01432 610152 Get a quote Call 01432 610152

Roofers in Widemarsh

Roof work for Widemarsh houses, from the ridge down, with photographs of every fault.

Widemarsh is part of Hereford, 0.6 road miles from the middle of Hereford, and every written price follows a survey.

Get a free quoteCall 01432 610152

What we look at around Widemarsh Common

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridge and hip cappingCracked bedding mortar lets capping tiles rock and lets rain into the top course.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Stacks on shared wallsWhere a chimney stands on a party wall, flashings and neighbour notices come too.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Conservation area rulesCouncil consent and planning checks can come before a single tile is lifted.

Widemarsh on the map

Widemarsh on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Widemarsh roofs, from the ridge to the Common

Three checks for a Widemarsh house: the ridge, the stack and the listing rules

What follows takes the order of our own survey: the ridge line first, next the chimney stack together with its lead, and last the conservation-area and listed-building rules that sit over Widemarsh Common and the streets beside it.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge and hips; 2 Chimney stack; 3 Listing rules.

Fig. 1 The roof drawn in section, with ridge, stack and wall marked for Widemarsh.

Callout 1 of 3

Capping, bedding and fixings along the Widemarsh ridge

Our survey begins at the highest line of the roof. For a Widemarsh house that means the ridge, where capping tiles line the crown, and any hips, the angled lines that run down from the crown where the roof turns a corner. Capping is either bedded in mortar or clipped to dry-fix hardware, which screws down with no mortar bed at all. We work the whole ridge end to end, pressing each capping tile by hand. Movement tells us the bedding has gone, and a gap that lets daylight through is a gap rain can use to get at the battens, the slim lengths of timber the tiles hang on.

Marley, the tile maker, states that "Installing to BS 5534 isn't required by law", and adds that after the 2015 amendments "mortar could no longer be relied upon as the only means of securing the roof covering". BS 5534:2014+A2:2018 covers slating and tiling practice, while BS 8612 is the standard behind the dry-fix fittings used on ridges and verges. Mortar has not disappeared from ridge work. When capping is rebedded, every tile also receives a mechanical fixing, and on an older house with weathered tiles we keep a bedded finish so the new work blends with the old.

The two ends of the ridge deserve as much attention as the length between them. The last capping tile at a gable sits exposed on its outer side, and a failed bed shows up there before anywhere else on the line. A hip where it climbs into the ridge is the spot where three runs of tile arrive together, and the cuts and mortar are examined closely. We photograph each fault at roof level and add it to your report, so the evidence is in your hands before any decision is made.

A loose ridge by itself is a repair, and our roof repairs page deals with jobs on that scale. Should the survey meet a covering that is spent, the photographs show it. A full re-roof enters the conversation only after the covering itself has failed.

Checked along a Widemarsh ridge

  • Capping tiles that rock or have lifted
  • Cracked or crumbling bedding mortar
  • A mechanical fixing on each capping tile
  • The meeting point of each hip and the ridge
  • The end tile at every gable

Wobble in a capping tile means the bed beneath it has gone, and the photographs pinpoint where.

Fig. 2 The ridge, drawn close

Callout 2 of 3

The stack, its lead and the neighbour next door

The chimney is the second callout. Rising proud of the roof with open air on all four faces, a stack meets rain and wind from whichever direction they arrive and sheds the run-off onto the slopes nearby. Four parts of the masonry get a close look. Pointing means the mortar filling the joints between brick or stone. Flaunching is the sloping mortar collar that bonds the chimney pots in place, and the pots themselves are the clay or metal pipes that crown each flue. Below them sits the brick or stone of the stack itself. From the pavement a stack cannot be read properly, so the report includes photographs of each face and the top.

Where the stack passes through the slope, sheet lead closes the joint. Soakers are small folded sheets of lead set beneath every course of tiles that meets the stack, and the flashing is the longer strip dressed over them and tucked into a masonry joint. Royston Lead's table marks Code 3 as "Recommended for lead soakers only", while Codes 4, 5 and 6 are listed for flashings too. According to MyJobQuote, correctly installed lead flashing "can last for over 80 years". Split lead is cut out and new sheet is dressed into the joints, never smeared over with sealant.

A chimney job can bring in two separate sets of rules. The Planning Portal states: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." The breast is the masonry inside the house that carries the flue upward. If that breast forms part of a party wall with next door, the Party Wall etc. Act 1996 makes the building owner responsible for serving notice; the neighbour must be offered at least two months, though written consent from the neighbour can replace the waiting period. A surveyor becomes involved only on a dissent from next door or after 14 days without a reply. Our chimney repairs page deals with repointing, flaunching and rebuilding in greater depth.

Lead and masonry at a Widemarsh stack

Flashing
Lead tucked into the joints and dressed over the tiles
Soakers
Folded lead under each course beside the stack
Pointing
Raked out and refilled where joints have opened
Flaunching
The mortar collar that holds the pots in place
Breast
Removal needs Building Regulations approval

We photograph the top of the stack because you cannot see it from the ground.

Fig. 3 Chimneys, drawn close

Callout 3 of 3

Moor House, Widemarsh Common and the consent rules

Wall is the label on our third callout, and it stands for the point at which the roof edge meets the rules around it. Herefordshire Council's list gives Widemarsh Common as a conservation area designated in 1975, and Herefordshire has 64 conservation areas in all. Repairing a roof like for like raises one set of questions. Putting in a roof window or a dormer opens a different set, and the Widemarsh Common conservation area does not weigh on the two equally. Our planning guide for roof windows lays out those rules, and it should be read before you sketch any new opening. Separately, ask Herefordshire Council to confirm whether an Article 4 direction applies to your street, because that answer can change what you may alter at the front.

Historic England's National Heritage List records buildings near Widemarsh's centre. Among them is Moor House, Grade II, list entry 1207926, first listed on 10 June 1952. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires listed building consent for works that "would affect its character as a building of special architectural or historic interest", unless the works are authorised. Listed houses keep their permitted development rights, and consent is still needed on top of them. Materials, fixings and method are therefore agreed with the council before any tile comes off.

For a Widemarsh address, building control questions go to Herefordshire Council Building Control (01432 261938, or bce@herefordshire.gov.uk), based in Plough Lane. A registered building control approver can take on that role instead, for anyone who prefers a private route, and whichever route you choose should be settled before a larger re-roof starts. Walls matter in another way as well: the lead beside a stack and the verge at a gable both end where roof meets masonry. Our listed and heritage roofing page explains how we approach protected houses, from the first survey photographs through to the lead dressed in last.

Consent comes first on a listed house, and the old tiles come off second.

Before the roofline changes

Does a conservation area stop a like-for-like repair?

Swapping broken tiles for matching ones is not the same question as adding a window or dormer. Ask Herefordshire Council whether an Article 4 direction applies to your street, then read the planning guide before you change how the roofline looks.

Widemarsh roofs: rules, stacks and nests

Which roof checks matter for a house beside Widemarsh Common?

Start with the ridge and hips and move on to the chimney stack with its flashings, because those are the places where a roof meets the sky and the weather reaches it from every side. After that we look at the slopes, the valleys, the verges and the gutters. You receive photographs of each fault, so you can see what needs doing before you agree to anything. The survey also notes how the roof can be reached from the street, because access shapes how the work is set up.

Which council record shows whether my street lies inside the Widemarsh Common conservation area?

The boundary maps and the register of conservation areas both belong to Herefordshire Council, and the register gives Widemarsh Common as designated in 1975. Hold your street up against the council's map, and ask Herefordshire Council whether an Article 4 direction applies there too. Fixing slipped tiles to match the old ones sits apart from cutting a new window into the slope, and the planning guide covers windows in full. Photographs of the roof taken from several angles let the council see exactly which elevation any change would affect.

Does re-roofing a Widemarsh house need Building Regulations approval?

Widemarsh lies in England, where the Planning Portal draws the limits: no application is normally required when less than 25 per cent of the building envelope is affected and less than 50 per cent of the roof. Beyond that, building control gets involved. Renovated roofs also meet Part L, in which AD L 2021 Table 4.3 gives a threshold of 0.35 and an improved figure of 0.16, until AD L 2026 replaces it on 24 March 2027.

Scaffold on a Widemarsh road: who sorts the licence, and what is the council's fee?

A scaffold that occupies the footway or carriageway is licensed under the Highways Act 1980, and we arrange the licence with our scaffolder. Herefordshire Council charges £167, which covers one month at most, then £123 for each extra month, and the application has to be in 10 days or more before erection. Scaffold licence enquiries go to Herefordshire Council Highways Licensing on 01432 261800, and that team also answers for a Widemarsh house on a main city road.

Does a chapel or church roof near Widemarsh need listed building consent?

Two things settle it: the denomination, plus the building's present use for worship. Church of England churches in use come under the faculty jurisdiction. Roman Catholic and Methodist churches keep exemptions of their own, as do United Reformed churches and those Baptist Union congregations with a Schedule 1 trust corporation as trustee. Buildings used by Unitarians and Quakers sit outside the exemption, as do redundant chapels, so a listed one of those needs consent from Herefordshire Council.

What happens if birds are nesting under the eaves when work is due?

The Wildlife and Countryside Act 1981 (section 1) applies where someone intentionally harms a nest that wild birds are occupying or still building, so we plan the work around an active nest. Bats and their roosts have protection too, and a Natural England licence is the route if a roof job cannot avoid them. Work on that section waits until the position is clear.

Ask for a survey of your Widemarsh roof

A few lines or a photograph of your Widemarsh roof is enough to begin, then a survey and one total price in writing.

10-year workmanship guarantee, in writing