01432 610152 Get a quote Call 01432 610152

Roofers in Redbrook

Roof repairs and replacements for Redbrook, a 35-minute drive south of Hereford.

Photographs of the join between wall and covering open our survey, and one written total follows.

Get a free quoteCall 01432 610152

Timber frames, landscape rules and listed lead

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Dark Forest sandstone wallsWhere a slope stops against stone, the pointing and lead are read closely.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Roof windows near the WyeA National Landscape reaches part of the area, which narrows what needs no permission.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade II church and cottagesSt Saviour, Inglewood Cottage and the Central Wash-House are all listed Grade II.

Redbrook in our area

Redbrook on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Redbrook roofs, wall to church lead

Redbrook read in three stops: the stone wall head, the roof windows and the church lead

First the line where roof meets stone wall, then the roof windows and the landscape that surrounds them, and last the listed buildings, where lead and consent routes decide the method.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Wall and plate; 2 Roof windows; 3 Church lead.

Fig. 1 A Redbrook house in section, with the wall plate, the roof window and the lead numbered.

Callout 1 of 3

Where Redbrook's sandstone walls meet the roof

Redbrook sits in Newland parish, and the Victoria County History's 1996 account of that parish says the character of the riverside hamlets of Upper and Lower Redbrook, as it survived in 1992, "was mainly set by building in the dark Forest sandstone during the 19th century". That describes walls, not roofs, but it matters to a roofer. Where a slope stops against a stone gable, a parapet or a stack, the covering relies on pointing and lead, and weathered mortar can open that seam. So our survey spends its first minutes there, because a junction that was snug when it was laid can open up once the joints have eroded.

Inside the roof space the first timber we look for is the wall plate, bedded along the wall head to take the rafter feet. We look at each rafter foot for stains, softness or insect holes, and at the underside of the boarding or battens for dark tide marks. Outside, we look at the verge beside each gable, at the point where a slope butts against a stone wall or stack, and at the pointing above every flashing. A gap there is mended in the way the house was built, never with a bead of sealant across it.

Changing the weight of the covering is a structural question as much as a weather one. The Planning Portal's trigger for a heavier covering is a rise in weight of "15 per cent or more", while AD A, paragraph 4.4, speaks of loading "increased by more than 15%". Swapping thin slates for heavy concrete tiles on an old roof is the kind of change both have in mind, so we check the timbers before a quote is written. The survey photographs show the timbers that would have to carry the new load, and the choice of covering follows from what is actually there. Redbrook is in England, so these are the English rules.

Where the job is a repair and the structure is sound, the work stays small: a few tiles reset, a verge rebedded, a flashing replaced. If a gable does need its covering renewed, the new verge is bedded to follow the line of the stone, and the junction with the wall is flashed and repointed in one visit. Our listed and heritage roofing page sets out how we handle older houses of this kind.

Read at a framed junction

  • Wall plate and rafter feet from the loft
  • Stains or softness on timber ends
  • The roof edge beside each stone gable
  • Pointing and flashing where slope meets wall
  • Tiles lifted by movement in the wall below

Where a slope meets stone, the mortar and the lead decide the roof, so that join is read first.

Fig. 2 Timber frames, drawn close

Callout 2 of 3

Roof openings under the Wye Valley designation

Part of the ground around Redbrook lies within the Wye Valley National Landscape, a designation that used to carry the name Area of Outstanding Natural Beauty. Applications are not the landscape team's to decide, and Forest of Dean District Council takes that role. The designation still shapes some work: inside a National Landscape in England, a Redbrook dormer goes to Forest of Dean District Council before anything is drawn. Our planning guide for roof windows sets out what each type of new opening needs, and it pays to read it ahead of any drawings.

Energy rules apply to any new roof opening. The Planning Portal counts roof windows and rooflights as part of the building envelope, and AD L 2021 Table 4.2 gives the figures for an existing home. A rooflight is held to 2.2, while a roof window is held to 1.4 or WER Band B. Those figures stand until 24 March 2027; from that date AD L 2026 applies, carrying the same values into a renumbered table. The two products carry separate figures, so the order form names which one is meant.

Fitting is only half the job, and the tidy-up is the other half: offcuts, packaging and old tiles leave with us. Around the new opening we weave the flashing into the surrounding tiles so water is sent past the frame, and we check the rafter that was cut for it. From inside the loft, the trimmers that now carry the load around the opening get checked. A good installation leaves the roof as sound as it was, and the photographs show each stage before the tiles close over it.

Forest of Dean District Council maintains the conservation area list, and Newland Conservation Area is the nearby entry for Redbrook, so check whether your own street falls inside any boundary. Ask the same council, too, whether an Article 4 direction covers your address. Our skylights page covers the installation itself.

A question from the loft

Does a new roof window count towards the Planning Portal limits?

Yes. The Planning Portal puts roof windows and roof-lights inside the building envelope it measures against its less than 25 per cent limit, and a new one also has to meet the energy values in AD L 2021 Table 4.2.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

St Saviour, Inglewood Cottage and the Central Wash-House

Redbrook's entries in the Historic England list include a church, a cottage and a wash-house. The Church of St Saviour is Grade II (list entry 1212814, first listed 11 January 1982). Inglewood Cottage is Grade II (list entry 1212820, first listed 24 September 1984), and so is the Central Wash-House (list entry 1186321, first listed 24 September 1984). They lead to two different consent routes, and it pays to know which before anyone sets up a ladder.

St Saviour is a Church of England chapel of ease, built in 1873 to a design by J. P. Seddon and aligned north-south, the Victoria County History records. While worship continues there, roof works are authorised by the faculty jurisdiction of the Church of England, a diocesan procedure, and the listed building consent that houses need is not the route taken. That exemption also reaches Roman Catholic, Methodist and URC buildings while they are in use, and Baptist Union chapels held for their congregations by a Schedule 1 trust corporation; The Quakers' and Unitarians' meeting houses are left out of it, as is any chapel that has shut its doors. Forest of Dean District Council handles listed building consent for those, and if the position of a church is unclear, ask the church before anything else.

A cottage or a wash-house is different. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 forbids works that would affect a listed building's architectural or historic character unless consent authorises them. Listing leaves a house's permitted development in place and adds the need for consent. Lead is where much of that character sits, in valleys, flashings and any covering over a porch or bay. Every position on the roof gets its own lead code, written into the report, and Royston Lead's table lists Code 4 for four uses, from soakers to dormers. MyJobQuote says correctly installed lead flashing "can last for over 80 years", so sound lead is kept.

Poles set down on the public footway or carriageway need a section 169 licence under the Highways Act 1980. We arrange the licence with our scaffolder, and Gloucestershire County Council, as the highway authority, receives the application. For building control, Forest of Dean District Council Building Control answers on 01594 812315, and a registered building control approver is the alternative. Our lead roofing page explains the metal in more detail.

Words on a listed roof job

Faculty
The Church of England's own permission route for works to a church
Listed building consent
Council permission for works that affect a listed building's character
Soaker
A folded piece of lead that sits under each course of tiles
Valley gutter
A lead-lined channel where two roof slopes meet at an angle

Redbrook roofs: frames, landscape and listed churches

What matters most when a sandstone house in Redbrook needs a new roof?

The junctions between slope and stone, and the weight of whatever goes on top. The Victoria County History says the character of the two riverside hamlets was mainly set by 19th-century building in dark Forest sandstone, so the survey reads the pointing and lead at each wall, then the plate and the rafter ends from the loft, before any covering is chosen. A much heavier tile or slate may need a structural check, and the survey photographs show the timbers that would carry it.

Can I fit a roof window near Redbrook with the Wye Valley National Landscape close by?

Possibly, once the checks are done. Part of the area lies within the Wye Valley National Landscape, yet planning applications go to Forest of Dean District Council, since the landscape team does not decide them. Ask the council about any dormer. Roof windows have their own conditions, which our planning guide sets out. Energy rules apply either way, and the roof window figure in AD L 2021 Table 4.2 is 1.4 or WER Band B.

Does the Newland Conservation Area affect a roof in Redbrook?

Newland Conservation Area is close to Redbrook, but being nearby tells you nothing about whether your own house sits in a conservation area. Forest of Dean District Council keeps the conservation area list; compare your address with it before altering a roof's appearance. Whether an Article 4 direction covers the address is another question for the same council. Ask both in writing and file the answers with your survey.

Does the church roof at St Saviour need listed building consent?

Not from the council while worship continues at St Saviour, because Anglican works go through the faculty system. A closed church is different, and so are Quaker and Unitarian meeting houses, where Forest of Dean District Council decides through listed building consent. Anyone who looks after a church should raise the faculty question before work is planned. We supply the survey photographs, a note of each lead code and a method statement for whoever reviews the proposal.

What if I want a heavier covering on my Redbrook roof?

Two sources set the line. The Planning Portal puts it at a rise in weight of 15 per cent or more, while AD A paragraph 4.4 says more than 15%. Either way it is a Building Regulations matter, and a structural check comes first. Forest of Dean District Council Building Control, or a registered building control approver, signs the work off.

What do national price surveys give for a few tiles or a ridge tile?

Which? priced one to six tiles at £75 to £400 and a new ridge tile at £80 to £300 in its November 2025 survey, before VAT. These come from a consumer survey and say nothing about our work. On a Redbrook roof the final figure depends on access, the covering and whether scaffold is needed, and any scaffold the job needs sits inside the one written total.

Book a wall-first survey in Redbrook

Describe the roof and its walls, add a photograph, and a survey visit gets booked.

10-year workmanship guarantee, in writing