01432 610152 Get a quote Call 01432 610152

Roofers in Whitecroft

Chimney, eaves and re-roofing work in Whitecroft, from cottage rows to valley-side streets.

We climb to the stacks before anything else, then check how the eaves breathe, and send photographs with a single quote.

Get a free quoteCall 01432 610152

Whitecroft roof faults, found from the top down

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Brick stacks and leadChimney lead can lift where a stack faces the weather on every side.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Eaves that cannot breatheBlocked eaves gaps and the wrong underlay leave a loft damp.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Coverings near the endA tired covering gets a patch, a partial re-cover or a full strip.

Around and about Whitecroft

Whitecroft on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Whitecroft roofs from the stack outwards

Stacks, eaves and coverings across Whitecroft's cottage rows and valley-side streets

We begin the survey at the chimney stacks, moves down to the eaves where roof and wall meet, and closes on the slopes, where the question is how much covering really has to change.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Stack and flashings; 2 Eaves and underlay; 3 Slope covering.

Fig. 1 A Whitecroft roof in section, with stack, eaves and slope numbered.

Callout 1 of 3

Whitecroft chimneys: the stack, the lead and the joints

In its 1996 volume on the Forest of Dean, the Victoria County History mentions brick cottages put up along the Tufts to Bream road, and a later land society that set out streets for an estate on the lower slope of the valley, in its account of the settlement round Whitecroft. Whatever a stack in either setting is built from, it stands clear of the slope and meets rain on all four faces, so the survey starts there. We read each face of the stack, each joint, and the pots.

The junction between stack and slope is sealed with lead. Flashing is the lead strip chased into the stack and folded down onto the tiles. Soakers are the small folded lead pieces that interleave with the tile courses along each side. The back gutter, a lead tray set behind the stack, hands run-off to the slopes either side. Royston Lead's chart gives each thickness a code: Code 3 is "Recommended for lead soakers only", and Codes 4, 5 and 6 are listed for flashings. On leadwork, MyJobQuote's line is that correctly fitted flashing "can last for over 80 years". Whole lead is kept, and cracked lead is cut out and replaced with new.

Up top, the mortar collar round the pots is the flaunching, and pointing is the mortar face of the joints. Neither shows from the street, which is why the photographs sent with the report close in on each face and on the top of the stack.

Removing a breast is another matter. The Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." On a shared wall, party wall law adds a notice for the building owner to serve, and the neighbour is owed at least two months of warning ahead of any cutting into the breast. A neighbour can consent in writing, and one who says nothing for 14 days is treated as dissenting, which brings surveyors in to settle terms. For scaffold that stands on the footway: we arrange the licence with our scaffolder.

Rebuilds and repointing have their own page: chimney repairs.

The lead and masonry at a Whitecroft stack

Flashings
Lead let into the joints, dressed over the tiles
Soakers
Code 3 lead, one under each course
Back gutter
A lead tray turning run-off round the stack
Pointing
Raked out and refilled where joints have opened
Flaunching
The mortar collar holding the pots

Cracked lead is cut out and renewed; sealant is not a repair.

Fig. 2 Chimneys, drawn close

Callout 2 of 3

Eaves, underlay and a loft that stays dry

Eaves are where a slope ends over the wall, with the gutter fixed below. They matter for more than looks, because in some roofs they are where air gets into the loft. A cold roof has its insulation at ceiling level and a ventilated space above. Marley, the tile maker, sets out what that needs when the underlay is an HR type: a gap of "25mm along the length of the eaves for pitches of 15° or less" and "10mm along the length of the eaves for pitches of more than 15°".

High-resistance underlay, called HR, is not vapour-permeable, which is why the loft depends on that open gap to shed moisture. An air-permeable underlay behaves differently. Over a well-sealed ceiling, Marley's wording is that "fortuitous ventilation at the eaves via normal eaves construction (3mm) is all that is required", subject to conditions on third-party certification. Which underlay sits under your tiles therefore matters before anyone adds insulation or changes the eaves detail. Pitch decides which gap figure applies, so we measure the slope before quoting either.

The standard for condensation control in roofs is BS 5250, which BSI lists as current and under review. The first question we ask is whether the eaves gap is still open. Insulation pushed hard into the corner can close it, and so can a clogged soffit vent. From the loft hatch, a torch run along the membrane picks out staining, the rafter feet show dark marks where damp has sat, and a musty smell tells the same story. Outside, a screwdriver tip tells us whether the fascia and soffit boards are sound.

Estates laid out in stages can hold roofs of different dates, and their eaves details can differ from one house to the next, so each address is read on its own. Where perished underlay or rotted boards turn up, the work follows the eaves course by course, and the full slope stays on the roof. That is the sense in which a repair is matched to the house instead of being one standard fix.

The roof repairs page lists the smaller jobs along the eaves, from refixing a slipped course to replacing a length of board.

Read along a Whitecroft eaves line

  • Which underlay type lies under the tiles
  • The gap at the eaves, open or choked
  • Soffit vents, clear or painted over
  • Fascia and soffit boards, sound or soft
  • Rafter feet inside, for damp marks
Fig. 3 Eaves and gutters, drawn close

Callout 3 of 3

How much of a Whitecroft roof really needs replacing

Callout three takes in the open slope. A tired covering has three possible answers: patch the faults, re-cover part of the slope, or strip the lot. Patching suits isolated slipped or cracked pieces. A partial re-cover suits a slope whose battens are sound but whose covering is spent. A full strip is for a roof where repair would not hold, and the survey photographs show which of the three the roof supports.

Whitecroft is in England, so the Planning Portal's test applies to re-covering: approval is not normally needed where "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". Weight is a separate matter. AD A puts it this way: "A significant change in roof loading is when the loading upon the roof is increased by more than 15%." A heavier covering therefore means the rafters are assessed first. On 01594 812315, Forest of Dean District Council Building Control answers questions on all this, and a registered building control approver is the alternative.

Insulation is the other half of a re-roof. Where Table 4.3 of AD L 2021 applies to a retained roof, it sets a threshold of 0.35 and an improved figure of 0.16. Paragraph 4.13 covers the awkward case: aim for the lowest U-value that is feasible and has a simple payback of no more than 15 years, generally not worse than 0.7. The next edition, AD L 2026, takes effect from 24 March 2027.

Lifespans are ranges, never promises. Marley's figure for concrete tiles is around 60 years, and HomeBuilding's for plain concrete tiles is 40-50 years. We give both, because the two sources disagree.

Pillowell Conservation Area sits close to Whitecroft, so some addresses will fall inside a boundary and others will not. Forest of Dean District Council holds the boundary map; ask it whether an Article 4 direction applies to your street too. Pastor's Hill House, Grade II (list entry 1288814, first listed 24 September 1984), is the closest listed building on the register, and a listed house cannot be altered in ways that affect its character without consent under the Planning (Listed Buildings and Conservation Areas) Act 1990. For roof windows and dormers in any of these areas, the planning guide sets out the rules. Our roof replacement page covers a full strip.

What sets the price of a Whitecroft re-cover

Roof area
The size and pitch of the slopes to be covered
Covering chosen
Tile, slate or another material, and its weight
Battens and underlay
Whether the timber below can stay
Access
Scaffold and any highway licence
Extras found
Rot or damage seen once the covering is off

One written total price, never itemised.

Whitecroft roofs: lead, ventilation and the rules

Is the lead round a Whitecroft chimney worth keeping when the tiles are replaced?

If it is sound, it can stay. MyJobQuote's page says of correctly installed lead flashing that it "can last for over 80 years", so we judge each piece on its condition, not its age. Lead that is split or lifting is replaced, and the new tiles are laid to meet whatever lead remains. Photographs of each flashing go in the report, so you see the decision as well as reading it.

Does Pillowell Conservation Area affect a house in Whitecroft?

That depends on the street. The conservation area lies close to Whitecroft, and Forest of Dean District Council holds its boundary map, so start by asking the council if your house is within the line, and whether any restriction on what you can do without permission applies. Put the Article 4 question to it too. In England a conservation area weighs on a Whitecroft dormer, and the planning guide lists what a roof window must meet.

What happens if a neighbour objects to a chimney breast coming out in Whitecroft?

Written consent from the neighbours is the quickest route. If they object, or say nothing for 14 days, the Act counts that as dissent and the dispute goes to a surveyor: one agreed surveyor, or one appointed by each side. Building Regulations approval is needed too, and the council's building control team is the place to start. Raising the notice early keeps the job on its dates, since the waiting period runs before any cutting begins.

Why does a loft smell damp after new insulation has gone in?

One cause is a closed eaves gap. With an HR underlay, Marley sets out 25mm along the eaves for pitches of 15° or less, and 10mm above that. Insulation packed into the corner can block the gap. We identify the underlay type first, then look at the gap itself, before suggesting a thing, because air-permeable underlay is handled differently. If the gap is closed, clearing it is a small job compared with replacing damp rafters.

Does a new roof covering mean upgrading the insulation as well?

Scope drives the answer, and Forest of Dean District Council Building Control can confirm it for your job. Where AD L 2021 Table 4.3 applies, the threshold is 0.35 and the improved value is 0.16, with paragraph 4.13 allowing the lowest feasible figure if payback would run beyond 15 years. AD L 2026 replaces that table on 24 March 2027.

Can heavier tiles go onto a Whitecroft roof built for lighter ones?

Only after a structural check. The Planning Portal's trigger is the new covering's weight rising by 15 per cent or more, while AD A speaks of "the loading upon the roof is increased by more than 15%". The rafters, wall plates and any ageing timbers are assessed first. For the access, we arrange the licence with our scaffolder; Gloucestershire County Council lists £145 for a minimum of 28 days, then £36 per 7 days to extend.

Get the Whitecroft stacks and eaves looked at

Write a few words about the roof, add a picture if one is to hand, and the price follows the survey.

10-year workmanship guarantee, in writing