01432 610152 Get a quote Call 01432 610152

Roofers in Swainshill

Roof repairs and re-covering for the timber-framed cottages and newer houses around Swainshill.

Ridgeline and stack come first in the survey, each fault gets a photograph, and one total is set down on paper.

Get a free quoteCall 01432 610152

What to watch on a Swainshill roof

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Frames meeting the coveringWhere a seventeenth-century frame meets the covering, verges and flashings can open up.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Stacks with ageing leadWeather hits a stack from every side, and the lead at its base ages.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Slipped tiles and slatesA slipped slate or tile lets rain onto the battens, the timber strips.

Swainshill, mapped

Swainshill on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

A Swainshill roof, surveyed top down

A Swainshill roof surveyed from the ridge, the chimney lead and the frame

Every survey follows one order: the ridge along the top, then the lead and masonry at the chimney, then the point where an old timber frame meets its covering. Photographs of whatever turns up close each stage.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge; 2 Chimney lead; 3 Timber frame.

Fig. 1 Three Swainshill callouts, numbered along the drawn border house.

Callout 1 of 3

The ridge and hips above a Swainshill cottage

Two slopes meet along the ridge, the high line of the roof, and a Swainshill survey begins there. The top of the roof carries a row of capping tiles, set in mortar or else clipped and screwed down as a dry-fix system. Walk the whole length from gable to gable and the faults show. Press on a capping tile and, if it rocks, its bed has gone. Where the mortar in a joint has crumbled, rain runs in at the gap and onto the top course, and from the loft a line of daylight along the ridge points to an open joint.

Breinton parish, which takes in Swainshill, has its own entry in the Royal Commission on Historical Monuments' 1932 inventory of Herefordshire. For monuments 3 to 8 it described buildings that "are of the 17th century and of two storeys, timber-framed and with tiled or slate-covered roofs". That wording matters when you stand under a ridge, because the covering may be clay tile, natural slate or a later replacement, and the capping and fixing differ for each. We find out which you have before we say what to do.

A ridge tile that rocks is a bedding repair, and we price it as exactly that.

On fixing, Marley states that "Installing to BS 5534 isn't required by law", and adds that mortar "could no longer be relied upon as the only means of securing the roof covering". BS 5534:2014+A2:2018 is the standard that governs how slates and tiles are fixed. Dry-fix systems come under BS 8612, and mortar itself is still allowed. On a ridge we rebed, each capping tile is mechanically fixed as well, and an older house can keep its mortar-bedded look where the building calls for it.

Hips are the angled outer corners at which two slopes meet. Each hip has its own run of capping and its own joint with the main ridge, so we check where all the lines meet. Photographs from the top of the ladder come to you: the gable end tiles, the mortar joints and any gap under a capping tile.

Fixing a loose ridge is repair work and is quoted as repair work. Where the survey finds a covering at the close of its working life, a heavier material is the main trap. The Planning Portal sets the line: a new covering that "increases the weight of the roof covering by 15 per cent or more" needs approval, with a structural check first. Smaller jobs are covered on our roof repairs page.

Checked along the Swainshill ridge

  • Rocking or lifted capping tiles
  • Crumbled or cracked mortar joints
  • A fixing on every capping tile
  • Hip junctions with the main ridge
  • End tiles at each gable

Ridge fixing in outline

Bedded ridge
Capping set in mortar, with a fixing added to each tile
Dry-fix ridge
Clips and screws, under BS 8612
Hip capping
A separate run, joined to the main ridge
Fig. 2 The ridge, drawn close

Callout 2 of 3

Swainshill stacks and the lead round their feet

Next we climb to the chimney. A stack rises clear of the roof, so weather hits it from every direction, and the place where it breaks through the slope is the vulnerable spot. Lead seals that joint. Flashing, in a roofer's sense, is lead let into the masonry where a joint has been raked out, then bent down to cover the tiles or slates. Soakers are small sheets tucked under the courses of tiles or slates beside the stack; at its rear, a lead trough, the back gutter, carries water round to the sides.

Royston Lead sorts its sheet into numbered codes, and its table is specific: Code 3 is "Recommended for lead soakers only", so the flashings and the gutter on a stack call for a heavier code. Each job gets the lead code it needs, and the metal is shaped so it can expand and contract, because a strip fixed too tight cannot follow the heat and cold and will split along its bends.

Split lead is replaced and never smeared over, so the repair can move with the stack.

The stack above the roof is checked too: the pointing, then the flaunching, the mortar shoulder in which the pots stand, and the pots themselves. The street shows little of the stack, so every face of it is photographed for the report. From the loft side we follow the stack down past the rafters, because staining on the brickwork or a tide mark on nearby timber tells us whether to look at the lead or at the flaunching. A split flashing is replaced and never sealed over with a bead of sealant. When lead does have to come off, the old flashings are lifted in sections, the joints raked out and new lead wedged and pointed in. MyJobQuote says lead flashing that is fitted correctly "can last for over 80 years", so a sound flashing is mended, not stripped.

If you plan to take a stack down, two separate rules follow. The Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." Under the Party Wall etc. Act 1996, notice of at least two months has to be served by the building owner before a shared breast is cut away. Our chimney repairs page sets out rebuilding and repointing.

Lead at a Swainshill stack

Flashings
Lead let into joints, laid over the covering
Soakers
Small sheets, one under each course
Back gutter
A lead trough turning water round the stack
Flaunching
The mortar collar that holds the pots
Pointing
Raked out and refilled where joints have opened

Repair or replace the lead?

When is old lead at a Swainshill stack worth keeping?

When it is sound, lying flat and tight in its joints, we leave it where it is and say so in the report. It goes only where it has split, lifted out of the masonry or been patched with sealant, and we show you each of those faults in a photograph first.

Fig. 3 Chimneys, drawn close

Callout 3 of 3

Old frames, a listed church and Huntington's conservation area

The last callout takes us to a gable end on an old frame, where the roof covering stops against the timber. At the verge, the overhanging edge of the roof, we look for a gap between frame and covering, for mortar that has dropped away and for marks on the frame beneath. The wall plate gets checked from the loft too: the timber running along the wall head that carries the rafter ends, together with the rafter feet. Damp in an old frame shows in those places before it marks a bedroom ceiling. The repair is matched to how the house was built, so a patch on an old frame uses materials that suit the frame.

St Mary Magdalene church is listed Grade II* (list entry 1296537, first listed 27 January 1967). A listed building needs consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 for works that would affect "its character as a building of special architectural or historic interest". A listed house keeps its permitted development rights but needs consent as well, so the materials are settled with Herefordshire Council before any tile comes off. Our listed and heritage roofing page describes how we work on those houses.

The conservation area nearest to Swainshill is Huntington. Herefordshire has 64 conservation areas in all, and the council publishes a list that shows where each boundary runs, so look up your house on it. Ask Herefordshire Council whether an Article 4 direction applies as well, before you change the look of a roof.

Building control for a Swainshill address is Herefordshire Council Building Control, on 01432 261938 or at bce@herefordshire.gov.uk, or a registered building control approver may be used instead. A roof window or dormer that is new brings planning questions of its own; our planning guide for roof windows sets them out.

The verge beside a timber gable

SoundVerge bedded tight, with the frame dry and clean beneath
Needs workVerge mortar gone, a gap at the frame, timber stained below

Swainshill roofs: surveys, rules and cost

How do you survey a timber-framed house in Swainshill?

Ridge and hips come first, followed by the stack and its lead, then each gable where covering and frame come together, and the loft last, where the wall plate and rafter ends are looked over. You receive photographs of every fault we find, so you can see them before deciding anything. One written total price follows, with the scaffold included in it.

Does a conservation area affect roof work near Swainshill?

The nearest is Huntington. Herefordshire has 64 conservation areas, and the council's published list shows each boundary, so check your address there before planning any visible change to the roof. Ask Herefordshire Council whether an Article 4 direction applies too, and keep its reply with your quote. Re-covering to match what is there is a separate matter from adding a roof window or dormer, which the planning guide covers.

Which rules apply if the whole roof of a Swainshill cottage is replaced?

Swainshill follows the rules for England. Under the Planning Portal's England test, a re-roof touching less than 25 per cent of the building envelope and also less than 50 per cent of the roof is not normally something you need to apply for. A full replacement goes to building control. New roof insulation brings in Part L: AD L 2021 Table 4.2 gives 0.15 for a new roof, and Table 4.3 gives 0.35 and 0.16 for existing elements.

How does scaffolding on a road near Swainshill get licensed?

Poles and boards that occupy the public highway need a licence under section 169 of the Highways Act 1980. In Herefordshire £167 pays for a licence over a maximum of one month, and extending it costs £123 per month, and the council wants at least 10 days' notice. We arrange the licence with our scaffolder, so you do not need to chase it. A motorway or trunk road falls to National Highways rather than the council.

Can work on a church or chapel near Swainshill go ahead without listed building consent?

Only while the building remains in use for worship and belongs to an exempt denomination: the Church of England (under the faculty jurisdiction), Methodist and Roman Catholic churches, United Reformed congregations and Baptist Union churches with Schedule 1 trustees. No exemption exists for a meeting house of the Unitarians or the Quakers. So does a redundant church, or a chapel that has closed: each needs listed building consent from Herefordshire Council, just as a listed house does, and we price the roof work only after the consent route is clear.

What do third-party surveys say a new roof costs?

A Which? survey from November 2025 put replacing an entire roof at £7,000 to £21,000 before VAT for an average three-bedroom house, and one to six tiles at £75 to £400. Those are national ranges and not our prices. What sets the figure on a Swainshill house is the covering, the pitch and the access to the roof, and the scaffold sits inside that one written quote. Ask any firm whether VAT is included before you compare two figures.

Book a survey of your Swainshill roof

Say what you can see of the roof from the garden or the street, attach a photograph if possible, and we will arrange the survey.

10-year workmanship guarantee, in writing