Tiled slopes over local rubble walls
On the 1932 Royal Commission inventory of Herefordshire, the monuments numbered 5 to 14 in Upton Bishop parish carry a single summary line: "the walls are of local rubble with ashlar dressings and the roofs are tiled." Ashlar is cut and squared stone, used at corners and openings, and rubble is the rougher walling between. That line says the roofs were tiled but not whether the tile was clay or concrete, or how it was fixed, so the first job of the survey is to find out. An edge is lifted, the underside and battens are photographed, and the report names what the slope is made of before any repair is chosen.
The answer decides the details. Marley's pitch table sets a minimum of 35 degrees for its plain concrete tile, 15 degrees for the smooth Mendip and 30 degrees for its clay Hawkins, and those labels name tile products rather than places, so the maker's sheet for your own tile is the document that counts. Lifespans are ranges, not promises. The BRE's 60-year minimum life expectancy, as Marley cites it, applies to clay tiles only, and HomeBuilding lists clay tiles at "60-80 years". Marley expects concrete tiles to last "around 60 years" and HomeBuilding gives plain concrete "40-50 years", so both sit side by side.
The ridge is the first place a tiled slope shows age. Capping tiles bedded on mortar can rock loose when the bed crumbles, and a joint that has opened lets rain reach the top course. Dry-fix ridges, which are clipped and screwed in place of bedded, are covered by BS 8612. Marley notes that mortar "could no longer be relied upon as the only means of securing the roof covering", so a ridge that is rebedded also receives a mechanical fixing. Our pitched roofing page sets out repairs and re-covering for tiled houses in more detail.
A repair to a few tiles is not a re-roof, and the survey says which one you have. Cracked tiles are replaced one at a time, slipped ones are re-hung on sound nails or clips, and a slope with failing battens is stripped and re-battened as a whole. Each stage is photographed so the finished roof can be compared with the survey. Re-covering a larger area leads to the Planning Portal's two limits for an English house: a job that touches less than 25 per cent of the building envelope and less than 50 per cent of the roof is outside the application requirement, as a rule. Anything larger goes to building control, and the survey says which side of the line your roof sits on.
Tile or slate?
Does the 1932 inventory tell us what tile is on my roof today?
No. It records that the roofs were tiled, nothing more, and ninety-odd years of repair have passed. We lift an edge at the survey, photograph the underside and name the covering that is there now.
A tiled roof on a rubble wall is identified first and priced afterwards.