In brief
Royston Lead lists Code 3 and Code 4 for soakers. Code 3 is green, 1.32 mm thick and 14.97 kg/m2, and the brochure says it is "Recommended for lead soakers only". Code 4 is blue, 1.80 mm and 20.41 kg/m2, and it is listed for flashings and valleys as well. Which of the two goes under your slates or tiles is settled at the survey, and the code is named in the written quote.
The two codes the table puts against soakers
Picture a small piece of lead, bent to an L, that lies under one course of slates or tiles with its upturned leg against a wall or chimney. That is a soaker. In the Royston Lead brochure the letter A stands against it, and only the two thinnest codes have that letter. Everything heavier is listed for other work. The table below gives the colour, thickness and weight of the pair.
| Code | Colour | Thickness | Weight |
|---|---|---|---|
| 3 | Green | 1.32 mm | 14.97 kg/m2 |
| 4 | Blue | 1.80 mm | 20.41 kg/m2 |
From Code 5 upwards the brochure no longer lists soakers, so the heavier grades are left for other work. The brochure's wording for Code 3 is the unusual one, because it is the only code whose entry is narrowed to a single use. Code 4, by comparison, is also listed for flashings, pitched valleys and dormers, so it is the more flexible of the two where one roll has to serve several joints.
The page on what colour marks Code 4 lead shows the colour of every code side by side.
Why soakers use the thinner sheet
A soaker has to lie flat between one course and the next without lifting the covering above it. A sheet that is too thick can hold a slate or tile slightly proud of its neighbours, and a bend that is too stiff does not lie neatly. Thin sheet suits a piece that is hidden, small and repeated.
Repetition matters too. A run of soakers along a wall is one piece per course, so a long edge uses a lot of them. Weight per square metre therefore adds up across the run, and the thinner codes keep the load on the battens and rafters lower.
The other side of the arrangement is the flashing, which lies on top. The soaker keeps rain from running in under the last slates or tiles, and the flashing covers the wall joint. They are separate pieces with separate listings in the table, and the page about what lead code is used for flashings gives the other half. If you are not sure which of the two your wall has, soakers or step flashing explains how to tell them apart.
Choosing between Code 3 and Code 4 on your roof
The table lists both codes for soakers. It does not rank them for a particular house, so the choice comes from what we find. At a survey we look at:
- the covering: a thin slate and a plain tile lie differently over a fold of lead
- the lead already there, which we can measure at a split or a cut edge
- how the courses are laid at the wall, and how much of each is hidden
- whether the old soakers have worn through, been stolen or been replaced with something else
- whether the wall joint above will also be re-formed in lead
Code 3 is a narrower grade, listed for soakers alone. If a flashing or a valley is proposed in it, the brochure does not support that, and it is worth asking why. A Code 4 soaker brings the same grade as a Code 4 flashing, which is a tidy arrangement where both are renewed together.
We photograph the soakers we lift, so that you can see their condition and the code goes on the quote beside the job. The lead roofing page shows where else lead sits on the house.
Access, scaffold licences and the written price
Soakers sit at the edge of a roof, such as up a gable wall or beside a chimney, and renewing them means lifting the courses that cover them. That needs safe access. If the scaffold must stand on the road or footway, we arrange the licence with our scaffolder. Each council has its own scheme, and the figures below show how differently they are set out:
- In England, Gloucestershire County Council charges £145 for a minimum period of 28 days, with extensions at £36 per 7 days, and wants twelve calendar days' notice as a minimum.
- In Wales, the Monmouthshire licence carries an administration fee of £108 and £27 per week to extend, with notice of 5 working days at least.
Each is the council's own fee in its own unit, and the two cannot be set against each other. The council that applies depends on your address, and we check which before anything is booked.
You receive a single written total, and the scaffold and the waste taken away are counted in it. Ask any other firm whether VAT is in its price, and whether it names the lead code it intends for the soakers.