Soakers or flashing

Soakers or step flashing: which does my roof need?

Beside a wall that meets a sloping roof, soakers go under each course of the covering and a stepped flashing laps over the top of them.

In brief

On a slate or plain-tile roof the two work as a pair. Soakers are small folded pieces of lead tucked beneath each course along the wall, and a stepped flashing then sits over them and into the brickwork. Where the covering is a large profiled tile that cannot be lifted course by course, a flashing may have to do the work alone. We settle it at the survey, from the covering and the wall. Royston Lead lists Code 3 for soakers only.

What each piece of lead is there to do

Where a sloping roof runs up against a wall, rain runs down the slope and meets that wall at an angle. Two separate jobs follow. Rain must not be driven in beneath the last slates or tiles at the wall, and it must not reach the joint where roof and wall meet.

A soaker deals with the first. It is a small piece of lead, folded to an L, made for one course of slates or tiles. One leg lies flat beneath the course, and the other turns up the wall. Each course gets its own soaker, so a run along a wall is a stack of overlapping pieces, one tucked under the next.

A stepped flashing deals with the second. It is lead cut and folded to follow the slope as a series of steps. Its top edge is pushed into a slot cut in the brickwork, and its lower edge lies over the turned-up leg of the soakers. That cover is what keeps rain out of the wall joint, and the soakers keep it out of the roof. Neither piece does the work of the other.

The two side by side

The table sets out the difference. The lead codes come from the Royston Lead brochure, which names the uses for each code in letters: A for soakers and B for flashings.

Soaker and stepped flashing compared
PointSoakerStepped flashing
SitsUnder the coveringOver the covering
One piece perCourse of slates or tilesRun of wall
Held byThe courses above itThe cut joint in the wall
Royston codes3 or 44, 5 or 6
To renewCourses liftedLead cut out and re-laid

That last row matters when you compare quotes, because the two jobs are not the same size. A flashing that has lifted from the wall can be renewed without disturbing sound soakers beneath. Soakers that have split need the courses lifted, which is more work, and a quote for one should say which of the two it covers. The page on lead soakers under tiles and slates goes into that, and what lead code is used for soakers gives the code detail.

Working out which one your roof needs

The answer comes from the covering and from how the roof was built, not from a rule of thumb. At a survey we photograph the wall joint and check each of these:

  • whether the covering is a small slate or plain tile that was laid in courses, which takes soakers
  • whether it is a larger profiled or interlocking tile, where the shape may stop it being lifted course by course
  • whether soakers are already there, shown by lead turned up the wall under the old flashing
  • whether the flashing is lifting, split or loosely pointed in
  • whether a mortar bead or a line of sealant has been run along the wall in place of lead

A bead or a line of sealant tells us the lead may have gone missing or failed at some point. A cement fillet seals only while the cement stays whole, and sealant never reaches the lead behind it.

A slate roof gets soakers and a flashing built as the original was, since the repair has to suit the roof you already have. We tell you when a repair to the flashing alone is enough, and when the soakers need renewing too. The step, apron and cover flashings guide covers the cover side in more depth.

When courses have to be lifted: the rules each side

Renewing soakers means lifting a strip of slates or tiles along the wall and laying them back. That is a repair to part of a roof, not a new roof, and the two sides of the border word their rules differently:

  • In England, the Planning Portal's test for no application, which it frames with the word normally, is less than 25 per cent of the total building envelope together with less than 50 per cent of the roof.
  • In Wales, the Welsh Government's re-roofing guidance starts from the opposite end, saying this kind of work will need Building Regulations approval in most situations.

Because of that difference, we check with the council's building control service or a registered building control approver before we start, and a new covering or a structural change is a separate matter. If a whole slope comes off, ask building control first on either side.

A wall abutment above a single storey needs safe access, and if the scaffold needs the footway or the road, we arrange the licence with our scaffolder. The wider lead roofing page covers the rest of the leadwork on a house. You receive one written total, with the scaffold in it, and photographs of the lead before and after.

Related questions

Is a line of mastic along the wall a substitute for either?

No. Mastic only coats the outside of the joint. It may seem to close the gap, while the soakers and the flashing behind it stay missing or split. If the lead has gone, the joint needs lead again, formed to suit the covering and secured at the masonry.

If my flashing is lifting, must the soakers go as well?

Not necessarily, because the flashing and the soakers fail separately. We look under the lifted lead, photograph the soakers on your roof and show you what condition they are in, so you can see whether they are sound before you agree to lifting any courses.