Callout 1 of 3
Gable verges on Breinton cottages and houses
The verge runs up the side of a gable wall as the finished edge of the covering, and it is the first part of the roof that sideways weather meets. On a Breinton cottage the verge may be finished with mortar, with tiles set to overhang the wall or with a dry-fix verge held down by screws and clips. Each finish ages differently. Mortar cracks and drops away from the gable, a tile at the very end can lift when its fixing loosens, and a dry verge unit can slip if a screw has backed out. On a house with two or three gables, each verge is checked on its own, because the sun, the wind and the shelter of trees differ from one end of a house to the other.
Breinton parish appears in the 1932 Herefordshire inventory compiled by the Royal Commission on Historical Monuments. For the buildings numbered 3 to 8, it recorded two-storey houses of the seventeenth century, timber-framed, under tiled or slate-covered roofs. A frame of that age moves a little with the seasons, and the verge beside it moves too. We look for a hairline gap between the covering and the gable, and for staining on the wall below that shows where water has been running behind it.
Marley states that "Installing to BS 5534 isn't required by law", although it adds that mortar "could no longer be relied upon as the only means of securing the roof covering". BS 8612 is the standard covering dry-fix systems. When a verge is rebuilt, the end tiles are fixed mechanically and the mortar, where we use it, is a finish and not the only thing holding the edge down. On older cottages the bedded look of a verge is worth keeping where the building suits it.
We photograph the whole length of each gable from a ladder, including the end tile at the ridge, the point where the verge meets the eaves and any pointing that has gone. A cracked verge calls for a repair and not a new roof, and the report says that plainly. Our pitched roofing page covers the larger jobs, from re-covering a single slope to a full strip.
Photographed along every verge
- The end tile at the ridge
- Mortar joints along the gable
- Fixings on a dry-fix unit
- The meeting point with the eaves
- Staining on the gable wall below
A gable verge, sound and failing
A verge takes weather from the side as well as above, so it is checked along its whole length.