01432 610152 Get a quote Call 01432 610152

Roofers in Broomy Hill

Lead flashings, roof windows and eaves for the houses of Broomy Hill.

Broomy Hill is part of Hereford, 1.1 road miles south-west of the city centre, with a conservation area designated in 1975.

Get a free quoteCall 01432 610152

Broomy Hill roofs: joints, openings and edges

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Lead where roof meets wallFlashings carry the join between roof and masonry, so every lap gets checked.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Windows set into the slopeA roof window needs flashing, insulation figures and sometimes planning permission.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Soffits, fascias and nestsThe eaves hide old boards, possible asbestos and sometimes nesting birds.

Broomy Hill and the roads in

Broomy Hill on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Broomy Hill, from lead to eaves

Flashings, roof windows and eaves on a Broomy Hill house

The survey runs from the lead where roofs meet walls, to the windows set into a slope, and down to the eaves, before turning to the listed buildings and the 1975 conservation area around Broomy Hill.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Lead flashings; 2 Roof windows; 3 Eaves and soffits.

Fig. 1 A roof in section, with lead, window and eaves numbered for Broomy Hill.

Callout 1 of 3

Lead flashings at the Broomy Hill wall junction

Wherever a roof slope runs into a wall, such as a side wall, a party wall or the back of a chimney, something has to seal the gap. That something can be lead. A step flashing is a run of lead cut in a staircase pattern to match the rising steps of brick or stone, an apron is the piece that covers the lower face of a stack, and a cover flashing is the strip that hangs down over the upturn of another piece. Each of these tucks into a joint in the masonry, where the wall's own mortar holds the top edge.

Failures are easy to see once you are close. Lead can lift out of its joint when the pointing around it breaks down. It can split along a fold, and it can slide down the wall if it was never wedged. The wall behind can also be the cause, since crumbling pointing gives the lead nothing to hold. We check the lead, the pointing and the line of the roof tiles together, and we photograph each junction from the roof surface so the evidence arrives with your report.

Royston Lead labels each thickness with a code. Code 3 is marked "Recommended for lead soakers only", and Codes 4, 5 and 6 are listed for flashings among other uses. Matching the code to the position matters more than choosing the heaviest sheet, because heavy sheet resists being worked into a narrow joint. HomeBuilding gives lead flat roofs "60-100 years", and MyJobQuote says correctly installed lead flashing "can last for over 80 years". Those figures describe lead that was fitted well and left undisturbed, so a flashing that has failed after a few decades points to a fault in the detail, and the fault is what we look for.

Where a lead flashing fails, the repair can be as small as a new section dressed into a raked-out joint. Our lead roofing page explains the full range of leadwork, from soakers to flat roofs.

Lead at the wall

Is a failed flashing a reason to re-roof?

Not on its own. A flashing that has lifted or split is replaced as a repair, along with the pointing that holds it. A whole new covering becomes the question only when the tiles or slates themselves are at the end of their life.

Lead flashing holds at the joint along its top edge.

Fig. 2 Leadwork, drawn close

Callout 2 of 3

Roof windows cut into a Broomy Hill slope

A roof window lies flush with the slope and opens on a hinge or pivot. A rooflight, by contrast, is a fixed glazed unit that may stand proud of the roof. Both need the covering around them to be cut back and flashed, and both change the insulation of the roof at that point. The survey looks at the rafters on each side of the opening, the flashing kit that seals it and the plasterboard returns inside, because those details decide whether the window stays dry.

Building Regulations treat the glass and the roof differently. Regulation 2 of the Building Regulations 2010 names walls, floors and roofs as thermal elements and leaves windows, doors, roof windows and rooflights outside that term. AD L 2021 Table 4.2 sets 0.15 for a roof, 2.2 for a rooflight, and 1.4 or WER Band B for a window, roof windows included. Those figures stay in force until AD L 2026 Table 3.2 replaces them on 24 March 2027, and the values themselves do not change.

Planning is a separate matter, and in a conservation area it needs more care. Our planning guide for roof windows sets out the conditions on an English site, and flats have no householder permitted development rights under article 2 of the GPDO 2015. Broomy Hill has a conservation area of its own, designated in 1975 on Herefordshire Council's list, so read the guide before you choose a position. Check whether an Article 4 direction applies with Herefordshire Council as well.

Position matters too, and so does the room below, because a window that suits the roof may clash with a bedroom wall or a stair. We mark the opening on the plasterboard from the loft side, so the owner can walk through it before any slate or tile is lifted. A window high in the slope lets in more light and seals more easily than one low down, and the rafter spacing may make a particular size easier to fit. We measure the rafters from the loft at the survey, because the width of the opening depends on them. The chimney, the valleys and the ridge are all kept clear of the opening, as flashing near any of them is harder to make watertight.

Words you will meet on a window quote

Roof window
An opening window set in the plane of the slope
Rooflight
A fixed glazed unit, sometimes raised above the roof
Flashing kit
The pre-formed set of pieces that seals the frame
WER Band B
A window energy rating, accepted as an alternative to 1.4
Trimmer
The timber that frames the opening between rafters

A roof window is, in effect, a hole in the roof; its flashing is the only thing that closes it.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

Eaves, soffits and the listed houses of Broomy Hill

Eaves is the name for the part of the roof that overhangs the wall at the bottom of each slope. The soffit is the board under that overhang, and the fascia is the board across the front of the rafter ends. They are easy to ignore from below and are where birds nest and where roof ventilation can enter. HSE's list of asbestos locations includes "AIB white soffit panels to underside of roof eaves", and its guidance treats any building constructed or refurbished before 2000 as one that may contain asbestos. Removing that board is usually licensed work, so we pass it to a licensed firm.

Wildlife law applies up here. GOV.UK places all bat species under full legal protection, including their roosts, and its list of affected activities names repairing or replacing a roof. A Natural England licence may be available where work cannot avoid them. Habitats Regulations regulation 43 makes damaging a breeding site or resting place an offence, with no need for intent. If we find droppings, staining or live animals at the eaves, work on that part stops, and photographs of it go into your report.

Broomy Hill has listed buildings among its houses. Historic England's records for houses near the centre include these. Oakleigh Cottage (list entry 1196796) and Eden Holme Gwynfa (list entry 1297464) are both Grade II and were first listed on 27 July 1994, and 38 and 48, Broomy Hill is Grade II too (list entry 1280571). Listed building consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 applies to works that would affect the building's character. A listed house does not forfeit its permitted development rights, yet that consent is needed in addition. Repairs to eaves details follow the existing profile.

Our guttering, soffits and fascias page covers the roofline in detail. For protected houses, our listed and heritage roofing page explains the approach.

The eaves are where birds nest, boards rot and old asbestos sometimes hides.

What the eaves survey records

Fascia
Rot, splits and loose fixings along the rafter ends
Soffit
Board type, condition and ventilation gaps
Nests and roosts
Signs of birds or bats before work starts
Asbestos
Possible AIB boards passed to a licensed firm
Listing
Original profile recorded where the house is listed

Broomy Hill roofs: lead, windows and listing

What do you look at where lead meets a wall on a Broomy Hill house?

We check the lead at the lap, the fold and the joint that holds its upper edge, then the pointing around it, because crumbling pointing leaves the lead with nothing to grip. We follow the line of the roof tiles next to the flashing too. Each junction is photographed from the roof itself, and the pictures show whether the repair is a new section or a re-dressed one.

Can I add a roof window to a house in the Broomy Hill conservation area?

Possibly, but a conservation area alters the planning position, which the planning guide on this site explains in full. On the building side, AD L 2021 sets a rooflight at 2.2 and a roof window at 1.4 or WER Band B. Herefordshire Council confirms whether an Article 4 direction covers your street, and that answer should come before you commit to a position or a size.

Who inspects a re-roof on Broomy Hill, the council or a private approver?

Both are able to. Herefordshire Council Building Control answers on 01432 261938 or at bce@herefordshire.gov.uk, and takes building control applications for work in the city. A registered building control approver is the private alternative, and the choice is yours to make. Private building control existed before registration with the Building Safety Regulator began in England on 6 April 2024, so registration changed who is on the list, not whether private control is allowed.

Do flats on Broomy Hill have the same roof window rights as houses?

No. Flats have no householder permitted development rights, because the GPDO 2015 definition of a dwellinghouse leaves out a building containing flats and a flat within one. A roof window for a flat therefore needs a planning application. Leaseholders also need the freeholder's agreement, since the roof can be part of the building the freeholder owns. Ask Herefordshire Council to confirm the position before design work starts.

What are the signs of bats in a Broomy Hill roof?

Droppings under the eaves, staining around a gap in the soffit and small scratch marks can all point to a roost. A roost can be damaged without anyone intending it, and the law treats that as an offence, so GOV.UK lists roof repairs and replacement as activities that can affect bats. We stop work on the affected part, and the next step belongs to Natural England, whose licence the work may need. Droppings are photographed and kept out of the way until a decision is made.

Where do I turn if a roofing job on Broomy Hill goes wrong?

Start with a written complaint to the firm, then take it further if the complaint is not resolved. The Consumer Rights Act 2015 section 49 requires that a service be carried out with reasonable care and skill. Citizens Advice runs a consumer helpline on 0808 223 1133 and can pass complaints on to Trading Standards. Since 6 April 2026 the duty to point to dispute resolution sits in the DMCC Act 2024 section 308.

Book a lead and eaves survey on Broomy Hill

Say what is visible from the ground, and a survey of the roof follows, ending in one total price on paper.

10-year workmanship guarantee, in writing