01432 610152 Get a quote Call 01432 610152

Roofers in Hampton Bishop

Roofing for Hampton Bishop's timber-framed houses, farmhouses and the newer homes around the church.

Every survey starts at the ridge and ends with photographs of your own roof and a single written total price.

Get a free quoteCall 01432 610152

What ageing Hampton Bishop roofs ask for

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Tiles, slate or thatchThe 1932 inventory names all three, so the first job is identifying yours.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Farmhouse and barn listingsWhitehall Farmhouse and its barn are Grade II, so repairs follow consent rules.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A village conservation areaDesignated in 1987, it asks you to check before changing a roof's look.

Placing Hampton Bishop

Hampton Bishop on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Hampton Bishop's roofs, from ridge to church wall

Ridge, eaves and church wall: the Hampton Bishop survey in order

A survey here follows the weather down the roof: the ridge capping first, then the eaves and gutters that take the run-off, then the listed walls and the village conservation area that govern what may change.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge line; 2 Eaves and gutters; 3 Church and farm walls.

Fig. 1 The three Hampton Bishop callouts marked on one drawn border house.

Callout 1 of 3

Ridge capping on tile, slate and thatched houses

The ridge runs along the crown of the roof, where the two slopes come together, and the ladder check starts there. Capping tiles lie along it, bedded on mortar or else secured with clips and screws as a dry-fix arrangement, a method BS 8612 covers. In 1932 the Royal Commission on Historical Monuments went through the houses of Hampton Bishop parish (monuments 3 to 24) and wrote that their roofs were covered with "tiles, slate or thatch". That sentence is a good warning that neighbouring ridges cannot be assumed to match: a clay cap on one house, a concrete one on the next, and on a thatched roof a ridge that belongs to a specialist thatcher.

Tap a capping tile and feel for movement: one that shifts under a gloved hand has lost its bed. Cracked or crumbling mortar between the caps lets damp creep down to the top course and the battens below. We also check the end of each run, meaning the last cap at each gable and the junction with any hip. A hip is the angled edge that runs down from the ridge at an external corner, and its caps have to stay tight where the run turns. At the point where the ridge ends against a stack or a taller wall, the lead tucked in is checked as well. Marley's guidance is plain that "Installing to BS 5534 isn't required by law" and that "mortar could no longer be relied upon as the only means of securing the roof covering". Each cap we refix therefore gets a mechanical fixing, and the bedded appearance stays wherever the house was built that way.

Look along the ridge from the lane. A line that dips or waves may have nothing wrong with the caps at all; the cause can sit in the timbers underneath, and the loft inspection confirms that before a cap is touched. Should the loft show a covering past saving, a heavier replacement is a separate matter: according to the Planning Portal, approval and a structural check are needed once a new covering weighs 15 per cent or more over the old. Our pitched roofing page explains a complete re-covering, battens upward, with every stage photographed for you.

Ridge parts on a Hampton Bishop house

Capping tile
The cap that sits over the top joint
Bedding
Mortar under the cap, tapped for hollow patches
Dry-fix clip
Holds the cap without mortar, under BS 8612
Hip end
Where a ridge meets the sloping outside corner
Gable end
The last cap, checked for slip and open joints

On this ridge each cap is looked at singly, because neighbours differ.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Gutters, soffits and the first course of tiles

Where the slope finishes above the wall, run-off is handed over to the gutter. The first course is the lowest row of tiles or slates, and it is set so that it tips water into the gutter rather than behind it. Three jobs meet at this edge: the covering, the fascia board that the gutter hangs from, and the ventilation that keeps a cold loft dry. A leaking joint can be as small a fix as a new seal or a clip, and the survey says so when that is all it needs.

For the ventilation, Marley gives the gap for a cold roof beneath a high-resistance (HR) underlay, one that is not vapour-permeable: "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°." Insulation pushed hard into the eaves defeats that gap, so we look at it from inside the loft while the tiles are being checked from outside. The gutter maker Brett Martin gives the fall as "1mm for every 600mm". Where a run sags between its brackets, water lies there and slops over the lip onto the fascia and down the wall.

That spill matters on a timber-framed house. The atlas of Herefordshire building stone gives the sole-plate, which is the lowest timber of a framed wall, as normally resting on a base of sandstone or siltstone. A gutter that overflows puts damp where the frame meets that plinth, so a stained wall is traced back up to the dripping joint before any timber is blamed. Brackets are refixed or added, falls corrected and a failed joint replaced, and the downpipe is followed to its outlet so the water has somewhere to go.

White soffit boards under the eaves deserve a second look on an older building. HSE says "If the building was built or refurbished before 2000, assume that there is asbestos in it", and asbestos insulation board (AIB) is one of the materials to rule out in a white soffit. Lifting AIB is usually licensed work, so a licensed firm is brought in for it. Our guttering, soffits and fascias page sets out the roofline work in more depth.

Checked along a Hampton Bishop eaves line

  • Gutter fall and sagging brackets
  • Joints and unions that drip
  • Fascia boards for soft timber
  • The first course and the ventilation gap
  • Downpipes and the wall beneath them
Fig. 3 Eaves and gutters, drawn close

Callout 3 of 3

St Andrew's church, farm barns and the conservation area

The village centre has buildings on the national heritage list. Historic England lists St Andrew's church at Grade I (list entry 1301948, first listed 26 January 1967). While Anglican worship carries on there, its roof work goes through the faculty jurisdiction rather than listed building consent. United Reformed, Roman Catholic and Methodist buildings in use sit outside listed building control in the same way, as do Baptist Union buildings held by a Schedule 1 trust corporation. The meeting houses of the Unitarians and the Quakers get no exemption, and a closed church or chapel needs consent from the council. Our survey report lists the grade, the entry number and the consent route for each protected building, so the council sees the same facts we worked from, and the photographs in the report can go with any application.

Whitehall Farmhouse is Grade II (list entry 1099873, first listed 20 October 1952), the barn about 18 metres north-east of it is Grade II (list entry 1179491, first listed 26 January 1967), and The Old House is Grade II (list entry 1301937). For a listed house or barn, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 needs consent for any works touching its character. Its permitted development rights remain, and consent is required in addition, so every change of covering is agreed with Herefordshire Council before work starts. Farm buildings on a working holding are surveyed in the same order as a house: ridge, verge, valleys, eaves.

Herefordshire Council's list gives the Hampton Bishop conservation area as designated in 1987, and the council holds the boundary map for the 64 conservation areas across the county. Ask the council, too, if any Article 4 direction reaches your street. Planning for roof windows and dormers is a separate question, answered in the roof window planning guide. Herefordshire Council Building Control takes Building Regulations questions on 01432 261938 or bce@herefordshire.gov.uk, and a registered building control approver can act instead. Our listed and heritage roofing page follows a protected roof from survey through repair to the final record.

What moves the price on a protected roof

Height and access
How high the roof is and where scaffold can stand
The covering
Whether sound slates or tiles can be refixed
Leadwork
How many flashings, valleys and abutments there are
Timber
Rafter feet or wall plate that need repair

One written total price, never itemised.

Hampton Bishop roofs: coverings, church and conservation area

What did the 1932 inventory record on Hampton Bishop's old roofs?

The Royal Commission on Historical Monuments said of the monuments numbered 3 to 24 in Hampton Bishop parish that "the walls are timber-framed" and the roofs are covered with "tiles, slate or thatch". It names three coverings without saying which house has which, so we identify the covering on your own roof at the survey. Thatch goes to a specialist thatcher, while tile and slate work is ours.

Is my Hampton Bishop house inside the conservation area?

Herefordshire Council's list gives the Hampton Bishop conservation area as designated in 1987, and the council's map marks the boundary, so test your own address and your neighbours' against it ahead of any change. An Article 4 direction, which can take away permitted development rights, is another thing to ask Herefordshire Council about. A like-for-like repair raises fewer questions than a new roof window, which the planning guide covers in full.

Is listed building consent needed for roof repairs to Hampton Bishop's Grade I church?

The church is Grade I and Church of England; while worship continues there, roof repairs are a faculty matter and listed building consent does not apply. United Reformed, Roman Catholic and Methodist buildings in use are exempt in the same way, and Baptist Union ones are too if a trust corporation in Schedule 1 holds them. Unitarian and Quaker buildings are outside the exemption, and a closed church or chapel needs listed building consent from Herefordshire Council.

What fall should the gutters on a Hampton Bishop house have?

Brett Martin, a gutter maker, gives "1mm for every 600mm". A run that dips between its brackets keeps water standing and tips it down the wall, and on a timber-framed house that puts damp at the sole-plate. We check the fall with the gutters running, refix or add brackets, and replace a failed joint. Photographs show the sagging section before anything is replaced, so the price covers only what has failed, and the whole run is renewed only when the survey shows it must be.

Do I need Building Regulations approval to re-cover a Hampton Bishop roof?

Hampton Bishop falls under the English rules. Under the Planning Portal's test for England, work that affects less than 25 per cent of the building envelope and less than 50 per cent of the roof can normally go ahead without an application. A covering that adds 15 per cent or more to the weight needs approval and a structural check. Adding insulation brings in Part L, where AD L 2021 Table 4.3 gives a threshold of 0.35 and an improved figure of 0.16.

Which council licenses scaffold on a Hampton Bishop road, and with what notice?

A licence for scaffold on the public highway comes from the Highways Act 1980 s169. On Hampton Bishop roads Herefordshire Council's licence costs £167 and covers a maximum of one month, with £123 for every further month and a 10-day minimum notice period. The line that deals with scaffold licences is Herefordshire Council Highways Licensing, on 01432 261800. No separate scaffold bill arrives, because it is in your single written price. We arrange the licence with our scaffolder.

Arrange a ridge-first survey in Hampton Bishop

Say what you have noticed from below, and we will check the rest along the ridge, then price the work in writing.

10-year workmanship guarantee, in writing