01432 610152 Get a quote Call 01432 610152

Roofers in Mile End

Roof repairs and re-roofs for Mile End, 23.6 road miles south of Hereford.

Our survey climbs to the gable edges first, then reports each fault in pictures with a single written sum.

Get a free quoteCall 01432 610152

Gables, a listed barn and extension roofs

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Gable ends and vergesVerge mortar cracks and lifts, and that opens the edge of the roof.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    A listed barn nearbyFive Acres Farm has a Grade II barn, so changes there start with consent.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Flat-roofed extensionsA flat roof needs a true fall, or water sits on the membrane.

Locating Mile End

Mile End on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Mile End, gable end to flat roof

Three checks on a Mile End roof: the verge, the slope and the extension

We start at the gable edge where the covering ends, move down to the slope and the underlay beneath it, and finish on the flat roofs that were added to the house later.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Verge and barn; 2 Slope and underlay; 3 Flat roofs.

Fig. 1 A Mile End house in section: verge, slope and flat extension.

Callout 1 of 3

Verges, and the listed barn at Five Acres Farm

We start at the gable. On a gabled house the verge is the roof's sloping outer edge, and it is finished either with bedded mortar or with dry-fix units, which are clip-and-screw parts made to BS 8612 so that the edge does not depend on mortar alone. That edge catches wind from underneath. A hand run along it tells us whether the mortar has opened, whether a cut tile has slipped, and whether each unit is fixed to the batten, the timber strip that carries the covering. Where the verge meets the ridge we check the end tile too, because it carries two lines of weather.

Near Mile End, the barn beside the farmhouse at Five Acres Farm is listed Grade II (list entry 1186302, first listed 14 December 1983). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 asks for consent before anyone alters a listed building in a way that touches "its character as a building of special architectural or historic interest". A new verge or a rebuilt ridge can touch it. The owner of a listed building keeps permitted development rights, and the consent comes in addition to them, so the first conversation is with Forest of Dean District Council. Our listed and heritage roofing page sets out how we prepare for it.

Barns and outbuildings carry another question: who is already living under the roof? Birds' nests have protection too. Intentionally taking a wild bird's nest, or intentionally damaging or destroying it, counts as an offence under section 1 of the Wildlife and Countryside Act 1981 for as long as birds are using the nest or still building it. Bats are treated more strictly. Section 9(4) of that Act is breached when a bat is disturbed in its roost, intentionally or recklessly, and regulation 43 of the Habitats Regulations 2017 goes further, since under it, damage to a bat's breeding or resting spot, or its destruction, is an offence even without intent. Natural England's advice on GOV.UK puts "repairing or replacing a roof" on its list of work that may touch bats.

If we see signs of bats or nesting birds in a roof space, work on that part stops, we show you what we found and the next step is agreed before anything is disturbed. Natural England grants any licence the work turns out to need. A plain gable verge on a modern house raises none of this: we rebed or fix it, point it and photograph the finished edge.

Checked along a Mile End verge

  • Mortar cracked, hollow or dropped out
  • Cut tiles or slates that move under a hand
  • A fixing in every edge unit
  • Signs of nesting birds or bats in the roof space
  • The end tile where verge meets ridge

Before a barn roof is touched, we look for a nest or a roost.

Fig. 2 The verge, drawn close

Callout 2 of 3

Under a Mile End slope: pitch, battens and underlay

Callout two is the main slope, where a repair either refixes what is there or replaces it, and pitch decides first. Marley publishes a minimum pitch for each product: 40 degrees for its Canterbury clay tile, 35 for its Ashdowne, 15 for its smooth Mendip concrete tile, with the data sheet for the exact product as the final word. Cupa, a slate maker, ties a 20 degree minimum for natural slate to BS 5534:2014+A2:2018 and to conditions: moderate exposure, a slate 500mm long and a 115mm overlap. It also advises against slate hooks on any pitch under 25 degrees. We read the pitch with a level before suggesting any covering, since a covering laid below its stated minimum is outside what its maker allows.

Under the covering are the battens and the underlay, the sheet membrane stretched over the rafters. A handful of units come up in a sound patch and in a failed one, and both are photographed so you can compare them. A batten that is soft at its ends or split along the nail line comes out as the covering goes back, and an underlay that has torn or perished is replaced while the roof is open, because the covering is already off.

Mile End is in England, so the Planning Portal's test applies to a re-cover: no application is normally needed as long as the work touches under 25 per cent of the building envelope and under 50 per cent of the roof. If the new covering adds 15 per cent or more to the weight, you need Building Regulations approval, with a structural check beforehand. Where insulation is involved, AD L 2021 Table 4.3 pairs 0.35, the threshold for a renovated roof, with 0.16, the improved figure, and AD L 2026 replaces it on 24 March 2027.

Our pitched roofing page covers tiled slopes in more depth. When you compare quotes for a slope, look for the covering, the underlay and the battens by name, and ask whether VAT and the scaffold sit inside the figure, so you know what is being replaced and what stays.

Refix or replace

Can an old slope be refixed rather than stripped?

Sometimes. Where the battens and underlay are sound and the covering is whole, good tiles or slates can be lifted, sorted and refixed with new fixings where they are needed. We photograph the battens and underlay first, so the decision rests on what is under the covering.

Fig. 3 The slopes, drawn close

Callout 3 of 3

Flat roofs on Mile End extensions and outbuildings

Callout three is a flat roof, the kind that caps an extension, a porch or a garage. Flat is a loose word. BS 6229:2025 covers flexible-membrane roofs up to a pitch of 10 degrees, and the NFRC puts its minimum finished fall at 1:80. IKO, a membrane maker, advises designing for 1:40 to reach that figure, because boards settle and a roof laid dead level will pond. We look for water still standing a day after rain, and for the tide mark it leaves when it dries.

A flat roof sheds its water through an outlet or into a gutter at the low edge. We check that the outlet is clear, that the drip edge, the metal trim along the roof's edge, delivers water into the gutter instead of letting it run down the fascia, and that the upstand round any rooflight is sealed.

The covering sets how long a flat roof can be expected to last. For EPDM, a synthetic rubber sheet, HomeBuilding gives 25 to 30 years and Less gives 30 to 50. For GRP, which is glass-reinforced plastic, the figures are 25 to 30 years from HomeBuilding and 25 to 40 from Less. Torch-on felt comes out at 10 to 15 years in HomeBuilding and 10 to 20 in Less. The sources disagree, so treat each range as a guide, not a promise.

At the junction with the house wall, a flashing turns the membrane up the masonry and a cover flashing sheds water over the join. We check that junction before the open field of the roof, because a failed upstand lets water into the wall below it. AD L 2021 puts a re-membraned flat roof in the renovation category, and under regulation 2 of the Building Regulations 2010 a roof is one of the thermal elements, with windows and rooflights left out, so insulation is looked at whenever a membrane comes off. A new rooflight is held to 2.2 in Table 4.2, and a roof window to the window value of 1.4 or WER Band B. The planning side of windows in roofs is in our planning guide for roof windows.

Our flat roofing page covers decks, upstands and outlets. The written total follows the survey and comes as one figure for the whole roof.

A flat extension roof, sound and failing

SoundFalls to the outlet, dry a day after rain
Needs workPonding mid-span, blistered or split membrane, lifted upstand

Mile End roofs: bats, barns, flat roofs and rules

Can a bat roost hold up a roof repair in Mile End?

It can. Bats and their breeding and resting sites are protected by law, and Natural England's advice on GOV.UK lists roof repair as work that may disturb or harm them. When we see signs of bats, the affected part of the job stops and you are told straight away. Any licence is granted by Natural England, and the work restarts on whatever terms that licence sets.

How much of a Mile End roof can be re-covered before approval is needed?

In England the Planning Portal sets a two-part test: under 25 per cent of the building envelope and under 50 per cent of the roof, and in that case an application is not normally needed. Beyond it, building control gets involved. Forest of Dean District Council runs its own building control service, on 01594 812315, and a registered building control approver can be appointed as an alternative.

Is my Mile End house inside a conservation area?

The nearest to Mile End is Coleford Conservation Area. Whether a given address falls inside a boundary is a map question that Forest of Dean District Council can answer, so raise it with the council before you decide on any change that shows from the street. Ask whether an Article 4 direction applies to your address at the same time. Like-for-like repairs and new roof windows are treated differently.

What lifespan can a Mile End extension's flat roof expect?

That depends on the covering, and the published ranges overlap. HomeBuilding puts EPDM at 25 to 30 years where Less says 30 to 50, GRP at 25 to 30 against Less's 25 to 40, and torch-on felt at 10 to 15 against 10 to 20. How well the falls were laid and how well the edges were detailed decide where in a range an actual roof lands. None of these figures is a promise.

What fall should the gutter on a Mile End outbuilding have?

Brett Martin, a gutter maker, gives 1mm for every 600mm. A run hung dead level holds a pool along its length, and the pool brims over the front edge once rain arrives fast. We fix the high bracket first, stretch a line down to the outlet and check each bracket against it. A sagging run can sometimes be re-hung to its fall on the same lengths.

Does a Mile End homeowner take on legal duties when hiring a roofer?

Where the client is a householder, regulation 7(1) of the CDM Regulations 2015 passes the client's legal duties to the one contractor or, if several firms work on the job, to the principal contractor. Where we are the only contractor, regulation 15(5) puts the construction phase plan on us, drafted ahead of any scaffold going up, so the site duties rest with the people who run the site day to day.

Book a gable-first survey in Mile End

Describe the roof and attach a picture, and we will survey from the gable down and write one price.

10-year workmanship guarantee, in writing