Callout 1 of 3
Lead and tile valleys on Puddlebrook houses
Look at a Puddlebrook roof from the lane and the valleys are the inside corners where one slope runs into another, forming a trough. Rain from both slopes funnels along it, which is why we trace the water from here first. A valley may be lined with sheet lead or built from tiles cut to meet along the line. From the ladder we look along the trough for gaps, for debris sitting in it, and for lead that has lifted at the edges or cracked across a fold.
Lead in a valley gutter is graded by the Royston Lead table, where Codes 4, 5, 6, 7 and 8 appear against pitched valley gutters, and Code 3 is "Recommended for lead soakers only". A sheet too thin for the job can show the strain early, because thin lead wrinkles where the flow is heaviest. MyJobQuote says correctly fitted lead flashing "can last for over 80 years", and that hedge belongs to flashings, so the valley is judged on current condition rather than age.
Blockage can do as much harm as a split. Moss, seeds and grit from the tiles gather in the trough and build into a dam, and the water backs up beneath the tile edges on both sides. We clear what we find and photograph the lead beneath, so you can see its state before deciding anything, with a close-up of the worst fold because a photograph shows a hairline split better than a description does. Sound lead stays put and the tiles beside it are rebedded. Split lead is replaced by the length rather than patched, because a patch puts a joint in the one place the water runs hardest.
The loft shows what the trough has been doing. Staining on the rafters beside the line, or a damp patch on the boards, tells us water has been getting through even where the lead looks whole from outside. Some valleys sit mid-roof, out of reach from the eaves, so the ladders are moved and a roof ladder spreads our weight over the covering.
Where a valley ends against a chimney, a dormer or a roof window, that junction needs a flashing of its own, and the survey records it as a separate item with its own photograph. Our lead roofing page describes the lead work in more detail. When a valley has been relined, the old lead leaves with us and the tiles sit square along the new line.
A lead valley, as we find it















