Verges on Mitcheldean's timber-framed rows
We begin at the verge, the stretch of covering that finishes along a gable end. The Victoria County History's 1996 account of the town says: "Among the few early buildings to escape later redevelopment is a row of three timber-framed houses", and it puts them in the 16th century on the south side of Millend Street. A row like that has end houses with an open gable verge and middle houses that share their side walls, so the repair depends on where a house stands in the line.
A traditional verge has tiles or slates that overhang the gable wall slightly, resting on a base course called the undercloak and bedded in mortar. Over time the mortar cracks and drops out, and the first sign is a gap you can see from the pavement. Dry-fix verge units are the newer answer, and BS 8612 covers them. Slating and tiling work is governed by BS 5534:2014+A2:2018, the standard currently in force. We pick the method by looking at the house, because a mortar verge can suit an old frame better than a plastic unit.
Beside a timber frame the verge has an extra job to do. The gable timbers move, and a verge fixed rigidly to them can split along the join. We test that join with a hand and a torch. Overhead, in the loft space, the torch is turned on the gable's underside as well, hunting for the staining that marks a leak, and on the battens nearest the verge for any that have darkened. A hairline gap is filled with mortar worked in properly, never smeared across the surface, because a smear can lift and leave the gap behind it.
Cracked verge tiles come off singly, and the course is checked back along the slope for others that have slipped, since a loose tile can have a neighbour in the same state. A whole verge is rebuilt when its bed has failed along the length of the gable. We photograph each stage, from the first gap to the finished line, and the pictures reach you with the written price. Slope work that starts at a verge and runs further is described on our pitched roofing page.
A gable verge, part by part
- Undercloak
- The base course the overhanging tiles rest on
- Verge bed
- Mortar under the tiles, raked out where it has cracked
- Dry-fix unit
- A clipped and screwed alternative, covered by BS 8612
- Gable timber
- The frame edge, checked from the loft for staining