01432 610152 Get a quote Call 01432 610152

Small lead roofs

Lead on bays and small flat roofs: codes, rolls and drips

A bay window top or porch canopy is a roof in miniature, and lead covers it in separate bays joined by rolls and drips. This guide explains the codes, the joints and what goes wrong.

Horizon Roofing Hereford 9 min read

Look above a bay window on an older house, or above a front door canopy, and you may see a small flat roof in dull grey metal with raised ribs running down it and low steps across it. That is lead, laid in the traditional way. The ribs are rolls. The steps are drips. Between them, the sheets are free to move.

A small lead roof looks simple, but it carries the same demands as a large one: it has to shed water, take the sun and the frost, and join up to a wall without a gap. Because it is small, a fault shows quickly. A brown mark on the ceiling below, or on the bay's own soffit, can point straight to it.

This guide covers where small lead roofs turn up, why the metal is laid in bays, how the code is chosen from the Royston Lead table, how long published sources say lead lasts, and which rules apply in England and which in Wales. The wider picture is on our lead roofing page.

Where small lead roofs turn up

Lead covers the small flat roofs that a tile or slate cannot. They sit above rooms and doorways,. Some are original to the house and some were added later.

  • the roof over a bay window, whether square, angled or rounded
  • a porch canopy or the roof over a front door
  • the flat top of a dormer, with its cheeks clad in lead beside it
  • a small balcony or the roof over a shop front
  • a short run of flat roof between two pitched roofs, or behind a parapet

All of these are small enough that a single skilled hand can lay them, and awkward enough in shape that a sheet metal that can be bossed into corners suits them. Bossing is beating the lead into a shape with soft tools so that it follows a corner without being cut.

The surrounding roof decides a lot. A bay under a slate roof needs lead that meets the slate neatly at its back edge. A bay under a stone-tiled roof, which in Herefordshire means a roof of local sandstone tilestones, needs the same abutment cut to follow thick, uneven courses. Stone tiles vary in size, so the lead is shaped to the roof and not to a pattern.

The room below counts too. A bay roof sits over a heated room, so its fall, its insulation and its ventilation all affect the ceiling beneath. We look at the ceiling and the roof together at the survey.

Why lead goes down in bays

Lead expands when it warms and shrinks when it cools. On a flat roof in sun, the surface can swing between hot and cold within a day, and a large sheet fixed tight along every edge would stretch and then crease. Year after year, the creases would turn into cracks.

The answer is to lay the roof in separate bays: sheets of limited size that each sit on the deck on their own and can slide a little against it. Where one bay meets the next, the joint takes one of two forms, set by which way the water runs.

  • A roll has a timber core, round on top, fixed down the deck in the line of the fall. The two sheets either side are dressed up and over it, so the joint stands proud of the water.
  • A drip is a step in the deck across the fall, where one sheet ends and the next begins lower down. The upper sheet laps over the step and the lower sheet sits beneath it.

The rolls run with the water and the drips run across it. Together they cut the roof into smaller panels, so each one moves on its own. That is why a bay roof that has lasted for generations looks as if it were ribbed.

Welding is the other tool. A gas flame and a strip of lead filler fuse two edges into a single continuous piece, with no solder. It is used at corners that cannot be bossed from one sheet, and the welded pieces are still kept to sizes that allow for movement.

Choosing the code for a small roof

Lead sheet is graded by code, and a higher code is a thicker, heavier sheet. We work from the Royston Lead table of cast lead, which marks each code with a colour and a set of uses.

Royston Lead codes: thickness and weight
CodeThicknessWeight
Code 31.32 mm14.97 kg/m²
Code 41.80 mm20.41 kg/m²
Code 52.24 mm25.40 kg/m²
Code 62.65 mm30.05 kg/m²
Code 73.15 mm35.72 kg/m²
Code 83.55 mm40.26 kg/m²

Royston marks Code 3 "Recommended for lead soakers only", so it is not used for the deck of a bay roof. Codes 7 and 8 are listed for valleys, parapet and box gutters and dormers, and Codes 5 and 6 add flashings to that list.

The table has no line for a bay roof as such. We start from the dormer line, Codes 4 to 8, because a dormer top is also a small lead-covered roof, and we use the flashing line for the piece against the house wall. The choice then follows the size of the bay and the number of corners. A bay with one straight run is a simpler job than one with angled returns, because every corner has to be shaped without splitting the metal, and the code has to be one that can be worked that way.

Weight matters on a bay. A bay's timber is lighter than a house wall, and the difference between Code 4 and Code 6 is a good deal of metal across a deck. We check what the boards below can take before we price.

Boards, falls and the standard that does not apply

The deck decides how well the lead lasts. A small lead roof sits on boards, and the boards have to be dry, free of hollows and laid to a fall. A hollow in the boards holds water against the joints and shows up any weak spot sooner.

The standards cover less than people expect. BS 6229:2025 is the standard for flat roofs in continuously supported flexible waterproof coverings, which means membranes. Lead roofs sit outside it, and Approved Document C cites BS 6915:2001 for lead. NFRC says BS 6229:2025 sets "a minimum 1:80 finished fall for general roof areas and internal gutters", and that is a figure for membranes. We use the fall as a guide to what a flat roof needs to drain, and we build a lead deck to drain freely.

The boards under the lead are checked as part of every bay roof job:

  • soft or darkened timber, which means rot, where the old lead has leaked
  • nail heads and screws that could mark the underside of the lead
  • the fall towards the gutter or outlet, and whether it is even
  • the rolls and drip steps, which are timber and rot like any other timber

Where an old bay roof has been covered in felt or a sealant coat over lead, we find out what lies underneath before we agree a repair. Our guide to repairing old leadwork sets out how we judge old lead.

New lead goes on only once the boards are sound, because a new sheet will not outlast a rotten deck under it.

How small lead roofs go wrong

The faults on a bay or porch roof fall into a short list, and the stain on the ceiling sits close to the cause.

Signs, causes and what we check
SignProbable causeOur check
Stain at the wall edge of the ceilingLead lifted or split where it meets the house wallThe cover flashing, its wedges and the pointing
Stain in the middle of the ceilingA crack in a sheet, sometimes along a foldSheet length, creases and the roll or drip
Water stands on the roofBoards sagging, or an outlet blockedThe deck, the fall and the gutter outlet
Rolls look flattened or splitTimber below has rotted or lead has wornThe batten under each roll

A crack along a fold can mean the sheet was laid too long, or fixed too tight, for the lead to move. A repair patch can hold if the sheet is otherwise sound, but a patch over a patch hides the real cause. When the lead has been creased in several places, a new sheet in a suitable code is the lasting answer.

Lead stolen from a bay is a separate case. The deck is exposed to the weather, so it needs a make-safe cover first and a closer look at the boards before new lead is laid.

Published lifespans give the owner a sense of scale. HomeBuilding puts a lead flat roof at 60 to 100 years, and Less at 50 to 100. The sources call these ranges, and a range is not a promise: a thin code or a sheet cut too long can fall short of it.

Approvals and listed roofs on each side of the border

Re-covering a bay or porch roof is work to a roof, and the rule that applies follows the house across the border.

  • England: the Planning Portal gives a two-part test, under 25 per cent of the whole building envelope and under 50 per cent of the roof.
  • Wales: the Welsh Government begins from approval being needed, and says of re-roofing: "In most situations, this work will need Building Regulations approval."

Under the Building Regulations 2010, a roof counts as a thermal element, as walls and floors do, but windows and rooflights do not. Where a bay roof over a heated room is replaced as a new roof, Approved Document L sets a U-value for it: 0.15 W/(m²·K) in England (AD L 2021, Table 4.2) and 0.13 in Wales (Table 4.1 of the Welsh document). Whether a given job counts as a new roof is a question for building control before the work starts, either the council's service or a registered building control approver.

Lead on a period house is part of the building's character. In England, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent for works that would "affect its character as a building of special architectural or historic interest". In Wales, sections 88 and 89 of the Historic Environment (Wales) Act 2023 do the same job. Our guide to lead on listed and period roofs covers consent and matching in full.

A bay can be reached by a scaffold tower. If the tower stands on the public highway, Highways Act 1980 section 169 requires a licence, which we arrange with our scaffolder, and the tower is part of the written quote.

Small lead roof questions

Can lead be used on a roof that is almost flat?

Yes, lead is laid on small roofs that are close to flat, but it needs a fall to drain freely and rolls and drips to let it move. BS 6229:2025 covers membranes, not lead, so we build the deck to drain on its own terms. We check the fall and the boards before we price.

How long will a lead bay roof last?

Published ranges for a lead flat roof start at 50 years (Less) and 60 years (HomeBuilding), and both run to 100. MyJobQuote says correctly installed lead flashing "can last for over 80 years". None of these is a promise, so we check the code, the sheet lengths and the boards on yours.

Does re-covering a bay roof need approval?

That turns on the work and on the border. England uses the Planning Portal's test of under 25 per cent of the building envelope and under 50 per cent of the roof, and Wales starts from approval being needed. A small repair patch is not re-covering. Building control confirms which case you have.