01432 610152 Get a quote Call 01432 610152

Roofers in Leominster

Roof repairs and re-roofs for Leominster's timber-framed streets and the houses built since.

We start at the ridge and the chimney stacks, photograph what we find and put one total price in writing.

Get a free quoteCall 01432 610152

Where Leominster roofs let the weather in

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Seventeenth-century timber framesOld frames shift, so verges and flashings beside them can open up.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Tall stacks and their leadA tall stack takes weather on every face, and its lead needs checking.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Tile and slate coveringsA slipped slate or cracked tile lets rain reach the battens below.

Inside our 30 miles: Leominster

Leominster on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

The Leominster roof, read from the top

Three checks on a Leominster roof, from the ridge to the timber frame

We follow the order every survey of ours takes: the ridge first, then the chimney stack and its lead, then the timber-framed gable where an old frame meets its covering.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge line; 2 Stack and lead; 3 Framed gable.

Fig. 1 Leominster roof cut open: ridge, stack and framed gable, each one numbered.

Callout 1 of 3

The ridge on Leominster's tile and slate roofs

Our survey opens at the very top. On a Leominster house that top line is the ridge: a row of capping tiles along the top, bedded on mortar or held by a dry-fix system of clips and screws in place of mortar. When the Royal Commission surveyed the parish for its 1934 inventory of Herefordshire, it described the monuments it listed there, unless it said otherwise, as buildings that "are of the 17th century and of two storeys, timber-framed, and with tile or slate-covered roofs". Of the Forbury Chapel it wrote that "the walls are of stone and the roofs are slate-covered". So a ridge in this town may sit over clay tiles, natural slate or a covering put on after that survey, and each one is capped and fixed in its own way.

We walk the ridge line first, from one gable to the other. A capping tile that rocks under a hand has lost its bed. Open joints in the mortar let rain run down into the top course and onto the battens, the timber strips the tiles hang from. Where a ridge meets a hip, the sloping outside corner of a roof, we check the mortar again, because two lines of weather meet at that point.

Marley, the tile maker, sets out the current position plainly: "Installing to BS 5534 isn't required by law", yet after the 2015 amendments "mortar could no longer be relied upon as the only means of securing the roof covering". BS 5534:2014+A2:2018 is the code of practice for slating and tiling, and BS 8612 covers dry-fix ridge and verge systems. Mortar is still used. When we rebed a ridge we fix each capping tile mechanically as well, and on an older house we keep the bedded look where that suits the building.

A loose ridge on its own is a repair, not a new roof. If the survey shows the whole covering is worn out, the Planning Portal says that in England no application is normally needed when "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". A heavier covering is another matter: approval is needed if it "increases the weight of the roof covering by 15 per cent or more", and that means a structural check first. Our roof repairs page sets out the smaller jobs, and we photograph each fault on your ridge so you can see it before you decide.

Checked along a Leominster ridge

  • Capping tiles that rock or have lifted
  • Open or crumbling mortar joints
  • A mechanical fixing on each capping tile
  • The joint where the ridge meets each hip
  • The end tile at each gable

A ridge that has lost its bed is a repair, and we price it as one.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Chimneys above the Leominster frames, and their lead

Next comes the chimney. Rising clear of the slopes with all four faces open, a chimney catches wind and rain from any quarter and spills the run-off onto the tiles beneath it. Writing about black-and-white buildings across Herefordshire, the Herefordshire Building Stone Atlas records that "the large external chimney stacks of these buildings are also commonly of local sandstone", and the 1934 inventory put Leominster's own seventeenth-century buildings in that timber-framed tradition. Whether a Leominster stack is stone or brick, we look closely at the face of each unit and at every joint.

Where the stack passes through the roof, lead keeps the joint dry. A flashing is a lead strip whose top edge is wedged into a mortar joint and whose lower edge lies over the covering. Beneath it, a soaker, a small folded piece of lead, is slipped under each course of tiles or slates down the sides of the stack. The back gutter is the lead tray behind the stack that carries water round it. Royston Lead's table gives each thickness a code: Code 3 is "Recommended for lead soakers only", while Codes 4, 5 and 6 are listed for flashings. We match the code to the job and dress the lead so it can move with heat without tearing.

On the stack itself we check the pointing (the mortar face of the joints), the flaunching (the sloped mortar collar round the pots at the top) and the pots. You cannot see the top of a stack from the street, so we send you photographs of each face and of the flaunching with the report. Lead that has split or lifted is replaced, not smeared over with sealant. In MyJobQuote's words, properly fitted lead flashing "can last for over 80 years", so lead in good order stays where it is.

Two sets of rules can follow a chimney job. If you want a stack and its breast taken out, the Planning Portal is clear that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." If the breast is on a wall you share with next door, the building owner has to serve the neighbours a party wall notice, with a lead time of at least two months. If scaffolding needs a footing on the footway or the carriageway, we arrange the licence with our scaffolder, and Herefordshire Council needs the paperwork in at least 10 days before erection. Our chimney repairs page covers rebuilding and repointing in more depth.

Lead and masonry at a Leominster stack

Flashings
Lead tucked into the joints and dressed over the tiles
Soakers
Code 3 lead, one under each course
Back gutter
A lead tray that turns water round the stack
Pointing
Raked out and refilled where joints have opened
Flaunching
The mortar collar that holds the pots
Fig. 3 Chimneys, drawn close

Callout 3 of 3

Old frames, listed walls and the town's conservation areas

The last callout is the gable of a timber-framed house, where the covering stops at the frame. The verge, the edge of the roof over the gable, rests on timbers that have moved for centuries. We look for gaps between the frame and the covering, for verge mortar that has dropped out and for rainwater tracking down the face of the timbers. The repair uses the kind of materials the house was built with, so the patch works with the frame rather than against it. From inside the loft we also look at the wall plate (the beam crowning the wall, which the rafters bear on) and at the rafter feet, because damp in an old frame can show up there long before it marks a bedroom ceiling.

Several of Leominster's buildings are listed. The Priory Church of St Peter and St Paul is Grade I (list entry 1077617, first listed 24 July 1954). As a Church of England church in use, its works go through the faculty jurisdiction, not listed building consent. The Forbury is Grade II* (list entry 1255417, first listed 24 July 1954), and Grange Court and the Lion Ballroom are Grade II* as well. For a listed house, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent for works that would affect "its character as a building of special architectural or historic interest". A listed house keeps its permitted development rights, but listed building consent is needed on top, so the materials and the method are settled with the council before a tile comes off.

Herefordshire Council lists these conservation areas in and around the town: Leominster Town (designated 1969), Leominster Bridge Street (1993), Leominster Bargates (1995) and Leominster River Meadows (1995). Herefordshire has 64 conservation areas in all. A new roof window or dormer is where the rules bite hardest, and our planning guide for roof windows sets them out in full, so read it before you plan one. Check whether an Article 4 direction applies with Herefordshire Council too.

Building control for a Leominster address is Herefordshire Council Building Control, at Plough Lane in Hereford, on 01432 261938 or bce@herefordshire.gov.uk. A registered building control approver can do the same job instead. Our listed and heritage roofing page explains how we work on protected houses, from the first photographs to the last lead dressing.

The gable verge on an old frame

SoundCovering sits tight to the frame, verge bedded and dry
Needs workGap at the frame, verge mortar lost, timber stained

Leominster roofs: rules, frames and slate

What were Leominster's old timber-framed houses roofed with?

The Royal Commission's 1934 inventory of Herefordshire described the monuments it listed in Leominster parish, unless it noted otherwise, as seventeenth-century, two-storey, timber-framed buildings "with tile or slate-covered roofs". A house can be re-covered more than once in three centuries, so the roof on yours today may not be the one it started with. The survey tells us what is there now, and where an older covering survives we repair it in the same material if it can still be found.

Is my house in one of Leominster's conservation areas?

It may be. Herefordshire Council lists Leominster Town, designated in 1969, Leominster Bridge Street from 1993, and Leominster Bargates and Leominster River Meadows, both from 1995. The council's own map shows each boundary, so check your street against it before any change to the look of the roof. Ask Herefordshire Council whether an Article 4 direction applies too. Like-for-like repairs are a different question from new roof windows, and the planning guide covers those.

Do I need Building Regulations approval to re-roof in Leominster?

Leominster is in England, so the Planning Portal test applies: no application is normally needed when less than 25 per cent of the building envelope and less than 50 per cent of the roof is affected. A larger re-roof goes to building control. Insulating the roof at the same time brings in Part L: AD L 2021 Table 4.3 sets a threshold of 0.35 and an improved figure of 0.16, until AD L 2026 Table 3.3 takes over on 24 March 2027.

What does a scaffold licence cost on a Leominster street?

Herefordshire Council's fee to put scaffold on the highway is £167, and that licence lasts for a maximum of one month; extensions are £123 per month. The council wants the application at least 10 days before the scaffold goes up. We arrange the licence with our scaffolder, and the scaffold cost sits inside the one written price. Herefordshire Council Highways Licensing takes scaffold licence calls on 01432 261800. For a Leominster house on a main road, the council's team can confirm who handles it.

Does roof work on a Leominster church need listed building consent?

It depends on who owns the church and whether it is still used for worship. The Priory Church of St Peter and St Paul is a Church of England church, so its works go through the faculty jurisdiction. A Roman Catholic, Methodist or United Reformed church, or a Baptist Union one with Schedule 1 trustees, keeps its own exemption while in use. A Unitarian or Quaker meeting house is not exempt, and nor is a closed chapel: if listed, either one needs listed building consent from Herefordshire Council.

Can a slate roof on a listed Leominster house stay in slate?

Yes, and on a listed house that is where the conversation starts, agreed through listed building consent. HomeBuilding puts the lifespan of Welsh slate at "100+ years", so sound slates can be worth stripping, sorting and refixing. Where new slate is needed we match the size and colour to the old. SPAB tells owners to go to the quarries themselves whenever a supplier says a stone or slate cannot be had or will take too long, and we make that call before suggesting any change of material.

Book a ridge-first survey in Leominster

Send a photo or a few lines about the roof, and we will check it from the ridge down and price it in writing.

10-year workmanship guarantee, in writing