01432 610152 Get a quote Call 01432 610152

Soakers explained

Lead soakers under tiles and slates

Hidden beneath the courses of a roof, soakers are the folded lead pieces that carry water off the slope. This guide covers where they go, which code suits them and what a missing one allows.

Horizon Roofing Hereford 9 min read

If you have ever seen lead stepping up the side of a chimney or along a wall where a lower roof meets a house, you have seen the visible half of the job. The other half is hidden. Under every course of tiles or slates, a small piece of lead is folded to an L shape, with one arm lying flat beneath the covering and the other turned up against the wall or stack. That piece is a soaker.

Nobody sees it, which is exactly why it gets forgotten when a roof is patched. A cement fillet is run along the join instead, it looks tidy, and for a while it works. Then the mortar cracks, and rain runs in at the join with nothing behind it.

This guide covers what soakers do, how they work with the stepped flashing above them, the code that suits them, how the covering changes the detail, why they go wrong and what a replacement involves. It also sets out the approvals that arrive with a larger job, in England and in Wales. See our lead roofing page for the rest of the leadwork.

What a soaker is and where it sits

A soaker is a rectangle of lead folded along its length. One arm lies under the roof covering, held by the course above it. The other turns up the face of whatever the roof meets, so rain that runs down the wall is carried onto the slope instead of behind it. There is one soaker for each course of tiles or slates, so a run up the side of a stack may have a dozen or more small pieces stepping upwards.

Soakers are made where a sloping roof runs alongside something taller. Typical places:

  • up each side of a chimney stack
  • where a dormer cheek meets the main slope
  • along the wall of a house where a lean-to, porch or extension roof slopes up to it
  • where a pitched roof ends against a higher wall at a gable or a party wall

They go in while the roof is being covered. Each soaker is slid in as its course is laid, which is the reason they cannot be added later without lifting the covering.

Soakers do their work on the slope, under the covering. The visible lead, the stepped flashing, sits above them and does a different job. Understanding the split makes it easier to read a leak: a drip beside a stack can come from a soaker that has slipped or split, or from a flashing that has lifted, and the fix is different for each.

How soakers and the stepped flashing work as a pair

Soakers carry the water on the slope. The stepped flashing keeps it out of the join with the wall. The two pieces overlap, and the overlap is what makes the joint watertight.

The stepped flashing is a strip of lead cut into steps, so that each step follows one course of brickwork or stone. Its top edge is turned into the mortar joint at that course, wedged and pointed. Its lower part hangs down over the turned-up arm of the soakers beneath. Rain running down the wall meets the flashing, drops onto the soaker, and is carried out onto the slope.

That arrangement cuts out any reliance on a seal. Neither piece is stuck down: each is held by its lap, its wedges and the covering above it. Our guide to step, apron and cover flashings shows the flashing side in detail, and our short answer on soakers or step flashing explains when each is used on its own.

Walls differ, and the flashing follows the wall:

  • brick has regular joints, so the steps are even
  • stone laid in uneven courses needs steps cut one at a time to follow it
  • a timber frame has no mortar joint to chase, so the top edge is fixed another way

The black-and-white houses that the Herefordshire atlas places around Weobley and Pembridge are examples of the last kind, and each wall asks for its own detail.

The covering to the soakers also changes the cut. Slates and plain tiles are laid in overlapping courses, and soakers follow those courses closely.

The right code for a soaker

Soakers are cut from thin lead, because they are folded tightly and sit under a covering that presses down on them. Royston Lead's cast lead table sets out which codes suit which work.

Royston Lead codes that list soakers
CodeThicknessWeightRoyston's note
31.32 mm14.97 kg/m²"Recommended for lead soakers only"
41.80 mm20.41 kg/m²Soakers, flashings, valley gutters and dormers

Royston gives Code 3 a green colour mark and Code 4 a blue one, so offcuts can be told apart on site. Codes 5 and above are listed for flashings, valley gutters, parapet and box gutters and dormers, but not for soakers.

Code 3 is the thinnest sheet in the table, and Royston recommends it for soakers alone. It folds tightly under a covering and weighs the least. Code 4 is the other soaker code, and it is also listed for flashings. Which of the two a roof gets depends on the covering and the detail, and we say which we have chosen, and why, in the quote.

On a repair, the soakers already in place are read first. Where thin lead has torn at its folds, we use a code that suits the detail, not whatever sheet is to hand. The stepped flashing above is cut from a different code, since Royston lists Codes 4 to 6 for flashings. A single chimney can therefore carry Code 3 soakers under Code 5 or Code 6 flashings.

How the covering changes the soaker

A soaker follows its covering, so the same word means a slightly different piece on each roof.

  • On slate, the slates are thin and laid in overlapping courses, so a soaker is cut to suit the gauge, the distance each course is laid to the weather.
  • On plain clay or concrete tiles, small tiles are laid in courses, and each course takes its soaker.
  • On stone tilestones, which vary in size and thickness, soakers are shaped to the courses on that roof. Sandstone tilestones are the local stone covering.
  • On large interlocking tiles, one soaker for each course may not suit a big profiled tile, and the detail changes to fit it.

On stone and slate, SPAB: Welsh slate and stone roofs "are predominantly double-lapped". A double-lapped roof has two layers over the joints, so a soaker has more to pass beneath, and it is cut to match.

We also look at what is already on the roof. Old repairs may have used a different covering at the stack from the rest of the slope, and a soaker for one will not fit the other. The roof is read as it is.

The same goes for the way the covering is held down. Marley says "Installing to BS 5534 isn't required by law", and that the 2015 amendments made it clear that mortar "could no longer be relied upon as the only means of securing the roof covering". When we lift courses beside a stack, we look at how the covering is fixed as well as the lead beneath it, and we refix it with nails or clips where the old fixing has failed.

How soakers fail, and how a leak looks

A soaker that is missing, slipped or split lets water through at the side of a chimney or the edge of a wall, where it can run into the roof space unseen. The fault shows in the same way whichever it is.

What you see and what it can mean
What you seeWhat it can mean
Brown ring on a bedroom wall beside a chimneyA soaker missing or torn beside the stack
Dark tide marks on the roof timbers near the stackWater coming past the side of the stack
A bead of cement along the side of a stackA fillet standing in for soakers, and now cracking
Tiles lifting along a wallSoakers slipped, or fixings rusted

Four causes lie behind these signs. The first is a substitute: a cement fillet run where soakers should be, which relies on mortar and has nothing behind it once it cracks. The second is age and thin lead, folded tight and split at the bend. The third is movement, where a soaker has crept down the slope. The fourth is disturbance, when tiles were lifted for a repair elsewhere and the soakers beneath were bent or not replaced.

Sealant is sold as a quick answer, yet a bead of it leaves a split soaker split and a slipped one slipped, and it has to be cleaned off before any proper repair. Our short answer on the lead code for soakers covers the choice of code in brief.

We look from the loft first and then from the roof, and photograph the soakers so you can see which of the four causes it is.

Replacing soakers: what the job involves

Because soakers sit under the covering, replacing them means lifting it. The work runs in a fixed order.

  1. The tiles or slates beside the stack or wall are lifted course by course, and set aside in order.
  2. The old soakers and any cement fillet are removed, and the battens and boards beneath are checked.
  3. New soakers go in, one under each course, in the right code, with the turned-up arm against the wall or stack.
  4. The stepped flashing is renewed or refixed over them, wedged into the mortar joint and pointed.
  5. The covering is relaid, with any cracked tile or slate replaced from stock.

Reusing the covering matters on older roofs. Old slates and stone tiles are worth keeping, and SPAB says "Claims of unavailability or long delivery times should always be checked with the quarries", so we do not assume a stone tile must be replaced.

Some soaker jobs are small, and some sit within a larger re-roof. The rules follow the larger job. In England, the Planning Portal says no Building Regulations application is normally needed where "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof" is affected. In Wales, the Welsh Government says of re-roofing: "In most situations, this work will need Building Regulations approval." On a listed building, consent comes first: section 7 of the 1990 Act applies in England, and sections 88 and 89 of the Historic Environment (Wales) Act 2023 apply in Wales. The price is set by the length of run to be redone, the covering, the access and the state of the boards.

Soaker questions

Can soakers be fitted without lifting the tiles?

Not properly. Each soaker sits under one course and is held by the course above, so the covering has to be lifted course by course to put new ones in. Where the tiles can be reused they go back; where they crack, we replace them. We photograph the lifted section so you see the lead underneath.

Which lead code is used for soakers?

Royston Lead marks Code 3, at 1.32 mm, "Recommended for lead soakers only", and also lists Code 4, at 1.80 mm, for soakers. The stepped flashing above is a heavier code, since Royston lists Codes 4 to 6 for flashings. We choose between them from the covering and the detail.

Is a cement fillet the same as soakers?

No. A fillet is a bead of mortar along the join, and it keeps water out only while it stays bonded to the wall and the tiles. Soakers sit under the covering and carry water onto the slope whatever the wall does. A cracked fillet is cut out and replaced with proper soakers and flashing.

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing