01432 610152 Get a quote Call 01432 610152

Roofers in Holmer

Roof care for Holmer homes, from the tile covering to the loft below.

Holmer is part of Hereford, 1.3 road miles north of central Hereford, and its parish church is listed Grade I.

Get a free quoteCall 01432 610152

What a Holmer roof survey covers

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Clay and concrete tilesEach covering has its own lifespan range, fixings and weight to weigh up.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Insulation under the slopeRafters, underlay and ventilation at the eaves need a plan before insulating.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade I church nearbyListed buildings follow different consent routes from ordinary houses.

Our route to Holmer

Holmer on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Holmer roofs, from tile to parish church

Tile coverings, loft air and listed neighbours around Holmer

We begin with the tiles on the slope, move into the loft to see how air and insulation behave under them, then step outside again to the listed buildings and conservation areas that shape what can change.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Tile slope; 2 Loft air; 3 Church wall.

Fig. 1 A roof in section, with slope, eaves and wall numbered for Holmer.

Callout 1 of 3

Clay and concrete tiles on the Holmer slope

A tiled slope is a set of overlapping tiles hung from timber battens, with an underlay beneath them as a second line of defence. Clay tiles are fired from clay, and concrete tiles are cast from cement and sand, and the survey notes which of the two your slopes carry. The survey identifies which covering you have, how each course is fixed and where the underlay can be seen from the loft, and each photograph carries a number, so a defect can be traced back to its place on the roof. We then walk the slope looking for cracked, slipped or missing tiles, nibs that have broken and courses that have sagged between rafters.

The published lifespans are ranges that disagree a little. Marley says the BRE set a minimum life expectancy of 60 years for clay roof tiles; the figure covers clay alone. HomeBuilding gives clay tiles "60-80 years". For concrete, Marley says tiles are expected to last for around 60 years, while HomeBuilding gives plain concrete and double Roman tiles "40-50 years". We name both numbers because the sources are not in step, and neither is a promise about your roof. A tile with the same age as its neighbours can have lived a very different life, depending on the shade it sits in and how well the gutter below it drains.

A change of covering needs thought about weight. Planning Portal guidance draws the line for approval where a replacement covering outweighs the original by 15 per cent or more, while AD A para 4.4 words it as a loading increase of "more than 15%". A swap between clay and concrete is the moment to weigh old against new, and a structural check can come first. Fixing matters as well. Marley notes that nothing in law requires installing to BS 5534, though bedding mortar cannot now be trusted as the sole fixing for a covering. Our pitched roofing page sets out repairs and re-covers for tiled and slated slopes.

A slipped tile or two is a repair that takes an afternoon. A slope that has lost its fixings across the board is a different job, and the photographs show which one yours is before any figure is written down. Where tiles can be saved they go back on the roof, and where they cannot, replacements are matched for size, colour and profile. The bundle of old tiles is stacked on the roof or in a skip with a lid, never left loose at the edge of a slope, and the ground below is raked clear of dropped fragments.

Checked across a Holmer tile slope

  • Cracked, slipped or missing tiles
  • Broken nibs on the back of tiles
  • Sagging courses between the rafters
  • Underlay condition visible from the loft
  • Battens at eaves, verge and ridge

Two sources, two lifespans for concrete tile: we quote both and promise neither.

Fig. 2 The slopes, drawn close

Callout 2 of 3

Underlay, eaves ventilation and what insulation changes

Under the tiles, a roof either lets air move through the loft or it does not, and insulation can change that. Marley sets out the ventilation of a cold roof, meaning an insulated loft floor with the roof space left cold above it. With a high-resistance (HR) underlay, it asks for a continuous 25mm opening at the eaves where the pitch is 15° or less, and 10mm where the pitch is more than 15°. An HR underlay blocks water vapour, so the gap is needed. A vapour-permeable underlay of the air-permeable type can rely on the ordinary eaves construction, as long as the ceiling is well sealed and the third-party certification conditions are met.

So the first question on any Holmer loft is what underlay is there and where the air can enter. We check that insulation has not been pushed into the eaves and blocked the gap. Soffit vents that have been painted shut or covered by boards get cleared. We also look for damp on rafters and the underside of the battens, because damp shows where air has stalled.

An insulated loft still needs a way for air to move at the eaves.

Insulation brings Building Regulations with it. In England, AD L 2021 Table 4.3 sets out thresholds for renovated roofs, with an improved U-value of 0.16 against a threshold of 0.35. Where the improved figure is out of practical reach, or payback would stretch past 15 years, para 4.13 lets the upgrade stop at the best feasible value. AD L 2026 replaces these tables on 24 March 2027. Adding insulation at the same time as a re-cover saves opening the roof twice.

Spray foam applied beneath a roof is a separate matter again, and it changes what the survey has to look at under the slope. If your Holmer loft already has foam, our spray foam insulation removal page explains how the foam is assessed and what the removal involves.

What moves the price of a loft job

Loft access
Hatch size and the height of the roof space
Type of underlay
HR or air-permeable decides the ventilation
Insulation depth
More insulation means more material
Roof area
Larger slopes take longer to work through
Foam present
Existing foam adds removal to the work

One written total price, never itemised.

Fig. 3 Eaves and gutters, drawn close

Callout 3 of 3

St Bartholomew's, Holmer House and nearby conservation areas

Callout three is the wall, and around Holmer the wall brings listed neighbours into view, with a Grade I church at the head of the list. Grade I applies to the Church of St Bartholomew, list entry 1099290, first listed on 27 January 1967. Copelands is Grade II, list entry 1099292, first listed on 20 October 1952, the Summer House at Holmer Park is Grade II, list entry 1385469, first listed on 8 October 1998, and Holmer House is also Grade II, list entry 1296577. Historic England records each of them on the National Heritage List.

A listed house needs listed building consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 for any work that alters how the building reads. Churches work differently. For St Bartholomew's we start by asking who owns it and if worship still happens in the building. Anglican churches in use fall under the faculty jurisdiction, and each of four other bodies keeps a separate system of its own: the Roman Catholic Church, the Methodists, the URC and the Baptist Union, whose exemption needs a Schedule 1 trust corporation to hold the chapel. No such exemption covers Unitarian or Quaker meeting houses. If a churchyard holds a scheduled monument, consent for work to it comes from the Secretary of State under section 2 of the 1979 monuments Act.

Holmer is part of Hereford, and the conservation areas that lie around it rather than on it are Aylestone Hill, Hafod Road, Huntington and Widemarsh Common. Herefordshire has 64 conservation areas, and the council's list shows each one. Check which, if any, your own street falls into with Herefordshire Council, and ask whether an Article 4 direction applies there. We bring the survey photographs to that conversation, so the council can see the eaves, the verges and the chimney detail it is being asked about. Our planning guide for roof windows covers windows in a roof slope.

Building control is Herefordshire Council Building Control or a registered building control approver. Our listed and heritage roofing page describes how we approach protected houses and the buildings beside them.

A Grade I church next door does not change your roof, but it changes who you ask.

Consent terms around Holmer

Faculty
Consent route for Church of England churches in use
Listed building consent
Council consent for works affecting a listed building's character
Article 4
A direction that can withdraw permitted development in an area
Scheduled monument
A protected site needing consent from the Secretary of State

Holmer roofs: tiles, lofts, church and stone

How long should a clay or concrete tile roof last in Holmer?

The sources differ, so we quote them separately. Marley says the BRE set a minimum life expectancy of 60 years for clay tiles, and HomeBuilding gives clay 60-80 years. Concrete is around 60 years with Marley and 40-50 years with HomeBuilding. These are published ranges for roofs fitted and kept in good order, not promises, and the survey says where your roof sits.

Which conservation areas lie near Holmer, and does mine fall in one?

Aylestone Hill, Hafod Road, Huntington and Widemarsh Common are the conservation areas around Holmer on the council's list. Whether your own house sits inside one depends on the boundary, which Herefordshire Council's map shows, so hold your street up against it before planning any change people will see from the road. Ask Herefordshire Council whether an Article 4 direction applies as well, since that decides how much you can change without an application.

What gets checked in a Holmer loft before insulation goes in?

We look along the rafters and battens for staining or soft timber, because damp there shows where air has stalled. The underlay is examined at the ridge, at the eaves and around any pipe or flue. We also check the gaps at the eaves and the wiring and pipework that insulation will cover. Each finding is photographed, and anything that needs fixing is done before the insulation covers it.

Does a loft conversion in Holmer need a protected stairway?

Under AD B for England (2019 edition incorporating 2020, 2022, 2025 and 2026 amendments), para 2.5 asks for a protected stairway, or else a top storey that is fire-separated and has an escape route of its own leading outside. Para 2.23 describes a different route for open-plan layouts, built around sprinklers. Escape windows under para 2.10 apply only to storeys within 4.5 m of the ground, so a loft conversion needs a plan before the floor goes down.

What do UK price surveys give for a felt garage roof near Holmer?

Which? reported in November 2025, excluding VAT, £1,400-£3,500 for a single-garage felt roof. That range comes from a survey of UK prices, not from us, and the roof area, access and edge details move any figure within it. The roof is checked for ponding and for soft boards, and the written quote that follows is one total for the whole job.

What do UK price surveys give for clearing gutters?

Which? reported in November 2025, excluding VAT, that clearing all gutters on a house costs £75-£350. That is a typical UK range from a survey, not our price, and it varies with height, access and how much debris has built up. Where a gutter is blocked in several places, the survey notes each one in the photographs, and the written quote is one total.

Arrange a tile and loft survey in Holmer

Share a few details of the roof or loft, then expect a survey and a single total price on paper.

10-year workmanship guarantee, in writing