The stack, its lead and the rules around it
A chimney stack stands proud of the roof, so wind and rain reach it from every direction. We inspect it in four layers: the masonry, the pointing, the flaunching (the sloping mortar collar bedding the pots) and the lead at its foot, where stack and slope join. Lead is the part that fails quietly, so we press along each flashing, a strip let into a mortar joint and bent down over the covering. We also look at the soakers, the small lead pieces laid under each course of tiles beside the stack, and at the back gutter, the lead tray set behind the stack to steer water round it.
Royston Lead's table gives Code 3 as recommended for lead soakers only, while Codes 4, 5 and 6 are listed for flashings. A code is a thickness, and we choose it to suit the job. Lead is long-lived: Less puts its life at 50 to 100 years across roofing uses, HomeBuilding gives 60 to 100 years for a lead flat roof, and MyJobQuote says correctly installed lead flashing can last for over 80 years, so lead in good order is left alone and a lifted or split section is renewed. Sealant over a gap hides the split without curing it, so we cut back to sound lead instead.
Taking a chimney breast away is a separate question. According to the Planning Portal, Building Regulations approval always comes into play when a chimney breast is removed, because breasts are part of the building's structure. If the breast is part of a wall that you and your neighbour both own, the Party Wall etc. Act 1996 gives the building owner the right to cut it away. The owner serves the notice, with two months or more to run before the work starts. A surveyor is needed only if the adjoining owner objects or stays silent for 14 days.
Belmont's nearest listing is the Grade II stable block about 20 yards north-north-east of Belmont Home Farmhouse (list entry 1099701, first listed 22 October 1986). Roof work there calls for listed building consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990. For stack work on any house, see our chimney repairs service.
Layers of a Belmont stack
- Masonry
- Faces and corners for loose or eroded units
- Pointing
- Joints sounded and raked out where hollow
- Flaunching
- The collar round the pots, checked for cracks
- Lead
- Flashings, soakers and back gutter pressed along
- Pots
- Seating, and any lean
Lead fails quietly, so we press along every inch of it.