Callout 1 of 3
The line where tiles stop and the timber begins
The Victoria County History's 1996 account of Newland describes a village grouped round its church and churchyard. From 1617 most of the south side of the churchyard lane "was occupied by a row of almshouses built for the charity of William Jones", and the Old School House on the west side "appears to be" the earliest surviving house. Roofs of that age sit on old timber, and the timber dictates how the roof over it has to be treated. Timber is never still. It swells in damp spells, shrinks in dry ones and settles a little each year, so any covering that butts against a frame has to allow some give. We begin at that meeting line: the gable end, where tiles or slates stop at the wall, and the wall-head beam that carries the rafter feet.
A row brings its own seams. Where one almshouse roof runs into the next, each dividing wall is a joint, and the roof over it has to cope with neighbouring timbers that settle at different rates. We check the covering and the flashings along each joint, and note whether it has opened. Where it has, the fix is a flexible detail at the joint, not more mortar packed into a gap that will open again.
Outside, we scan for a gap between covering and frame, verge mortar gone missing, and dark streaks running down the timbers where water has tracked. Inside the loft, a torch goes along that wall-top beam and the rafter ends, since old timber lets damp appear in those places months before a ceiling is marked.
Repair has to follow the building. A patch that locks covering to frame rigidly will crack when the timber next shifts, so flashings and verges are formed with room to move. Tiles or slates that must come off go back in the same material wherever it can still be sourced, and SPAB's advice is blunt: "Claims of unavailability or long delivery times should always be checked with the quarries."
Frame and roof were built for each other, so extra weight needs thought. For England, the Planning Portal's re-roofing test has two limits: the building envelope (less than 25 per cent) and the roof (less than 50 per cent). Stay under both and, as a rule, nothing is submitted. If a new covering adds 15 per cent or more to the loading, Building Regulations approval is needed and a structural check on the frame and rafters comes first. Options for re-covering are laid out on our pitched roofing page.
Where covering meets frame
Old roof timber will move again, so the repair has to be made to move with it.















