Callout 1 of 3
Lead at the foot of a Ross-on-Wye stack
Weather reaches a chimney stack from all four sides, and every drop shed by a Ross-on-Wye stack ends up on the slates or tiles beneath it. The Royal Commission's 1932 inventory describes Ross parish's monuments 9 to 53 in one line: "The roofs are covered with tiles or slates." A stack through either covering is sealed at its foot by lead, and that seal is where we start.
Three lead parts do the sealing. Flashings are strips of lead keyed into the stack's joints and dressed down onto the slates or tiles. Soakers, each a little folded piece, are threaded between the slates or tiles up each side. Behind the stack, a lead channel on the upslope side, the back gutter, steers rain past the chimney rather than into it. Royston Lead's brochure sets Code 3 aside for soakers alone and lists Codes 4, 5 and 6 for flashings, so the position decides the code. MyJobQuote says correctly installed lead flashing "can last for over 80 years", and that is the reason sound lead is repaired before it is replaced.
Higher up, three things get checked. Pointing is the jointing between the courses of the stack. Flaunching, the sloping mortar collar, holds the Ross-on-Wye pots in place. The pots themselves are looked at last. From a Ross-on-Wye pavement none of it is visible, so we photograph each face of the stack from the roof itself. A split flashing is cut out and renewed; smearing sealant across the crack would only mask it.
Removing a breast inside the house is its own job. According to the Planning Portal, Building Regulations approval will always apply, because a breast belongs to the building's structure. If the wall is shared with a neighbour, party wall rules apply too: the owner's notice must reach next door at least 2 months ahead of any cut into a party wall. If the neighbour dissents, or gives no reply within 14 days, a surveyor is appointed to settle it. Rebuilding a Ross-on-Wye stack, repointing it or relining its flue is explained on our chimney repairs page.
At the foot of a Ross-on-Wye stack
- Flashing
- Lead set into the joint and lapped over the covering
- Soakers
- Folded lead threaded under each course beside the stack
- Back gutter
- A sloped lead channel behind the stack
- Pointing
- Raked out and refilled where joints have opened
- Flaunching
- Sloping mortar that holds the pots
A split flashing is cut out and renewed, because sealant only hides it.















