01432 610152 Get a quote Call 01432 610152

Roofers in Dinedor

Slate, chimney and lead work in Dinedor, 4.7 road miles from Hereford to the south-east.

The slopes, stacks and wall joints each get a survey in turn, photograph every fault, and give you one written total afterwards.

Get a free quoteCall 01432 610152

Slate, stacks and farm walls around Dinedor

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Slates that slideA slate that slips leaves a gap through which rain reaches the battens.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Lead against masonryFlashings at a stack or wall open up as the lead splits or lifts.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed farm buildingsA listed farmhouse or barn needs consent before any roof work begins.

Dinedor on our coverage map

Dinedor on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Dinedor roofs, slate first

Slate slopes, chimney lead and the farm-group walls at Dinedor

This parish is small, and a survey of a Dinedor roof follows a short route. We read the slate slopes, then the stack and the lead around it, then the walls where listed farm buildings and the church set the rules.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Slate slopes; 2 Stack and lead; 3 Walls and listing.

Fig. 1 A border house drawn in section, Dinedor's three callouts numbered on it.

Callout 1 of 3

Slate slopes, from Rotherwas Chapel to your own roof

Slate is the covering that appears in print for this parish. In volume one of its Herefordshire inventory, issued in 1931, the Royal Commission on Historical Monuments recorded of Rotherwas Chapel, in Dinedor parish, that "the roofs are covered with slates." That single line says what one building carried in 1931. It cannot tell us what is on your house, so we find out for ourselves on the survey, slope by slope.

Slates hang from battens, the thin timber laths fixed across the rafters, and each slate overlaps the one below. Cupa, a slate supplier, says BS 5534:2014+A2:2018 "also indicates that the minimum roof pitch for natural slate is 20 degrees in the case of a project situated in an area with moderate exposure and with a slate 500mm long and a 115mm overlap". Cupa adds that hook fixings "should not be used on any pitch below 25º". So pitch, slate length and overlap are three things we record before suggesting a repair or a new fixing method.

A sound slate roof can be a long-lived one. HomeBuilding lists Welsh slate at "100+ years", Spanish natural slate at "75-100 years" and reclaimed Welsh slate at "50-80 years". SPAB, the society for protecting old buildings, says a roof slated well is "likely to be more than 100 years" in life. Such ranges describe slate in good order, not any one roof, which is why we look at the fixings and the battens as well as the slates. On a Dinedor survey we also note the size, thickness and colour of the slates in place, and we photograph the overlap where a slate has been lifted, so that any matching slate can be ordered against a clear record of the original.

Where slates have slipped, we refix them or replace single slates to match. Where a roof is stripped, good slates are sorted and reused, and SPAB warns that "Claims of unavailability or long delivery times should always be checked with the quarries", so we check before anyone proposes a different material. A different covering brings a weight test as well. Under the Planning Portal's guidance, Building Regulations approval follows when a new covering "increases the weight of the roof covering by 15 per cent or more". Our slate roofing page goes into the materials in more depth.

A Dinedor slate course

SoundSlates lying flat, overlap even, nail heads hidden
Needs workSlipped slates, a bare strip, battens showing through

Slates that are sound get sorted and put back. Only broken ones leave the roof.

Callout 2 of 3

Chimney stacks and the lead that seals them

Most of a chimney stack rises into open air, so rain and wind reach every face of it. The joint where it passes through the slope is the part that asks for care, and lead closes that joint. A flashing is lead in strip form, let into the brickwork or stone and folded over the roof covering. Soakers are small sheets that lie beneath the slates beside the stack. Behind it sits the back gutter, a lead tray that steers water round to either side.

Royston Lead grades its sheet by code. Code 3 is "Recommended for lead soakers only", while Codes 4, 5 and 6 are listed for flashings, and Codes 5 and 6 also for parapet and box gutters. Each part of the stack gets the code that suits it, and the lead is laid with room to swell in the sun and contract again without tearing. MyJobQuote says correctly installed lead flashing "can last for over 80 years", so lead that is sound is left alone.

On the stack itself we check three things. The pointing is the mortar between the stones or bricks. The flaunching is the mortar bed, sloped to shed water, that grips the pots. The pots are the clay or metal cowls on top, and any that lean or have cracked are listed in the report with the flaunching beneath them. From the ground you can see little of this, so the report includes a photograph of each face. Staining on the ceiling below or a tide mark on the chimney breast in the loft helps us tell whether the lead or the flaunching is letting water in.

Taking a stack and breast out is a larger decision. The Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." If the breast is shared with a neighbour, the Party Wall etc. Act 1996 makes serving notice the building owner's job, at least two months before the breast is cut away. We photograph the breast from the loft so that its condition is on record before any notice is drafted. Our chimney repairs page covers repointing, rebuilding and removal.

Lead at a Dinedor stack

Flashing
Lead tucked into the joints, dressed over the slates
Soaker
A small sheet under each slate course
Back gutter
A lead tray steering water round the stack
Flaunching
The mortar collar holding the pots
Pointing
Raked out and refilled where it has failed
Fig. 3 Chimneys, drawn close

Callout 3 of 3

Listed farm buildings, the church and nearby conservation areas

The third callout is the wall, where the roof ends against masonry and where the rules begin. Glebe Farmhouse is listed Grade II (list entry 1099601, first listed 21 May 1987), and so is the barn about 40 yards north of it (list entry 1348866, first listed 21 May 1987). Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, works that would affect "its character as a building of special architectural or historic interest" need listed building consent. That applies to a barn roof as it does to a house, and we survey a listed barn the way we survey a house: slopes first, then the ridge, the gable edges and the joint with any lean-to. Each fault is photographed so that the council can be shown the same record we work from. A listed house keeps permitted development rights but still needs the consent, so we agree the materials with Herefordshire Council before stripping anything.

The Church of St Andrew is listed Grade II (list entry 1099598, first listed 21 May 1987). St Andrew's is the Anglican parish church and is in use, and its roof repairs are settled through the faculty system rather than by listed building consent. A building of another denomination, or one no longer used for worship, follows a different route, and we would establish which applies before quoting for it.

The conservation areas closest to Dinedor are Hampton Bishop and Hampton Park in Hereford. Herefordshire has 64 conservation areas in all, and the council publishes boundary maps for each, so look up your address there. An Article 4 direction over your address is something Herefordshire Council can confirm. When a roof window or dormer is on the cards, our planning guide for roof windows sets out the position.

For building control at a Dinedor address, Herefordshire Council Building Control answers on 01432 261938 and at bce@herefordshire.gov.uk. A registered approver from the private sector is able to carry out the same checks. Our listed and heritage roofing page explains how we handle consent-controlled roofs, from first survey to last lead dressing. A scaffold on the highway brings a licence into play, and we arrange the licence with our scaffolder.

Words you may meet on a listed roof

Grade II
A listing grade for buildings of special interest
Faculty
The Church of England's own consent system for church works
Article 4 direction
A council order removing some permitted development rights in an area
Dry verge
A gable edge held by clips and screws instead of mortar

Dinedor roofs: slate, stacks and consents

Can old slates on a Dinedor farmhouse be lifted, sorted and laid back?

Yes, where the slates are sound and the battens beneath them can be renewed. We strip a section, sort the sound slates from the broken ones, and lay the sound ones back with matching replacements for the gaps. SPAB says well-slated roofs are "likely to be more than 100 years", which is the reason sound slate is worth keeping. The report shows what was kept, what was replaced, and the reason for each decision, with a photograph for every slope.

Which conservation areas sit near Dinedor?

The nearest are Hampton Bishop and Hampton Park in Hereford. Herefordshire has 64 conservation areas, and the council publishes a map of each boundary, so look up your address there. The council can also say if an Article 4 direction is in force, since such a direction may remove chosen permitted development rights across a whole area. Swapping slates one for one and fitting a new roof window raise separate planning questions, and our planning guide deals with the second.

What approval does re-slating a Dinedor house need?

Dinedor is in England, and the Planning Portal's test is that work touching under 25 per cent of the building envelope and under 50 per cent of the roof needs no application in the normal run of things. Larger work goes to building control, and a covering 15 per cent or more heavier needs approval. Part L also applies: AD L 2021 Table 4.3 sets 0.35 and 0.16 until AD L 2026 Table 3.3 on 24 March 2027.

Whose consent covers roof work at St Andrew's church in Dinedor?

St Andrew's is Anglican and still holds services, which puts its roof works under the faculty jurisdiction instead of the council's listed building consent. The survey photographs the roof as found, so a record is ready for that process. That would change only if the building closed or left worship altogether. Meeting houses of the Quakers or Unitarians get no such exemption, so listed building consent from the council would apply to it.

What does a scaffold licence cost for a house near Dinedor?

Poles and boards standing on a Dinedor lane or verge that forms part of the highway need a section 169 licence under the Highways Act 1980. Herefordshire Council's charge is £167, which covers one month at most, and each extension costs £123 per month, and the council needs the application in hand 10 days or more before the poles go up. We arrange the licence with our scaffolder. Trunk roads and motorways near Dinedor fall to National Highways. The licence cost sits inside the quote.

Must I tell a neighbour before a Dinedor chimney breast is removed?

If the breast is shared, yes. The building owner, and not the neighbour, serves notice under the Act, and the notice must run for at least two months before cutting. A surveyor comes in when the neighbour objects, or stays silent for 14 days. Building Regulations approval applies as well. For advice on the notice itself, a party wall surveyor is the person to ask, and building control is not.

Arrange a Dinedor roof survey

Tell us what you can see of the slates, the stack or the lead, adding a photograph if you have one.

10-year workmanship guarantee, in writing