Valleys, eaves and listed roofs in Lea

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Valleys between slopesA valley takes run-off from two slopes, so its lead or tiles need checking.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Gutters and eavesA sagging gutter run spills onto the wall and softens the fascia behind it.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Castle End and the Crown InnBoth are listed, so covering changes there start with a consent question.

Lea and the Wye country

Lea on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Lea, from the gutter up

Gutter, valley and stack: three checks on a Lea roof

We begin at the eaves where rain leaves the roof, follow the run-off into the valleys, and finish at the stacks and the listed buildings of the village.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Eaves line; 2 Valleys; 3 Stacks and listings.

Fig. 1 Lea's eaves, valley and stack numbered on one border house.

Callout 1 of 3

Eaves, gutters and the first course in Lea

Rain leaves a roof at the eaves, so that is where a Lea survey begins. The Royal Commission's 1932 inventory of Herefordshire says of The Crown Inn in this parish that "the roofs are covered with tiles and slates." That is one building on one day in the early 1930s, and it tells us only that more than one covering was in use. On a house today the first question is what is actually on the eaves, how the first course sits, and where the underlay, the membrane beneath the covering, meets the gutter.

The underlay should lap down into the gutter so that run-off lands inside it rather than behind it. When it stops short, water tracks along the fascia board and the rafter feet and shows up later as stained timber. We check the fascia and the soffit, the board beneath the overhang, for softness by pressing a blade into the grain, and we look at every bracket for movement.

A gutter needs a slight fall to carry water along it. Brett Martin, a gutter maker, gives it as 1mm for every 600mm. Between two brackets that have drooped, the run keeps a standing pool, and a pool freezes, overflows and stains the wall below. Re-hanging the run to a fall may be all that is needed, and if new lengths are the better answer, the report says that. uPVC roofline products are sold with a long life, but the 20 to 40 years quoted online comes from a retailer with something to sell, so we treat it as a loose guide.

Eaves also carry ventilation. For a cold roof Marley gives 25mm of opening across the eaves for pitches of 15 degrees or less, and 10mm for pitches of more than 15 degrees, with high-resistance underlay. That type is not vapour-permeable, so a blocked eaves gap matters. A low-resistance underlay over a well-sealed ceiling can depend on the ordinary eaves gap, provided its certification conditions are met. We find out which underlay is there before any insulation goes in.

Our guttering, soffits and fascias page covers renewal of the whole roofline. Lea is in England, so a re-cover is tested the Planning Portal's way: under 25 per cent of the building envelope and under 50 per cent of the roof, and the usual answer is that no application is needed.

Eaves checks on a Lea house

Underlay
Laps down into the gutter, not behind it
Fascia
Pressed for softness along its length
Brackets
Tested for movement and for a true fall
Soffit
Checked for staining and open joints
Vent gap
Clear along the eaves, not blocked by insulation
Fig. 2 Eaves and gutters, drawn close

Callout 2 of 3

Valleys where two Lea slopes meet

A valley is the sunken junction of two slopes, and it carries the run-off of both. Every drop that lands on either slope ends up in that one channel, which is why a small fault there does more harm than a bigger one on the open slope. Our second callout checks the valley from above and from the loft beneath it.

A valley may be lined with lead sheet, formed from tiles, or built up in another material when the roof was made. The lead kind lies as a trough between the slopes, the covering being cut to a clean edge along each side. We look for splits across the trough, edges that have lifted, and debris that has banked up and sent water over the side. Leaf litter and moss can block a channel, and clearing them is the cheaper repair when that is the whole story.

Lead is specified by code. In the Royston Lead table, Codes 4, 5 and 6 are listed for pitched valley gutters, while Code 3 is "Recommended for lead soakers only". We choose a thickness for each job and never cut a thin soaker sheet to do a valley's work. Lead roofs sit outside BS 6229, which covers flexible membranes on flat roofs, and AD C refers to BS 6915 for lead. For lead flashing, MyJobQuote's line is that correctly installed lead "can last for over 80 years", a hedge rather than a promise.

If a lead valley has failed along a short stretch, a repair patch is possible when the surrounding sheet is sound. If the sheet has cracked in several places, the honest answer is a new valley, and we photograph the cracks so you can see that for yourself. A new lead valley means lifting the covering along both edges, so that labour sits inside the one written total.

If a valley ends against a chimney or a wall, the flashing at the junction is checked in the same visit. A tile or slate cut to fit the valley edge can crack or slip, so we press those too, and we look from the loft for a damp patch on the timbers under the channel. Our lead roofing page explains the codes, the dressing and the detail at junctions, and what we look for before recommending any lead at all.

Looked at in a Lea valley

  • Splits or pin-holes across the lead trough
  • Edges that have lifted from the covering
  • Leaf litter and moss banking up in the channel
  • Cut tiles or slates along each side
  • The flashing where the valley meets a wall

The valley carries two slopes of rain, so a small crack there is not a small fault.

Fig. 3 The valley, drawn close

Callout 3 of 3

Chimney stacks, Castle End and the Crown Inn

Callout three is the chimney, a masonry column that takes weather on each of its faces. Our check covers the pointing, the pots, the flaunching (the mortar collar that slopes away round them) and the lead at the foot of the stack. If the stack and its breast are to come out, the Planning Portal says that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." A breast set in the wall you share with the neighbours also means a party wall notice, served by the owner of the work with at least two months' notice.

Lea has listed buildings of its own. Castle End is Grade II* (list entry 1348810, first listed 18 May 1953), and The Crown Inn is Grade II (list entry 1099653, first listed that same date). Brook House is Grade II too. Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, listed building consent is the gateway for any job that changes how such a house looks or is built, and a chimney stack is part of that. A listed house keeps its permitted development rights, and consent is needed as well.

St John the Baptist's church is Grade II* (list entry 1099652, first listed 17 March 1987). Its denomination is Church of England, which puts works to it, while it is in use, through the faculty system and outside listed building consent.

The nearest named conservation area is Longhope, over the county line, and it belongs to Forest of Dean District Council; Lea itself is in Herefordshire, which has 64 conservation areas in all. Check your own address against Herefordshire Council's list, and ask whether an Article 4 direction applies with Herefordshire Council. For building control, Herefordshire Council Building Control is on 01432 261938, and a registered building control approver can act instead.

Our chimney repairs page covers repointing, rebuilding and lead, and our planning guide for roof windows covers what changes on protected land.

Stack terms, in plain words

Flashing
Lead strip tucked into a joint and dressed over the covering
Soaker
A folded piece of lead slipped under each course
Back gutter
The lead tray behind a stack that turns run-off aside
Flaunching
The mortar collar that holds the pots in place
Pointing
The mortar face of the joints in the stack

Lea roofs: gutters, valleys, stacks and consents

Why does a Lea valley fail before the slopes either side of it?

Both slopes drain into the valley, so it takes twice the flow, and anything that blocks it sends water over the edge of the lead or into the joint beneath. A split in the sheet, a lifted edge or a bank of moss does the damage. We inspect it from above and from the loft, photograph the fault, and say whether a patch will hold or the valley needs relaying.

Do Castle End and The Crown Inn need consent for roof work?

Castle End is Grade II* (list entry 1348810) and The Crown Inn is Grade II (list entry 1099653), both first listed on 18 May 1953. Work that would affect a listed building's character needs consent under the 1990 Act, so Herefordshire Council is asked before the covering, ridge or stack is touched. Our photographs from the survey go with the request, which helps the council see the fault for itself.

Is a re-roof in Lea covered by Building Regulations?

Lea is in England, so the test is the Planning Portal's: under 25 per cent of the building envelope and under 50 per cent of the roof falls outside the application process in the ordinary way. A bigger job goes to building control. Adding insulation with the roof open brings in AD L 2021 Table 4.3, which sets 0.35 as a threshold and 0.16 as the improved figure. A heavier covering is checked separately, because the Portal flags a rise of 15 per cent or more in roof weight.

What happens to a chimney breast when a stack is taken down in Lea?

Taking out a breast is structural, so Building Regulations approval applies, and the owner serves a party wall notice if the breast projects from a wall the house shares, served with a margin of at least two months. The roof is made good where the stack stood, with new battens and covering matched to the slope. We photograph the loft and the wall faces first, so the plan for the opening is clear before anyone starts.

Who deals with scaffold on the road outside a Lea house?

Scaffold standing on the road or pavement requires a licence under section 169 of the Highways Act 1980. Herefordshire Council sets the fee at £167 for a maximum of one month, £123 per month to extend, and wants at least 10 days' notice before erection. We arrange the licence with our scaffolder. Where a Lea house fronts a fast road, the licence is sought early, so nothing is left late. Lea scaffolding is priced into the written figure you receive after the survey.

Can gutters be replaced without touching the fascia in Lea?

Sometimes. If the fascia board is sound and its fixings hold, new gutter lengths can be hung on fresh brackets set to a fall. If the board has gone soft, the rafter feet behind it are checked too, and the board is renewed with the gutter. We press the timber and photograph it, so you can see which job you are being asked to pay for.

Ask for a Lea survey, eaves to stack

Tell us about the leak or the worn gutter, add a photo if you can, and we will visit and write up one total.

10-year workmanship guarantee, in writing