01432 610152 Get a quote Call 01432 610152

Roofers in Twigworth

Pitched-roof repairs and re-roofs in Twigworth, beginning with the edge of each gable.

Each defect is photographed from the ladder, and a single total goes in writing after the survey.

Get a free quoteCall 01432 610152

A small parish and its Grade II houses

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    A small parishThe 2021 Census counted 380 usual residents in the parish.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Yew Tree CottageYew Tree Cottage is listed Grade II, entry 1340296, first listed in 1985.
  • Newer homes with grey concrete tile roofs along a curving estate road
    The Manor House and Twigworth LawnThe Manor House and Twigworth Lawn are listed Grade II as well.

Inside our 30 miles: Twigworth

Twigworth on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Twigworth roofs from verge to Manor House

A Twigworth roof, read from the gable edge to the Grade II wall

First the gable edge, where the verge meets the wall; then the slopes that carry the covering; last the Grade II listed houses at the heart of the parish.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Slopes and weight; 3 Listed houses.

Fig. 1 A Twigworth roof in section, with three callouts numbered along the survey.

Callout 1 of 3

The verge, the gable edge and dry-fix choices

Seen from the lane, the verge is the sloping line at a gable end where the covering finishes and the wall rises beside it. That line faces open sky, which is why we go there straight after the ridge on a Twigworth house. First we find out what holds the edge: a bed of mortar under the end tiles, or a dry system of clips and cappings. Dry-fix systems at both the ridge and the verge fall under BS 8612. Marley, the tile maker, says that "Installing to BS 5534 isn't required by law", and adds that mortar "could no longer be relied upon as the only means of securing the roof covering".

A bedded verge fails in a familiar order. The mortar cracks, a piece drops away, and the end tile loses its grip. Then the underlay and the batten ends behind it take the wet. We press each end tile, look for daylight along the gable from the loft, and check the undercloak, a course of tile, slate or board laid beneath the bed. The report carries photographs of the gap and the missing bed, taken from the ladder, so that you can compare them with the finished edge afterwards. If the undercloak has broken down, it is replaced before the verge is bedded or capped again, because a new edge laid on a rotten base would fail in the same place.

When a verge is rebuilt we pick mortar or a dry system to suit the house. A dry verge has no mortar bed to crack, and its cappings are screwed down. A bedded verge keeps the look of an older gable, and we fix it so that mortar is not the only thing holding the end tiles. Both ways finish in the same place: a gable edge that sheds water onto the roof and not into the wall. The report explains which we chose and why.

Verges are also where a neighbour's work can matter. On a pair of semi-detached houses the verge line runs along a shared wall, and a repair on one side should meet the work on the other without a step. We photograph the join so the line can be followed on both houses. Where a verge is sound but the slope beside it is not, the same visit records both, so the work can be planned as one job. Our pitched roofing page covers the wider work on slopes, gables and hips.

A Twigworth verge, part by part

End tile
Pressed by hand to see if it has lost its grip
Verge bed
Mortar checked for cracks and gaps
Undercloak
The strip under the bed, checked for rot or breaks
Batten ends
Looked at from the loft for staining
Dry-fix capping
Screws and clips counted and tested

A gable edge should shed water onto the roof, never into the wall.

Fig. 2 The verge, drawn close

Callout 2 of 3

Re-covering a slope: pitch, weight and approval

A slope due for re-covering is first measured for pitch, meaning its angle to the horizontal, since every covering has a lowest angle it can safely be laid at. Marley lists a minimum pitch against each of its tiles. For natural slate, Cupa's reading of BS 5534 is a 20 degree floor, on condition that the site has moderate exposure, the slate is 500 mm long and the overlap is 115 mm. Cupa adds that below 25 degrees slate hooks are ruled out. We measure the roof before any covering is suggested, so the choice is made from the roof and not from a sample board. On a slope that is only partly worn, the sound area keeps its covering and the new tiles are chosen to sit beside it, with the join photographed for your records.

Weight is the next limit. A heavier covering is a separate trigger: the Planning Portal sets the line at an increase of 15 per cent or more, while AD A, the structural approved document, speaks of loading raised by "more than 15%". Both figures describe the same worry: a roof frame built for one load carrying another. That is a Building Regulations matter, not a planning one, and someone must confirm that the rafters can carry the new load before the strip-out begins. Swapping a light covering for a heavier one is where that check earns its place.

Roof figures in AD L 2021 for England, in W/(m²·K)
ElementFigure
New roof in an existing dwelling (Table 4.2)0.15
Roof window (Table 4.2)1.4 or WER Band B
Rooflight (Table 4.2)2.2
Existing roof, threshold and improved (Table 4.3)0.35 and 0.16

Until 24 March 2027, AD L 2021 Tables 4.2 and 4.3 apply; from then, AD L 2026 Tables 3.2 and 3.3. Twigworth is in England, so these English figures are the ones that count. Building control for a Twigworth address is Cheltenham and Tewkesbury Building Control, or a registered building control approver. If the survey finds a slope past repair, the roof replacement page walks through a full re-roof, stage by stage.

Measured before a Twigworth slope is re-covered

  • Pitch of the slope in degrees
  • Rafter size and spacing from the loft
  • Weight of the old and new covering
  • Condition of battens and underlay
  • Fixings the chosen covering needs
Fig. 3 The slopes, drawn close

Callout 3 of 3

Yew Tree Cottage, the Manor House and Twigworth Lawn

Yew Tree Cottage is listed Grade II (National Heritage List entry 1340296, first listed 12 August 1985). The Manor House is listed Grade II as well (entry 1091388, first listed 10 January 1955), and so is Twigworth Lawn (entry 1154711). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 deals with works that "affect its character as a building of special architectural or historic interest", and those need listed building consent. A listed owner does not lose permitted development, yet consent is required too; Tewkesbury Borough Council therefore sees the proposed covering, method and fixings before a tile moves. That sequence protects the building and the schedule alike, since a refused detail is far cheaper to change on paper than on the roof.

Look up your address in Tewkesbury Borough Council's own conservation area list before choosing a covering, and check whether an Article 4 direction applies with Tewkesbury Borough Council. An Article 4 direction, in the government's words, "enables the Secretary of State or the local planning authority to withdraw specified permitted development rights across a defined area". New roof windows raise the most questions, and the planning guide for roof windows covers the English rules.

Church roofs raise the exemption question. An Anglican church in use is dealt with through the diocese's faculty system and not through listed building consent. The same exemption covers buildings still used for worship by Methodists, Roman Catholics and the URC, and by Baptist Union churches that a Schedule 1 trust corporation holds. A Unitarian or Quaker meeting house does not, and neither does a chapel closed to services. Scaffold that blocks a village road or footway falls under a highway licence. We arrange the licence with our scaffolder; the figures sit in the scaffold question further down.

For each listed house the report names the building and its entry number, then records the covering and fixings found, which gives the council the facts at first hand. The listed and heritage roofing page sets out the approach in full, from the first visit to the last flashing.

Terms on a listed roof job

Listed building consent
Council permission for works that affect a listed building's character
Article 4 direction
An order withdrawing specified permitted development rights in a defined area
Faculty
The Church of England's consent system for work to its churches
Scaffold licence
Highway authority permission for a scaffold that obstructs the highway

Twigworth roofs: verges, weight, listings and licences

How do you tell whether a Twigworth gable verge is failing?

We press each end tile for movement, look at the verge mortar for cracks and gaps, and go into the loft to look for daylight and staining along the gable. A dry-fix verge gets its cappings and screws tested instead. If the undercloak beneath the edge has rotted or broken, the verge cannot be fixed on its own. Every finding is photographed, so you see the same gap we do.

Does re-covering a roof in Twigworth need Building Regulations approval?

Twigworth is an English address, so the Planning Portal's test is the relevant one. It asks whether less than 25 per cent of the building envelope is affected, and whether less than 50 per cent of the roof is affected. When both hold, an application is not normally required. Work beyond that threshold is taken to Cheltenham and Tewkesbury Building Control, or to a registered building control approver. Separately, the Planning Portal wants approval for a covering that is 15 per cent or more heavier.

What is the minimum pitch for a slate roof near Twigworth?

Cupa reads BS 5534 as giving natural slate a minimum pitch of 20 degrees, for a project in moderate exposure with a slate 500 mm long and a 115 mm overlap. Cupa also says slate hooks should not be used below 25 degrees. Other coverings have their own limits in the maker's product table, so we measure the pitch of your roof first and choose the covering afterwards.

Do the Manor House and Twigworth Lawn share one listing?

No. The Manor House is listed Grade II under entry 1091388, first listed on 10 January 1955, and Twigworth Lawn has its own Grade II entry, number 1154711. Each house is judged in its own right, so a repair, a new covering or a change of material on one is raised with Tewkesbury Borough Council separately from any work on the other. We photograph the roof of each before anything is proposed.

Which scaffold fees apply to a roof job in Twigworth?

We arrange the licence with our scaffolder under section 169 of the Highways Act 1980. Gloucestershire County Council looks after the highways around Twigworth, and its table (prices from 1 April 2025) lists £145 for a minimum period of 28 days and £36 per 7 days for an extension. Applications go in at least 12 calendar days ahead, and scaffolding is included in the written quote.

What do guides say replacing a slate roof costs?

MyJobQuote's average for fitting a slate roof is around £7,800. HomeBuilding (30 September 2025) says a three-bedroom semi with a 65 m² roof in plain concrete tiles may cost £10,000 to £15,000, and says the same house in Welsh slate "might reach £18,000". These are UK-wide figures from other jobs, not a quote for yours. A Twigworth roof is priced once the survey is complete, and the written total covers the work from stripping to clear-up.

Book a verge-first survey in Twigworth

Describe the gable and the slopes in a message, attach a picture where you can, and the survey begins at the edge.

10-year workmanship guarantee, in writing