01432 610152 Get a quote Call 01432 610152

Roofers in Corse

Roof repairs and re-roofs for Corse, 23.9 road miles east of Hereford.

Our survey starts at the gable edges and follows the lead, with pictures of every fault and a single total.

Get a free quoteCall 01432 610152

Cottage gables and a shared conservation area

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Gabled cottage endsGable verges take wind from below and need pressing along their length.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Listed cottagesWayside Cottage and Copeland's Cottage are Grade II, so consent comes first.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Lead at the stackLead flashings and soakers at a stack need checking for splits.

Around Corse

Corse on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Corse, gable to slope

Gables, lead and listed cottages: three checks on a Corse roof

Our Corse survey starts at the gable edge, follows the lead wherever a roof meets a wall or a stack, and ends on the slopes of the listed cottages in the conservation area.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verges; 2 Lead work; 3 Cottage slopes.

Fig. 1 A Corse cottage in section: gable verge, lead junction and slope.

Callout 1 of 3

Corse gables, low and brick, and their verges

The Victoria County History's 1968 account of Corse parish describes the Chartist settlement at Snig's End, where about half the houses were built in Corse: single-storey brick cottages with "a front with a central pediment or low gable". A gabled roof ends in a triangle of wall, and the covering stops short of that wall at a verge. An old gable may not be true, so a verge on one of these cottages follows a line that is anything but straight, and the repair has to follow it.

There are two ways to finish that edge: a mortar bed, or dry-fix units made to BS 8612. Marley, a tile maker, notes that BS 5534 is not required by law, yet that after the 2015 amendments mortar alone was no longer enough to secure the covering at the edge. So on a verge we look for both: the bedding that closes the gap, and a mechanical fixing that holds each edge tile. Beneath an edge course, an undercloak, a narrow strip of slate or board, tilts the tile inwards so that water runs onto the roof and not down the wall. We check that it is there, and that it has not rotted or slipped.

A hand pressed along the edge tells the story. A tile that moves under the palm has lost its bedding, a joint that sounds hollow has lost its grip, and an end tile that has dropped leaves the first batten open to the sky. We photograph each defect against the stone behind it, so you can see where the roof meets the wall and how large the gap has become.

Seen from the roof space, the underside of a verge tells its own story. Daylight showing between wall and covering, soft batten ends and a damp stain on the gable wall all mean the verge has been letting water in. We look for them before going outside, so we know where to press, and we note which of them are cosmetic and which are structural.

Where a dry-fix verge suits the house we tell you, and where mortar keeps the look of an older cottage we keep mortar and add the fixing underneath. Our pitched roofing page covers verges, ridges and hips in more depth. The written price for a verge job comes after the survey, as one figure, with the scaffold and the waste included.

A Corse verge, part by part

Bedding
Full and sound, with no hollow joints
Edge tiles
Fixed individually, none rocking under a hand
Undercloak
In place and tilting the edge inwards
Gable wall
Pointing intact where stone meets the verge

On an old gable the verge follows the wall, and the repair has to follow the verge.

Fig. 2 The verge, drawn close

Callout 2 of 3

Lead flashings and soakers where Corse roofs meet walls

Wherever a roof meets a vertical surface, the junction needs lead or a substitute: at a chimney, against a taller wall, beside a dormer or in the angle of two slopes. A cottage with a gable, a stack and a lean-to has several of these in a few square metres. We follow the lead round the whole roof as one run and photograph each junction, because a fault in one can show as a stain in a room at the other end of the loft.

The standard that governs this material is not the one that governs flat roofs. BS 6229 is for flexible membranes, so lead goes by BS 6915, the standard AD C names for it. Royston Lead sorts its sheet by code and lists a use for each: Code 3, at 1.32 mm, is marked for soakers only, while Codes 4, 5 and 6, at 1.80, 2.24 and 2.65 mm, are the sizes listed for flashings. We choose the thickness for the position and never use thin soaker lead to do a flashing's work.

On life expectancy, MyJobQuote's line is that lead flashing, installed correctly, can last for over 80 years. Note the hedge in those words, which we keep. A flashing with a split across a fold, a dressing lifted away from the wall or a joint that has pulled out of the mortar is repaired or replaced on its merits, and we show you the photograph first. Sealant is only a stop-gap on any of them.

At a stack the lead is cut into pieces: an apron across the downhill face, stepped flashings up each side and a tray behind. Each is chased into a mortar joint, so the pointing there matters as much as the lead itself, and a flashing is as secure as the mortar joint behind it.

Lead also has to move. It expands in warm weather and contracts again, so a long run is made in lengths with laps, and the dressing at each end is left free to slide. That is why a long flashing nailed along its whole length tears. Our lead roofing page covers codes, laps and dressing. If a stack is to be taken down as well, the Planning Portal is plain that Building Regulations approval always applies to removing a chimney breast.

Lead checked on a Corse roof

  • Splits along the folds of a flashing
  • Dressing lifted from the wall or stack
  • Joints pulled out of the mortar
  • Soakers thin, torn or missing under courses
  • Sealant used as a cover-up
Fig. 3 Leadwork, drawn close

Callout 3 of 3

Wayside Cottage, Copeland's Cottage and the conservation area

Corse has Grade II listed cottages of its own. Wayside Cottage (list entry 1302645) was first listed on 17 March 1987, Copeland's Cottage (list entry 1341964) on 6 December 1976, and Copelands is Grade II as well (list entry 1302699). The parish church of St Margaret, which the same 1968 account describes as "of stone with a roof partly of Cotswold stone slates and partly of Welsh slates", is Anglican. For as long as a congregation gathers in it, reroofing there answers to the diocese's faculty process, with no council consent involved. Forest of Dean District Council also lists the Staunton/Corse Conservation Area, which lies close to the centre of the village. For a listed building, section 7 of the 1990 Act makes consent a precondition of work that alters its character, and a different covering, a changed ridge or a new rooflight can do that. Our listed and heritage roofing page shows how a repair is matched to the existing roof.

On a slope the question is how much is changing. Corse is in England, so the Planning Portal sets the test for a re-cover: normally no application while the work touches under 25 per cent of the building envelope and under 50 per cent of the roof. A heavier covering, by 15 per cent or more, needs Building Regulations approval with a structural check. Planning for roof windows is in our planning guide for roof windows, and you can ask Forest of Dean District Council whether an Article 4 direction applies to your address.

Old cottages raise the question of insulation under the slope. AD L 2021 Table 4.3 gives 0.35 as the threshold and 0.16 as the improved figure for a renovated roof. Spray foam is one route, and under an old roof it needs thought. RICS's consumer guide asks owners to check with their mortgage provider whether the lender's policy allows such products at all, and foam applied to the underside of a slope can seal the rafters in. We would rather talk it through with the timbers in front of us, and with a lender if foam is on the table.

Where an old roof is slate or stone slate, as at St Margaret's, sound units can be kept. SPAB, which advises on old buildings, says a slate roof in good order is likely to run past 100 years, and when a supplier calls stone or slate scarce or slow to deliver, its advice is to ask the quarries direct. So we sort the sound slates, keep them, and source matching ones for the gaps.

A cottage slope, sound and failing

SoundCovering lies flat, battens firm, no light through the underlay
Needs workSlipped or cracked units, soft battens, torn underlay

Corse roofs: gables, lead, listings and insulation

Can the covering on a Grade II cottage in Corse be changed?

It can, with consent. A different covering can alter a listed building's character, so Forest of Dean District Council is asked first, with the permitted development rights on the house left in place beside it. We photograph the existing roof, record its size and colour, and propose a matching repair. Replacement is offered only when the survey shows repair will not hold.

Does the Staunton/Corse Conservation Area change how a Corse roof is repaired?

It can. Forest of Dean District Council can tell you if your address sits within the designated boundary, and if an Article 4 direction applies to it. New dormers and windows in the roof are handled separately, and our planning guide covers them. Repairing a roof like for like is a different question from changing its covering, and the council can say how it sees each one.

What do chimney lead flashings cost to renew near Corse?

In MyJobQuote's guide a chimney lead flashing patch averages around £200 and a full replacement around £570, while full leadwork ranges from £350 to £920. Checkatrade lists lead flashing repairs at £50 to £70 per metre, excluding VAT. Those are published UK-wide ranges, nothing more. Our own figure is fixed once the survey is done, as a single total in writing.

Is it worth repairing a Corse cottage roof instead of re-covering it?

Where the fault is local, a repair is the better buy, and we say which parts need replacing and which can stay. Which?, surveying Trusted Traders in November 2025 and excluding VAT, gives £75 to £400 for replacing between one and six broken or missing tiles, and £7,000 to £21,000 for a whole roof on a three-bedroom house of average size. The figures cover the UK as a whole; what we charge is fixed after the survey and written as a single total.

Do Corse gable verges need mortar, or can dry-fix units be used?

Either can work. Dry-fix units made to BS 8612 hold the edge mechanically, and mortar bedding still closes the gap beneath the edge tiles. After the 2015 amendments to BS 5534, Marley says, mortar alone could not be relied on to secure the covering. On a listed cottage the choice goes to Forest of Dean District Council before the verge is touched.

How much notice does scaffold on the road outside a Corse cottage need?

Any scaffold put up on a public road or pavement in Corse requires a section 169 licence under the Highways Act 1980. Gloucestershire County Council's fee is £145 for a minimum period of 28 days, with £36 per 7 days for any extension (prices from 1 April 2025), and it wants applications in at least twelve calendar days in advance of putting the scaffold up. We arrange the licence with our scaffolder. That wait is built into the start date we give you.

Have your Corse gables and lead checked

Send a photo of the gable or the stack, say what has worried you, and we can survey it and write up one price.

10-year workmanship guarantee, in writing