Callout 1 of 3
Stack, lead and chimney breast on a Westfields roof
The stack is the tallest thing on the roof, so the survey begins there. From the ladder we look at four things: the pots, the flaunching (a mortar fillet seating the pots and shedding water off them), the pointing on each face, and the lead flashings where the stack meets the slope. Pointing is the mortar between the courses of brick or stone. Where it has eroded, the open joints let moisture work into the masonry, and we photograph every face so that you can see the state of each one.
Three pieces of lead do the work round a stack: the flashings, chased into the masonry courses and laid down upon the tiles; the soakers, interleaved with the tiles up each side; and the back gutter, a trough above the stack that steers runoff to both sides. Royston Lead's table lists Code 4 for pitched valley gutters, flashings and soakers, while Code 5 and Code 6 suit flashings, valley gutters and dormers too. Which code goes where depends on the position on the stack. Lead expands and contracts, so a flashing fixed too stiffly will split along its fold and let the damp through.
Taking a stack down is more than roof work. According to the Planning Portal, building regulations approval applies without exception when a chimney breast is removed; the breast is structural. Should a Westfields breast be part of a party wall with next door, the Party Wall etc. Act 1996 comes in: the building owner serves the notice, which sets a wait of at least two months until removal, and a surveyor is called in only when next door disagrees or does not answer within 14 days. Questions about a party wall go to a party wall surveyor, not to building control.
Reaching a stack from the street may mean scaffold on the footway, and then section 169 of the Highways Act 1980 requires a licence. We arrange the licence with our scaffolder and fold the scaffold into the one written total price. Our chimney repairs page covers repointing, rebuilding and the lead in more detail.
What sits on a Westfields stack
- Pots
- Seated firmly and checked for cracks
- Flaunching
- Sloped mortar collar, re-formed where it has cracked
- Flashings
- Lead tucked into joints and dressed over the tiles
- Soakers
- Small lead sheets under each course beside the stack
- Back gutter
- Lead tray behind the stack that turns water round it
Lead has to be free to move, or it splits along the fold and the ceiling pays.















