01432 610152 Get a quote Call 01432 610152

Roofers in Eaton Bishop

Stone slate, flat roof and wall-junction work for Eaton Bishop, 5.5 road miles west of Hereford.

Every Eaton Bishop roof gets a photographed survey from the slope down, followed by one written total price.

Get a free quoteCall 01432 610152

What Eaton Bishop roofs ask of us

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Stone slates and thatchThe 1931 inventory records stone slate and thatch roofs in the parish.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Extension flat roofsFelt, EPDM or GRP: each needs a fall and a sound edge.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade I church nearbyListed buildings in the parish shape how roof work is agreed.

Our map around Eaton Bishop

Eaton Bishop on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Eaton Bishop roofs: stone, flat, wall

An Eaton Bishop roof read through its stone slopes, its flat extensions and its wall junctions

This survey starts on the stone slopes, moves to the flat roofs that were added later, and ends where roofs meet walls, among the listed houses and the Grade I church of the parish.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Stone and thatch; 2 Flat extension roofs; 3 Walls and listings.

Fig. 1 The border house in section, with Eaton Bishop's three callouts marked in survey order.

Callout 1 of 3

Stone slate roofs in an Eaton Bishop parish

The Royal Commission on Historical Monuments catalogued Eaton Bishop's older buildings in 1931. For the ones it numbered 2 to 12 it recorded stone slates or thatch as the coverings. Each stone slate is sandstone, split thin along its natural bedding and hung from a batten, the timber lath that carries each course. Thatch is another trade altogether, and a specialist thatcher is the person to ask about it.

The county's building stone atlas explains where stone roofing slate comes from. It credits the St Maughans Formation sandstones as the chief source of the county's stone roofing slate, still worked by a few quarries, with active permissions concentrated in the Golden Valley at the county's western edge. SPAB, the Society for the Protection of Ancient Buildings, observes that the bulk of the region's stone slates are mostly grey to brown, though Herefordshire has some purple ones, and that roofs of this kind are predominantly double-lapped. Double-lapped means every course covers the joints in the course below and overlaps the one beneath that.

SPAB also warns that, unfortunately, many such roofs have lost their stone to other stones, to slate or to imitation stone slates. That is the danger of a rushed repair. So on a stone roof we begin by sorting what is there, and we check the rafters and battens under the stone for sag, because stone is heavy and a bowed roof needs its timbers looked at before anything is refixed. Slates that are sound are set aside by size for refixing, broken ones are replaced, and the quarries are asked about matching pieces before anything of a different colour or thickness is considered.

Eaton Bishop is in England, so the Planning Portal test for a re-roof applies: a job normally needs no Building Regulations application if it affects less than 25 per cent of the building envelope and less than 50 per cent of the roof. The survey measures the area first, since that decides which side of the line a job falls. Our roof repairs page explains how we deal with a slipped or broken piece, and the report photographs each one in place so you can see the extent for yourself.

Words for a stone slate roof

Stone slate
A thin slab of split sandstone hung as roof covering.
Double-lapped
Each course covers the joints of the course below it.
Batten
The timber lath that each course of slates hangs from.
Refixing
Hanging a sound stone slate again after sorting it.

On stone, we sort what is there before we order anything new.

Fig. 2 The slopes, drawn close

Callout 2 of 3

Flat roofs on extensions and outbuildings

Some older houses have a flat-roofed extension added behind or beside the main roof, and these roofs fail differently from the pitched ones above them. Despite the name, a flat roof is laid to a slope. It needs a fall, a gentle slope that carries water to the edge. BS 6229:2025 sets "a minimum 1:80 finished fall", according to NFRC, the trade federation. IKO, a maker of membranes, recommends designing to a 1:40 fall. The standard covers flexible membrane coverings only, so lead is outside it. Where the roof drains into a gutter, Brett Martin gives the gutter's own fall as "1mm for every 600mm".

Three coverings are common. Torch-on felt, EPDM (a single rubber sheet) and GRP (a plastic skin reinforced with glass fibre) each carry lifespans that depend on who is asked. For felt, HomeBuilding gives 10-15 years and Less gives 10 to 20. For EPDM, HomeBuilding gives 25-30 years and Less gives 30 to 50. For GRP, HomeBuilding gives 25-30 years and Less gives 25 to 40. These are typical ranges, never promises, and the quality of the laying matters as much as the material.

On a survey we look for ponding, which is standing water that shows the fall has been lost. We look at the laps and seams, at the upstand, where the membrane climbs the wall, and at the edge trim. A blister or a split is photographed and measured. A small defect is patched and the patch is described. A roof that has failed across most of its area is better re-covered, and the report says so.

An outbuilding with a corrugated sheet roof is a different case. HSE advises treating any building built or refurbished before 2000 as one that contains asbestos, and describes an asbestos cement roof as always fragile, so no one should walk across it. We stop and talk to you before any such sheet is touched, because careful removal and broken-up material are handled differently.

Part L comes in when the membrane is replaced. AD L 2021 counts "Replacing the waterproof membrane on a flat roof" as renovation, which brings in Table 4.3 and its threshold of 0.35 with an improved figure of 0.16. AD L 2026 Table 3.3 takes over from 24 March 2027. Our flat roofing page sets out the three coverings side by side.

A flat extension roof near Eaton Bishop

SoundWater drains to the outlet, seams flat, edges tight
Needs workStanding water, lifted seams, splits at the upstand

Callout 3 of 3

Roof-to-wall junctions and the listed houses of the parish

The last stop is the line where a roof meets a wall: a chimney, a gable of a neighbour, an extension built against the old house. Lead flashing is tucked into raked-out mortar joints and bent down over the covering. At a chimney a stepped flashing follows the slope of the roof, a back gutter carries water round behind the stack, and soakers sit under the covering at its sides. Royston Lead's table lists Codes 4, 5 and 6 for flashings, and Code 3 only for soakers. Lead is a long-lived metal; MyJobQuote says correctly installed lead flashing "can last for over 80 years". A flashing that has lifted from its joint is renewed, and it is never smeared over with sealant.

Where a new wall is built against a neighbour's, the Party Wall etc. Act 1996 section 2(2)(j) gives the building owner a right to cut into the neighbour's wall to insert a flashing. Notice comes from the building owner, with at least two months' warning for work to a party wall. Surveyors are appointed if the neighbour dissents or leaves the notice alone for 14 days.

St Michael and All Angels, the parish church, gets a Grade I listing from the National Heritage List (list entry 1099705, first listed 26 January 1967). The Manor House and the Old Post Office are both Grade II (list entries 1167320 and 1348817, first listed 22 October 1986), and Martin's Croft is Grade II too (list entry 1167323). Listed building consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 applies to works touching the special character of a house. Whether a church still used for worship is exempt turns on its denomination.

Herefordshire Council's own list of conservation areas shows whether an Eaton Bishop address lies within one, and the council can say whether an Article 4 direction applies. Building control is Herefordshire Council Building Control, at bce@herefordshire.gov.uk. Where a scaffold is needed on the road, we arrange the licence with our scaffolder. Our listed and heritage roofing page covers protected houses.

A flashing against a neighbour's wall

Who serves the party wall notice when a flashing is cut into a neighbour's wall?

The building owner serves it, at least two months before work to a party wall begins. A neighbour can also give written consent, and no surveyor is needed unless the neighbour objects or says nothing across 14 days.

Eaton Bishop roofs: stone, flats and flashings

Which roof coverings were recorded in Eaton Bishop parish in 1931?

The Royal Commission on Historical Monuments wrote of the buildings it numbered 2 to 12 that their roofs were covered with stone slates or thatch. Those are the coverings of a particular list of buildings, not a count of every roof today. A survey tells you what your own roof carries now. Thatch questions go to a specialist thatcher, and stone slate repairs are what we take on.

What fall does an Eaton Bishop flat roof need?

According to NFRC, BS 6229:2025 sets a minimum 1:80 finished fall. IKO advises designing for a fall of 1:40. A roof that holds standing water has probably lost its fall. We measure the slope at survey, photograph any ponding, and say whether the fault lies in the covering or in the structure beneath it, because the two call for very different repairs and prices.

How long does a felt, EPDM or GRP flat roof last?

Sources differ on this, so both figures are given. Felt: HomeBuilding gives 10-15 years and Less gives 10 to 20. EPDM: HomeBuilding gives 25-30 and Less gives 30 to 50. GRP: HomeBuilding gives 25-30 and Less gives 25 to 40. These are typical ranges, not promises, and a seam badly laid can fail long before the material would, which is why the survey looks hard at every seam and edge.

Which consent route covers roof work at Eaton Bishop's Grade I church?

The church carries a Grade I listing. Whether roof works there need listed building consent depends on the denomination and on current use. A Church of England church in worship use goes through the faculty system, and Catholic, Methodist and URC churches in worship use operate schemes belonging to their denominations; Baptist Union ones need Schedule 1 trustees. Unitarian and Quaker buildings are outside that exemption, as are closed chapels, and they need consent from Herefordshire Council, so the first step is to establish which body owns the building.

Is my Eaton Bishop house inside a conservation area?

Herefordshire Council keeps the list of conservation areas, with maps, and the county has 64 in all. Check the list for your address, and ask the council whether an Article 4 direction applies to it. Do both before you commission drawings or order materials. Putting back the same slates is a different question from adding a roof window, which our planning guide covers.

What does Herefordshire Council charge for a scaffold on an Eaton Bishop lane?

Where scaffold stands on the public highway, section 169 of the Highways Act 1980 requires a licence. Herefordshire Council's fee is £167 for a maximum of one month, £123 per month for extensions, and its guidance asks for at least 10 days' notice. Our scaffolder obtains the licence, and the quote we write has the scaffold in it. For a trunk road or motorway near the parish, the authority is National Highways, not the council.

Describe your Eaton Bishop roof to us

Tell us about the stone slopes, the flat extension or the flashing you are worried about, and we will arrange the survey.

10-year workmanship guarantee, in writing