Callout 1 of 3
Valleys where two Aylestone Hill slopes meet
Where two slopes of a roof tilt down towards each other, the angle between them is a valley. All the water coming off both slopes drains into that one channel, which makes it the hardest-working part of a roof in a downpour, and a defect there shows itself quickly inside the house. Valleys are built in more than one way. Some are lead-lined gutters set between the tiles or slates, others are formed from tile or slate cut to a curve, and the survey records which kind you have before anything is lifted.
On a lead-lined valley we examine the sheet and its edges. Royston Lead's table lists Codes 4, 5, 6, 7 and 8 for pitched valley gutters, and Code 3 only for soakers. A sheet that has split along a fold, lifted at a lap or worn thin under a patch of leaf litter will pass rain to the boards beneath. The channel must also stay open. Moss, fallen leaves or a slipped slate can dam it, so that rain backs up under the covering on both sides. Clearing the channel is the first task, and a photograph taken once it is clean lets you see the lead for yourself.
Lead lasts well when it is laid properly. HomeBuilding gives a lead flat roof "60-100 years", Less gives "50 to 100 years", and MyJobQuote says correctly installed lead flashing "can last for over 80 years". Those are ranges from sources that differ a little, never promises, and a valley with a poor fall or a thin code can fail sooner. Water also needs somewhere to go at the foot of the valley, so the gutter below it is cleared and its outlet checked as part of the same visit. When a valley does need relaying, the covering is lifted along both edges, the old lead comes out and new sheet goes in with a clear fall towards the gutter. A split lap is a small repair, while a valley worn along its whole length is a relaying job, and the survey separates the two. Our lead roofing page covers valleys, flashings and flat lead work in more depth.
Checked along an Aylestone Hill valley
- Splits or lifted laps in the lead
- Moss, leaves or a slipped slate in the channel
- A clear fall towards the gutter
- Covering at both edges of the valley
- The lead where the valley meets the eaves
A valley carries two slopes of rain in one channel, so we look at it before anything else.