01432 610152 Get a quote Call 01432 610152

Roofers in Parkend

Roof repairs and re-roofs in Parkend, a village with a Grade II church and vicarage.

Our survey begins on the ridge, we photograph the trouble on your own slopes, and you get one total price in writing.

Get a free quoteCall 01432 610152

Roof faults to expect around Parkend's listed buildings

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridges over listed roofsA loose ridge tile on a listed roof needs the right consent route first.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Vicarage-style chimney stacksA stack with failed lead lets rain onto the ceilings and walls below.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Gutters under tree coverLeaves block an outlet, and an overflowing gutter soaks the wall below.

Where we reach Parkend

Parkend on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

A Parkend roof, ridge to gutter

Reading a Parkend roof: the listed ridge, the vicarage stack and the gutter line

A Parkend survey works downhill in three steps. We begin at the apex, move to the stack together with its lead, and finish along the gutter line, with the listed buildings and council rules covered at the point they bite.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge line; 2 Stack and lead; 3 Gutters and rules.

Fig. 1 A Parkend roof in section, with ridge, stack and gutter numbered 1 to 3.

Callout 1 of 3

Ridges over St Paul's church and The Vicarage

Anyone surveying roofs in Parkend meets three listed buildings by name. St Paul's church carries a Grade II listing (Historic England list entry 1186362, listed on 12 December 1953). The Vicarage is Grade II too (list entry 1288800), and Dean Field Studies Centre (list entry 1213931) shares that grade and the listing date of 24 September 1984. A ridge on a listed roof forms part of the building's character, so we give it more care than a routine patch would get, and the survey photographs show the caps from both sides.

The ridge is the row of capping tiles that sits along the apex of a pitched roof. Where those caps are bedded in mortar, a crack in the bed is the first sign of trouble: water gets under the cap, frost works at it, and the cap starts to rock. Marley, the tile maker, states that "Installing to BS 5534 isn't required by law" and adds that the 2015 amendments "made it clear that mortar could no longer be relied upon as the only means of securing the roof covering". For that reason a rebedded ridge gets mortar and a mechanical fixing under each cap. BS 8612 is the standard for dry-fix ridges, in which a full mortar bed gives way to clips and screws.

Consent is the first question on a listed roof. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 asks for it where works "would affect its character as a building of special architectural or historic interest", and a different ridge material could do exactly that. For a listed house, the question goes to Forest of Dean District Council. St Paul's is a different case. It is an Anglican church that still holds weekday services, so work on its roof sits with the diocese's faculty system rather than with the council, and that would change only if it closed for worship. Pricing it therefore starts with a call to the parish.

An unlisted house nearby is simpler. We lift the caps one at a time, look at what lies beneath, and send a photograph of every cap that has lost its grip. Each picture is labelled with the cap's position, so the repair list and the pictures match. Where only the mortar has failed, rebedding is the answer and we recommend it. Our roof repairs page covers the small jobs that do not need a full scaffold.

What the ridge survey covers at Parkend

  • Caps that rock under a hand
  • Bed mortar cracked or fallen away
  • A clip or screw under every cap
  • The end cap at each gable
  • The list entry, where the building is listed

On a listed roof, the consent question comes before the repair.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Chimneys of a vicarage-style house, and their lead

Where a stack stands proud of the slope, each of its faces takes whatever weather arrives. Where the stack leaves the roof, lead closes the gap. At the base of each face a flashing runs from a mortar joint down over the tiles. Along the sides, soakers (small folded sheets of lead) are slipped under the courses. Behind the stack, a back gutter in lead turns the run-off around it and sends it down either side.

Royston Lead's brochure for cast sheet gives every thickness a code. Code 3 is "Recommended for lead soakers only", while Codes 4, 5 and 6 are listed for flashings. We pick the code for the job, then form the lead with room to expand and contract. MyJobQuote notes that correctly installed lead flashing "can last for over 80 years", so good lead stays and only the failed run is replaced.

The masonry gets its own inspection. Pointing is the mortar face between the units, flaunching is the sloped collar of mortar that holds the pots, and a pot can crack on its own. Nobody can judge a chimney crown from the pavement, so your report carries close-up pictures showing every face and the mortar collar. Up in the loft we also look for tide marks on timbers beside the stack, because a slow leak can stain the wood before it reaches a ceiling. A split in the lead is answered with new lead, and sealant smeared over it is not a repair.

Taking out a stack along with its breast is a bigger decision. The Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." Where the breast belongs to a party wall, the building owner's notice under section 3 of the Party Wall etc. Act 1996 must arrive with the neighbour at least 2 months before work begins. Surveyors get appointed if the neighbour dissents or says nothing within 14 days. A stack on a listed house such as The Vicarage is part of the protected fabric, so consent comes first. For rebuilding and repointing, see our chimney repairs page.

Lead at the foot of a stack

SoundFlashing tucked into the joint, lead lying flat on the tiles
Needs workLead split or lifted, mortar gone from the joint above it

Callout 3 of 3

Eaves, gutters and who decides what in Parkend

At the eaves a roof passes its water to the gutter, and the gutter has to carry it off. Trees overhanging a roof drop leaves into the run, and once an outlet blocks, water slops over the front lip and streaks the wall. The manufacturer Brett Martin recommends laying a run to "1mm for every 600mm", which means a length that holds standing water, or drips from a joint, has probably shifted on its brackets. We look at each bracket, joint and outlet in turn, then pour water along the length and watch where it settles. Leaf guards can help under trees, though they still need clearing. A gutter that copes with a light shower can still fail in a downpour, so the test uses a generous volume of water.

Parkend sits 26.5 road miles to the south of central Hereford, a drive of around 45 minutes. Planning decisions for the village rest with Forest of Dean District Council, which also staffs the building control desk you would phone. Pillowell Conservation Area lies close by, and the council's own list of conservation areas shows whether your address sits inside it. Ask the council too whether an Article 4 direction applies to your street, and do that before you alter anything the road can see. Our listed and heritage roofing page describes our way with protected houses.

For a re-roof the Planning Portal sets two limits for England: under 25 per cent of the building envelope and under 50 per cent of the roof, within which an application is not normally needed. Roof windows and dormers raise different questions, which the planning guide for roof windows answers.

The district council's own building control team takes calls on 01594 812315, and a registered building control approver is the alternative. Lydney has the closest railway station, 3.9 miles away as the crow flies. Scaffold that occupies the road or footway must be licensed under section 169 of the Highways Act 1980. We arrange the licence with our scaffolder, and the waiting time is allowed for in your start date.

A question from the eaves

How can I tell a gutter has lost its fall?

Look for water lying in the run after rain, a drip at a joint, or a green stain down the wall below. Any of these suggests the brackets have moved. We test the whole run and reset the fall so water reaches the outlet.

Parkend roofs: listed buildings, stacks and gutters

Does a ridge repair on The Vicarage at Parkend need consent?

The Vicarage is Grade II (list entry 1288800), so section 7 of the 1990 Act reaches any works that would alter its character. Rebedding a few caps may count as like-for-like repair, but swapping the ridge material is the kind of change that needs consent from Forest of Dean District Council. Ask the council before work starts, and we will photograph the ridge so you can show what is there now.

Which conservation area is close to Parkend?

Pillowell Conservation Area is the closest one, with its boundary held by Forest of Dean District Council. To learn whether a given address falls inside, look at that map. Ask the council, too, whether an Article 4 direction covers the street. Both answers are worth having before you alter a roof slope facing the road, so both are raised during the survey, and the council's answer goes in the report.

How does a church roof job at Parkend get approved?

St Paul's church is Grade II (list entry 1186362) and Anglican, with services on most Wednesday mornings. While it stays in use, roof work there falls under Anglican faculty rules, not for listed building consent from the council. Were it ever to close, the council would decide. A call to the parish confirms the route before anything at all is priced.

Does a Parkend re-roof need an application?

Parkend is in England, where the Planning Portal sets the test. Two limits must both hold before a roof change normally escapes an application: under 25 per cent of the building envelope and under 50 per cent of the roof. Bigger jobs go to building control, and so does a heavier covering that adds 15 per cent or more weight. Forest of Dean District Council Building Control answers on 01594 812315.

What notice does scaffold on a Parkend road need?

Gloucestershire County Council licenses scaffold on its roads and charges £145 for a minimum of 28 days and then £36 per 7 days for an extension, and wants applications lodged 12 calendar days or more before erection starts. We arrange the licence with our scaffolder, and the start date you are quoted already allows for that wait. If anything else about the street affects access, we raise it at the survey, before any date is promised.

Why does a gutter overflow at the front in Parkend?

A blocked outlet is the first suspect, especially where trees overhang the roof. A run that has dropped out of line comes next, since Brett Martin recommends 1mm for every 600mm. We clear the outlet, check the brackets and test with a good volume of water before suggesting anything bigger. If a run is past saving, the written price covers a renewal, and the old gutter leaves with the other waste.

Book a Parkend survey, ridge first

Tell us what is wrong with the roof, and we will inspect from the ridge downwards and write the price down.

10-year workmanship guarantee, in writing