01432 610152 Get a quote Call 01432 610152

Roofers in Longford

Roof windows, insulation and repairs on Longford's listed farmhouse, lodge and village houses.

Photographs from the roof and the loft come first, then one total price is written up after the survey.

Get a free quoteCall 01432 610152

Longford roofs: light, warmth and old walls

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    New openings in old slopesA roof window cuts through rafters and lining, so the opening is planned first.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Foam under the raftersFoam sprayed under the rafters covers the timber a survey needs to see.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed houses nearbyGrade II farmhouse and lodge roofs call for consent before change.

Locating Longford

Longford on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Longford roofs: light, insulation and listing

What a Longford roof survey reads: the window openings, the insulation and the listed roofs

The survey here runs through three questions in turn. How light gets into the loft, what keeps the heat in once it does, and what the listed buildings around Longford ask of anyone touching a roof.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Roof windows; 2 Slope insulation; 3 Listed roofs.

Fig. 1 A Longford house in section with roof window, slope and verge numbered.

Callout 1 of 3

Roof windows and rooflights in a Longford loft

A loft that needs light starts with a hole in the roof, and a hole in the roof starts with the numbers. Under AD L 2021, Table 4.2 gives the figures for new fabric in an existing dwelling: a roof 0.15, a window at 1.4 or WER Band B (a Window Energy Rating), with rooflights at 2.2 W/(m²·K). The note to the window row reads "Including roof windows and curtain walling". The window row includes roof windows, so a roof window takes 1.4 or WER Band B, and 2.2 belongs to rooflights alone. From 24 March 2027 AD L 2026 takes over, with the same values in Table 3.2.

Windows are counted differently from roofs. The Planning Portal's envelope test, the one that decides whether a re-roof needs an application in England, counts "walls, floor, roof, windows, door, roof windows and roof-lights" in the total, and its limit is "Less than 25 per cent of the total 'building envelope'". A new roof window affects part of the roof and part of the envelope, so it counts towards both measures. Regulation 2 of the Building Regulations 2010 treats a roof as a thermal element and leaves glazing set into it outside the term, so each roof window carries a limit of its own.

A rooflight set into a flat roof is a different product from a roof window. Its 2.2 figure is the limit for glazing in a roof, and the kerb around it has to be formed in the roof deck and covered by the membrane, so the roof is opened first and the glass comes last. BS 6229:2025 is current for flat roofs with flexible coverings, and NFRC reports a minimum 1:80 finished fall across the rest of the surface, which the rooflight must not disturb.

Cutting the opening is the structural part. A roof window sits between rafters, and a wider opening means trimming a rafter and fixing a header across, with the timbers either side carrying the load. That is why the loft is surveyed before any window is ordered. Flashings follow: a kit made for the covering, whether tile, slate or stone, and lead dressed by hand where a kit does not fit. Our roof windows and skylights page covers fitting, and the planning guide for roof windows sets out the planning tests in England, so read it before you settle on a size or a position.

Windows and the roof's insulation

Does a roof window count as part of the roof's insulation?

No. In the Building Regulations 2010 a thermal element is a wall, floor or roof, and glazing in a roof falls outside it. A roof window has its own limit in AD L, and the roof around it has another.

Choosing the window is the easy part; the opening is where the work lies.

Fig. 2 Roof windows, drawn close

Callout 2 of 3

Insulation beneath the Longford slope, and the foam question

Insulation becomes a question whenever a roof is stripped, and a loft conversion is treated as renovation of the retained roof too. For a renovated roof, AD L 2021 Table 4.3 sets a threshold of 0.35 and an improved figure of 0.16. Paragraph 4.13 allows a relaxation: when the improved figure is not feasible, upgrade to the lowest U-value that is, provided it can pay for itself within 15 years. AD L 2026 Table 3.3 replaces these tables from 24 March 2027.

Insulating between the rafters changes how a roof breathes, and Marley's cold-roof guidance separates two cases. With high-resistance (HR) underlay no vapour passes, so ventilation along the eaves is required, while air-permeable (LR) underlay above a tightly sealed ceiling may rely on what ordinary eaves construction already provides, within Marley's limits and with third-party certification in place. Which case a roof falls into decides what insulation can be added without trapping moisture, and the loft survey establishes it.

Foam is the other route, and it carries a history. The Energy Saving Trust says that "There are two main types of spray foam insulation, closed-cell and open-cell." Of closed-cell it says "Its main drawback is that it's not vapour permeable", while open-cell is "the more vapour permeable". Foam sprayed straight onto the underside of the roof will partially seal the timber, and the Trust writes that "this risk should be much lower with an open-cell foam". Both hedges matter: "should" and "much lower" are not promises.

Lenders have views of their own. RICS said in March 2023 that concern had reached particular corners of lending, equity release mortgages among them, so check with your lender. The RICS consumer guide tells readers to ask their mortgage provider if its policy permits the product. A surveyor looking at a foam-lined roof meets timber hidden from view, and where foam is removed, the job is specialist work: our spray foam insulation removal page explains it.

Spray foam, as the Energy Saving Trust puts it

Closed-cell
Not vapour permeable
Open-cell
The more vapour permeable of the two
Rot risk
Should be much lower with open-cell
Lenders
RICS says to check with your mortgage provider

Foam can look finished while it hides the part of the roof that matters.

Fig. 3 The slopes, drawn close

Callout 3 of 3

Listed roofs and nearby conservation areas in Longford

Longford is 28.9 road miles from central Hereford, towards the south-east. Its Grade II listings include 98, Tewkesbury Road (list entry 1341698, first listed 7 December 1987), Manor Farm Farmhouse (list entry 1304800, first listed the same day) and Longford Lodge (list entry 1088668). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 means works that would affect a listed building's character need consent, and listing does not remove permitted development, so the two run side by side. A new roof window on a listed house is a consent question first and a planning question second.

On a farmhouse roof we record the covering, the fixings and the battens before anything is proposed. A repair then reuses sound old tiles, keeps the line of the roof and puts new work only where the old cannot be saved. From the loft the rafters, purlins and trusses are traced for splits, old repairs and sags. A sag along a slope can point to the timbers beneath instead of the covering, and re-covering over a weak timber leaves the cause in place.

Kingsholm, City Centre, Cathedral Precincts and Barbican are conservation areas in the neighbourhood, and all four are Gloucester City Council's. Longford itself sits in Tewkesbury Borough, whose conservation page has an online tool and maps showing whether your own address is inside an area, and the borough can say whether an Article 4 direction covers the street. A direction withdraws named permitted development rights, so ask before the window is ordered. A licence under section 169 of the Highways Act 1980 covers scaffold in the highway, and we arrange the licence with our scaffolder. Building control is Cheltenham and Tewkesbury Building Control, named on the council's building control page, or a registered building control approver, who has been on the Building Safety Regulator's register since 6 April 2024 in England. Our listed and heritage roofing page describes the protected-roof side of the work.

A listed roof is first read, then mended, and only then compared with the rest.

Cost drivers in a Longford roof window job

The opening
Its size, and how many rafters need trimming
The window
Frame, glazing type and flashing kit
Access
Ladders, tower or scaffold, and the highway
Inside
Lining, insulation and making good the ceiling

One written total price, never itemised.

Longford roofs: windows, foam and listing

Which U-values apply to a roof window in a Longford loft?

AD L 2021 Table 4.2, which applies in England until 24 March 2027, gives roof windows 1.4 or WER Band B as their figure, while rooflights take 2.2, so the glass you choose has to meet one of those two figures. The roof around it is 0.15 when new. From 24 March 2027 the same values sit in AD L 2026 Table 3.2, so a job that spans the date should be dated carefully.

Could a Longford loft conversion rely on a roof window to escape?

AD B, the 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments, asks in paragraph 2.5 for a protected stairway or an alternative escape route. Escape windows, under paragraph 2.10, serve only storeys within 4.5 m of the ground. Whether a roof window qualifies is a question for building control before the loft is designed, because a window that sits too high, or opens too little, will not serve as a way out.

Will spray foam under a Longford roof trouble a lender?

It can. In its March 2023 release RICS flagged unease among some lenders, with equity release mortgages given as one example, so put the question to your own lender before work begins. The Energy Saving Trust names lack of vapour permeability as the main drawback of closed-cell foam, which is why a survey of a foam-lined roof looks hard at the timber behind it. Removal is possible, and the survey sets out what that involves, from access to the making good of the rafters afterwards.

What does listing mean for a roof on a Longford farmhouse?

Manor Farm Farmhouse and 98, Tewkesbury Road are Grade II, as is Longford Lodge. Works that would affect a listed building's special character need listed building consent under section 7 of the 1990 Act, whatever the permitted development position. Agree materials, method and any new opening with Tewkesbury Borough Council before work starts, and keep the survey photographs with the application.

Is a Longford address inside a conservation area?

Kingsholm, City Centre, Cathedral Precincts and Barbican lie nearby, all held by Gloucester City Council. For a Longford address, Tewkesbury Borough Council's own list and maps are where you confirm the position. Ask the council as well whether an Article 4 direction applies to your street. Where one does, the permitted development rights it names are withdrawn, which changes the work that needs an application. Either way, put the question before ordering, and keep what the council writes back alongside our survey.

Does adding a roof window in Longford need building control?

A new opening means cut rafters and fresh glazing with a U-value of its own, so put it to Cheltenham and Tewkesbury Building Control, or a registered building control approver, before the window is ordered. The Planning Portal's envelope test counts roof windows and roof-lights in the total, and it is only a test of whether an application is needed. The structure, the window's U-value and the flashing still have to pass inspection.

Arrange a Longford survey, loft and slope

Tell us what you want from the roof, whether light, warmth or a repair, and a visit will be arranged to read it first.

10-year workmanship guarantee, in writing