top edge.















