01432 610152 Get a quote Call 01432 610152

Roofers in Highleadon

Roofing for Highleadon cottages and newer homes, about 41 minutes by road from Hereford.

Our survey opens at the gable ends and the chimney, every fault gets its own photograph, and the price arrives as one total.

Get a free quoteCall 01432 610152

Listed cottages set the pace here

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Listed cottage gablesCamp Cottage and Mill Cottage are Grade II, so verge repairs start with care.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Stacks and their leadAn older cottage stack needs its lead and its pointing read together.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Low eaves and guttersA blocked gutter spills over the wall head and soaks the eaves timbers below.

Highleadon on the map

Highleadon on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Highleadon roofs, verge to gutter

Reading a Highleadon cottage roof from the gable edge down to the gutter

The survey makes three stops: the verge at each gable, the chimney stack with its lead, and the eaves where the gutter hangs. The listed cottages in the parish shape how carefully each stop is handled.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Stack and lead; 3 Eaves line.

Fig. 1 A cottage roof in section, with the gable verge, the stack and the eaves numbered.

Callout 1 of 3

Verges on the Grade II cottages of Highleadon

We begin at the gable end of each pitch, where the slope stops short of the wall and the covering finishes in a tidy line called the verge. That line is bedded in mortar or pinned with dry-fix clips, and it takes wind from the side as well as from above. Highleadon shares a civil parish with Rudford, and the 2021 Census counted 274 usual residents in Rudford and Highleadon. The parish's Grade II entries in the National Heritage List include Camp Cottage (list entry 1341935, first listed 7 April 1981), Mill Cottage (list entry 1304676, first listed 18 October 1985) and Whitehouse (list entry 1078611).

If your cottage is one of those, or stands beside one, the order of work changes. Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, work that alters what makes a listed house special needs consent first. Permitted development rights stay in place for a listed house, but only alongside that consent. Forest of Dean District Council receives the application. Before any tile is touched we photograph the whole edge, course by course, and that set of pictures travels with the application.

With the tiles in view we look for four faults: an end tile that rocks, mortar that has slipped out from beneath it, a bargeboard (the painted plank nailed along a gable edge) with split or soft end grain, and underlay, the membrane below the tiles, that has curled out at the edge. Wherever the original covering proves sound, the repair is made in that covering and bedded as it was bedded. Marley, the tile maker, notes that since the 2015 amendments mortar "could no longer be relied upon as the only means of securing the roof covering", so each verge tile we relay gets a mechanical fixing as well as its bed.

A tired verge is a repair. A worn-out covering raises the re-roofing question, and because Highleadon is in England the Planning Portal's envelope-and-roof test is the one to use. It sets two limits together: "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof is affected". Inside both, an application is not normally required. BS 8612 is the specification we follow whenever a verge is relaid dry. Our listed and heritage roofing page goes further into protected houses.

Checked along a Highleadon verge

  • Mortar beneath the end tiles
  • Tiles that have crept towards the edge
  • Split or soft end grain on the bargeboard
  • A mechanical fixing on each verge tile
  • Photographs taken before any tile lifts

On a listed cottage the verge is photographed first and lifted second.

Fig. 2 The verge, drawn close

Callout 2 of 3

Cottage chimneys and the lead around them

The stack is the second stop. A chimney stands proud of the slope and is struck from all four sides, so the collar of lead around its foot has a lot to cope with. That lead comes in named pieces. The flashing is a strip pressed into a raked-out mortar joint, the free edge falling across the covering. Up each side, the soakers go in: small folded sheets interleaved with the tiles. Built in behind the stack, the back gutter works as a lead trough and carries the run-off from the slope around it. Thickness is specified by code, and Royston Lead's brochure lists Code 3 as "Recommended for lead soakers only", which is why we write a code against each position in the report instead of using one gauge throughout.

Above the lead, the masonry is read unit by unit. We check the pointing, meaning the mortar in the joints, and the flaunching, the mortar bed shaped around the pot bases, and we photograph every face, since nobody sees a stack top from the ground. Split lead is cut out and replaced, not smeared with sealant. MyJobQuote's page on chimney leadwork says correctly installed lead flashing "can last for over 80 years", so a sound section stays where it is.

Taking a chimney breast out indoors belongs to a different category of work, with rules of its own. The Planning Portal puts it plainly: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." Where the breast forms part of a wall you share, the Party Wall etc. Act 1996 makes you, as owner, serve the neighbour a notice, and section 3 of that Act has the notice reach them at least two months before cutting begins on the shared wall. Questions about that notice go to a party wall surveyor, not to building control.

Where lead and pointing both need attention, one scaffold covers both. Rebuilding and repointing are described on our chimney repairs page, for anyone who wants the longer account of that work.

Lead and masonry at a Highleadon stack

Flashing
Lead tucked into the joint and laid over the tiles
Soakers
Folded lead interleaved up each side of the stack
Back gutter
A lead trough steering run-off round the upslope side
Pointing
Joints raked out and refilled where they have opened
Flaunching
The sloping cap in which the pots sit
Fig. 3 Chimneys, drawn close

Callout 3 of 3

Eaves, gutters and the scaffold that reaches them

The third stop is the eaves, the line where the roof ends above the wall and the gutter is hung. Brett Martin, who makes gutters, puts the fall at "1mm for every 600mm" towards the outlet. A run that has sagged between two brackets keeps a pool in it, and the overflow goes down the face of the wall. So the survey reads the joints, the brackets, the fascia board behind them and the lowest courses of tiles, and each leaking joint is photographed where it sits.

Reaching that line can call for scaffold. Where the poles stand on the public highway, a licence is required under section 169 of the Highways Act 1980, and Gloucestershire County Council is the highway authority around Highleadon. We arrange the licence with our scaffolder. The council's lead time is twelve calendar days or more, so the booking is made the moment a start date is fixed. National Highways answers for trunk roads and motorways.

Re-covering a slope also brings the eaves into the question of how a loft breathes. Marley states that on a cold roof under HR underlay the gap is 25mm at the eaves for pitches of 15° or less, and 10mm where the pitch is more than 15°. HR stands for high resistance, and that underlay does not pass water vapour, which is why the gap must stay clear when the new courses go on. We check it with a torch from the loft side.

Approvals sit with Forest of Dean District Council. Its Building Control team takes calls on 01594 812315, and a registered building control approver can be used instead. Bigger re-roofs, heavier coverings and added insulation go to that team before work starts. Roof windows and dormers are a planning matter, and our planning guide for roof windows sets out the rules in full.

Two things are worth asking the council in writing ahead of altering the appearance of a roof: whether your street lies in a conservation area on the council's own list, and whether an Article 4 direction applies. Gutter work itself is described on our gutters, soffits and fascias page.

The gutter at a cottage eaves

SoundRun-off reaches the outlet and the fascia stays dry
Needs workStanding water, a weeping joint, a bracket pulled loose

Highleadon roofs: listed cottages, lead and licences

What gets checked first on a listed cottage roof in Highleadon?

The gable edges and the chimney, then the eaves. On a Grade II cottage such as Camp Cottage or Mill Cottage, changing the covering or its look can need consent as a listed building, which Forest of Dean District Council decides. For that reason the survey records exactly what is on the roof before a method is suggested. The photographs go to the council with the proposal, and the council can judge the proposal against every course, ridge and flashing before it replies.

Is my Highleadon house in a conservation area, and does an Article 4 direction apply?

Forest of Dean District Council holds both answers, so put the question to it before planning anything that changes what a roof looks like to passers-by. The council keeps its own conservation area list, with boundaries you can check street by street. GOV.UK describes an Article 4 direction as one that can withdraw specified permitted development rights across a defined area. Keep the council's written reply with the survey.

Does re-roofing a Highleadon house need Building Regulations approval?

Highleadon is in England, so the Planning Portal sets the test: two limits, under 25 per cent of the building envelope and under 50 per cent of the roof. Stay inside both and no application is normally required. Larger jobs, any heavier covering and any added insulation go to Forest of Dean District Council Building Control. Until 24 March 2027 the insulation figures come from AD L 2021, Table 4.2 for a new roof and Table 4.3 for renovation, and AD L 2026 replaces them after that date.

What would a scaffold licence add to a Highleadon roof job?

Gloucestershire County Council's table (prices from 1 April 2025) sets a 28-day minimum period for a scaffolding and hoarding licence and £36 per 7 days for each extension, and wants the application at least 12 calendar days before erection. We arrange the licence with our scaffolder, so you do not chase it. Whether your roof needs one at all depends on where the poles would stand, which the survey settles, and the scaffold cost is carried in the written total.

Can the lead round a Highleadon chimney be patched, or does it need replacing?

It depends on where the lead has failed. A split in one flashing can be patched, while a lifted back gutter or worn soakers point to a larger repair. MyJobQuote's guide to chimney leadwork gives around £200 for a patch repair to the flashing and an average of around £570 for full replacement. Treat both as national guide prices, not as ours. The survey photographs show which case you have, and what it takes to put it right, and whether the lead around the flaunching has also lifted.

Is gutter clearing part of a repair visit at Highleadon?

The gutters are read at every survey, since a full one spills onto the wall head, and clearing can be added to the visit. Which? reported from its November 2025 survey, before VAT, that clearing all of a house's gutters costs £75 to £350, a national range that is not our price. A sagging run needs its fall reset, and Brett Martin gives that fall as 1mm for every 600mm.

Book a verge-first survey in Highleadon

Describe the roof as you see it from the ground, attach a picture, and we will book a visit.

10-year workmanship guarantee, in writing