Callout 1 of 3
Tiles on rubble walls: reading the Bromyard slope
A survey in Bromyard starts on the main slope, the broad area of covering between the ridge and the eaves. The Royal Commission's 1932 inventory of Herefordshire recorded of the Almshouse in the parish that "the walls are of rubble and the roofs are tiled." One building cannot describe a town, and that entry says nothing about the tiles on your house. It does show a pairing worth keeping in mind, a stone wall carrying a tiled roof, where the slope and the masonry beneath it are read as one structure.
On the slope we look for tiles that have slipped, cracked or lifted at the edge. Each tile hangs from a timber batten on a small projecting nib, and when the nib snaps or the nail rusts through, the tile slides and leaves a gap. A gap matters because the underlay, the membrane laid over the rafters beneath the battens, then takes the rain the tile should have shed. We check the batten and the underlay at every gap, and a photograph of each puts the fault in front of you before any decision is made. Age is a range and not a deadline: Marley expects roof tiles to last around 60 years, while HomeBuilding gives plain concrete tiles 40 to 50 years. The survey names the tile on your roof, so the right range applies, and a clay tile is the only kind to which the BRE's 60-year minimum belongs.
A replacement tile should match its neighbours in size, thickness and colour, because one odd tile shows from the lane for years. The gable end gets the same attention. There the covering stops short of the wall, and that finishing line is the verge. Where mortar has dropped out, the end tiles are left loose in a strong gust. A rebed is one repair, a mechanical fix at each end tile is another, and we say which the roof needs. BS 8612 covers dry-fix verge and ridge systems for houses that suit them, while an older house may keep a mortared edge with fixings added beneath it.
A slope that has worn out is a different question. On English ground, the Planning Portal sets its cut-off for a re-roof at under 25 per cent of the building envelope together with under 50 per cent of the roof, and below both figures no application is normally needed. A covering that is 15 per cent or more heavier brings in Building Regulations approval and a structural check, because the rafters were sized for the first covering. Our pitched roofing page covers re-covering a whole slope.
Checked across a Bromyard slope
- Tiles with snapped nibs or rusted nails
- Cracked or lifted edges along the verge
- Battens and underlay at every gap
- Replacement tiles matched in size and colour
A tile that has slid is a small repair until the batten beneath it rots.