Callout 1 of 3
Ridge lines, hips and Whitehill Farmhouse
The ridge is the top line of the roof, and a Broadwell survey starts there. Capping tiles run along it, bedded on mortar, and a hip, the sloping outside corner where two slopes meet, is finished in the same way. We press each capping tile for movement, look for mortar joints that have opened, and check the junction where the ridge meets each hip, since two lines of weather end at that point. Photographs of the ridge taken from above go into the report, because the view from the ground hides most of it.
BS 5534:2014+A2:2018 sets out how slates and tiles are fixed, and BS 8612 is the specification for dry-fix units on ridges, hips and verges, in which clips and screws hold the capping. Marley's line is that fitting to BS 5534 is not a legal requirement. Its point about mortar is narrower: since the 2015 amendments, it says, mortar cannot be the only thing holding the covering on. So every capping tile on a rebedded ridge is also screwed or clipped down, and we tell you which fixing was used and where.
The nearest listed building to Broadwell is Whitehill Farmhouse, Grade II (list entry 1299280, first listed 14 December 1983). Historic England's list entry is the place to check what is protected. For a listed house, section 7 of the 1990 Act asks for consent before work that affects its character, so Forest of Dean District Council hears about a ridge rebed, a different capping or a new covering before it is done. A house that is not listed needs none of that for a plain rebed. Our roof repairs page covers ridge and verge repairs in more depth.
After the ridge we look down both slopes from the top. Slipped tiles near the ridge line are visible from above even where the ground shows nothing, and so are cracked units, moss banks and a sagging line along the ridge board. Each is photographed where it lies.
Where ridge and hips meet, capping from three lines comes together, and that joint is the hardest on the roof to keep closed. We bed and fix those units first and work outward along each run, so that the awkward joint is not left to the end of the day. A ridge that has been rebedded properly carries a clean, straight line, and we photograph the finished ridge from the same positions as the first set so the two can be laid side by side.
On the Broadwell ridge line
- Capping tiles that rock under a hand
- Open or crumbling mortar between units
- A mechanical fixing on every capping tile
- The junction where ridge meets hip
- A true line from end to end
From the ground you see the front of a ridge. From above you see all of it.















