01432 610152 Get a quote Call 01432 610152

Roofers in Tirley

Repairs and re-roofs for Tirley's timber-framed cottages, farm buildings and newer houses.

We read the building from its walls upward, photograph each fault, and settle one total price on paper afterwards.

Get a free quoteCall 01432 610152

Where Tirley's old frames meet the weather

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Timber frames and fillingsFrames shift, and the gap between a panel and the tiles widens.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Chimneys at the gable endA stack on the gable wall needs its lead checked at every survey.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Barns and farm outbuildingsOld barn roofs can hold nests or bats, and that shapes the programme.

Tirley in the border country

Tirley on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Tirley roofs, read from the frame upward

The timber frame, the gable stack and the listed buildings of a Tirley roof

Our survey here follows the building up from its walls. First the frame and its fillings, then the chimney standing on the gable, then the listed church and farm buildings that bring consent rules with them.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Frame and filling; 2 Gable stack; 3 Listed buildings.

Fig. 1 A Tirley cottage roof in section: frame, gable stack and verge, each numbered.

Callout 1 of 3

Brick and plaster panels beneath a Tirley roof

Start at the walls, because that is where a Tirley roof begins. The Victoria County History (1968) says the older surviving part of the village, along Tirley Street, includes timber-framed cottages "with brick or plaster fillings and thatch roofs", some of them later cased in brick. Oak posts and beams make the frame, and the fillings are the panels packed between them. Timber breathes and shifts, so every join where a covering meets a panel is photographed before anything else: along each gable verge (where the roof ends at the side wall), under the eaves, and above the wall plate, the long beam that carries the foot of every rafter.

Thatch belongs to a specialist thatcher. Where tile, slate, lead or brick sit beside it or stand in its place, we take over: ridges, valleys, stacks, gutters, a porch roof, a tiled extension at the back.

On a tiled or slated cottage the warning signs are quieter. A brown ring on a ceiling, a damp panel beside a window, a tile lying in the garden. In the loft we look for chinks of daylight, blackened timber and panels pulling away from their posts. Outside the camera goes to cracked tiles, slipped slates and crumbling verge pointing, and every picture reaches you with the price.

Age matters too. If the tiles are concrete, the sources differ: Marley expects roof tiles to last "around 60 years", while HomeBuilding gives 40-50 years for plain concrete tiles. For clay, Marley cites a BRE minimum of 60 years.

Whether a re-cover needs paperwork depends first on the side of the border, and Tirley is in England. The Planning Portal's line for England is this: if "Less than 25 per cent of the total 'building envelope'" is affected, and "Less than 50 per cent of the roof is affected", an application is not normally needed. Weight is the other trigger: a covering that "increases the weight of the roof covering by 15 per cent or more" needs Building Regulations approval, and an old frame is a poor place to find that out late. Renovating the roof also brings in Part L. AD L 2021 Table 4.3 gives 0.35 as the threshold and 0.16 as the improved figure, with AD L 2026 taking over on 24 March 2027. Smaller jobs sit under roof repairs.

Looked at on a Tirley frame

  • Verge edges where the covering meets a panel
  • Eaves and the wall plate beneath them
  • Cracked or slipped tiles above ceiling stains
  • Pointing under each verge
  • Fillings that have pulled from the posts

Beside the thatch, the tile, the lead and the stack are ours to repair.

Fig. 2 Timber frames, drawn close

Callout 2 of 3

The gable-end stack and the lead around it

The same history mentions a single chimney at the gable end on several of those cottages. A stack built into a gable wall is the stiffest thing on the roof, and the covering around it is the part that has to give. If the metalwork fails, water gets in at that joint, so lead does the sealing: a flashing tucked into the mortar courses and laid over the tiles, soakers folded and slid beneath the tile courses along each side, with a back gutter, a lead-lined trough, set upslope of the stack to carry run-off round it. Royston Lead's table marks Code 3 "Recommended for lead soakers only", and flashings appear under Codes 4, 5 and 6. Heat expands lead, so we dress it with room to move.

Above the lead there is masonry to check: pointing, pots, and the flaunching, the sloped cap of mortar that grips them. None of it shows from the lane, which is why we photograph each face and the cap and send them on. Lead that has split is cut out and a new piece let in, because a smear of sealant over it is no repair. MyJobQuote says correctly installed lead flashing "can last for over 80 years", and that wording hedges: sound lead earns its place, tired lead is replaced.

Getting at the stack shapes the job. A look from a ladder at the end wall is enough for a survey, but renewing flashings needs both hands free, so a tower or scaffold goes up at the gable and crawling boards are laid over the tiles beside the stack so that boots do not crack them.

Removing a stack is a separate question. On chimney breasts the Planning Portal is plain: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." If the breast stands on a shared wall, the party wall rules apply. The notice for work to a party wall is the building owner's to serve, at least two months in advance; surveyors are appointed should the neighbour dissent, or leave 14 days without a reply. Rebuilding and repointing above the roofline sit on our chimney repairs page.

Lead at a gable stack

Apron
Lead along the foot of the stack, dressed over the tiles
Step flashing
Cut into the mortar joints up each side
Soakers
Code 3 lead, one under each course
Back gutter
A lead tray behind the stack
Flaunching
The mortar cap holding the pots

A gable stack is a weak joint in a strong wall, and the lead is what keeps it dry.

Fig. 3 Chimneys, drawn close

Callout 3 of 3

St Michael's, Tump Farm's barn and Red Castle

Tirley's listed buildings range from a Grade I church to farm buildings. St Michael's church is Grade I (list entry 1091384, first listed 10 January 1955). Barn, Tump Farm and Prince's Plume are both Grade II, listed on 12 August 1985 (list entries 1340333 and 1154529), and Redcastle is Grade II too (list entry 1340312): the county history calls Red Castle a 17th-century brick and timber-framed house, formerly a farm-house. Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, works affecting "its character as a building of special architectural or historic interest" need listed building consent. Listing does not remove a house's permitted development rights, yet consent is needed as well, so we agree the method and the materials with Tewkesbury Borough Council before any tile is lifted.

St Michael's takes another road. A Church Near You lists it as St Michael and All Angels, a Church of England church whose benefice holds Sunday services, so for as long as services go on there, roof work is authorised by faculty, leaving listed building consent out of the picture. The 1968 history describes a church of shaly local stone with limestone dressings, "and the roofs tiled", and says the trussed rafter roofs of chancel and nave were rebuilt in 1894. Were it ever closed for worship, listed building consent would take over, as it does for Unitarian and Quaker meeting houses.

Farm buildings of this age bring their own questions: what the roof timbers will carry, whether the walls can take a heavier covering, and what shelters in the roof space. A licence under section 169 of the Highways Act 1980 comes first when scaffolding will obstruct a highway, and Gloucestershire County Council is the highways authority for Tirley's roads.

Conservation area status is for Tewkesbury Borough Council to confirm, so look your street up on the council's own list and ask whether an Article 4 direction applies to it. Roof windows have their own rules in England, and our planning guide for roof windows sets them out. Building control comes from Cheltenham and Tewkesbury Building Control, named on the council's building control page, or from a registered building control approver. The way we work on protected roofs is set out on the listed and heritage roofing page.

A listed roof is repaired to the way it was built, not the way that is quickest.

A verge on a listed roof

SoundVerge bedded tight, with the old tiles reused
Needs workOpen joint in the bed, tiles sliding at the edge

Tirley roof questions, answered

Can a Tirley cottage keep its frame panels through a re-cover?

In principle, yes: a new covering is laid on rafters and battens, and the panels under it stay out of the job. The care goes into the verges and eaves, where covering and frame meet, so we photograph those edges before stripping and rebuild to the same line. Weight is the thing to watch on an old frame, since a covering heavier by 15 per cent or more is where the Portal draws its line.

Who should look at thatch on an old cottage in Tirley?

Call a specialist thatcher first. The Victoria County History mentions thatch roofs on timber-framed cottages in the older part of the village, and thatch is a trade apart from ours. Tiled extensions, lead, guttering, a porch and the chimney on the same house are what we survey, and the two visits can be arranged around each other so that the house is dealt with as one building, with one set of photographs for you to keep.

Which listed Tirley buildings need consent for roof work?

St Michael's church is Grade I, and Barn at Tump Farm, Prince's Plume and Redcastle are Grade II. Works that alter a listed building's special character need listed building consent under section 7 of the 1990 Act, alongside any planning rule. St Michael's, being Anglican and in use, follows the faculty route in place of that. Tewkesbury Borough Council can confirm whether your own house is listed and what it holds on file.

Does a re-cover of my Tirley roof mean an application?

In England the Planning Portal sets the starting test: work touching less than 25 per cent of the building envelope and less than 50 per cent of the roof leaves, as a rule, nothing to apply for. Larger jobs go to building control, which here means Cheltenham and Tewkesbury Building Control or a registered approver. Adding roof insulation brings in Part L, and our survey notes which side of those limits your job falls on.

How is scaffold handled on a Tirley lane?

We arrange the licence with our scaffolder when poles stand on the highway. Gloucestershire County Council lists its scaffold licence at £145 for a minimum period of 28 days, with extensions at £36 per 7 days, and its terms ask for the application to be in twelve calendar days beforehand. Scaffold sits inside the one written price, so the quote you receive already allows for it.

What changes if bats roost in a Tirley barn roof?

Work waits until the next step is clear. Natural England's page on GOV.UK lists roof repair and replacement among works that may disturb a roost, and licences, where available, come from Natural England. Nests are covered separately: section 1 of the Wildlife and Countryside Act 1981 catches anyone who intentionally damages or destroys one that is occupied or being built.

Arrange a survey of your Tirley roof

Describe the cottage, barn or house, add photographs if you have them, and we will arrange a visit.

10-year workmanship guarantee, in writing