In brief
It depends on the code. Royston Lead lists Code 3 at 14.97 kg per square metre, Code 4 at 20.41, Code 5 at 25.40, Code 6 at 30.05, Code 7 at 35.72 and Code 8 at 40.26. Code 5, one of the codes listed for flashings, therefore weighs 25.40 kg for every square metre of roof it covers, which matters when it replaces a lighter covering.
Weight per square metre, code by code
Each lead code is a thickness, and each thickness has a matching weight per square metre. Roofers order and describe the metal by code, because a code names both at once. The figures below are from the Royston Lead cast-lead sheet brochure, which also gives each code a colour band.
| Code | Thickness (mm) | Weight (kg per m²) | Colour |
|---|---|---|---|
| 3 | 1.32 | 14.97 | Green |
| 4 | 1.80 | 20.41 | Blue |
| 5 | 2.24 | 25.40 | Red |
| 6 | 2.65 | 30.05 | Black |
| 7 | 3.15 | 35.72 | White |
| 8 | 3.55 | 40.26 | Orange |
The weight rises as the sheet thickens, from just under 15 kg for Code 3 to just over 40 kg for Code 8. That is the gap between a light soaker and the lining of a large gutter, and it is why the code is settled before any lead is ordered. Lead is a dense metal, and even the lightest code is no featherweight once there are a few square metres of it. Because the code fixes the weight, a quote that names the code also tells you roughly how much the metal will add to the roof, and a quote that names no code leaves you guessing.
Reading the table for a real roof
The table gives a weight for one square metre, so a roof detail has to be measured before the number means anything. As an example of the arithmetic only, a small bay roof of 4 square metres laid in Code 5 carries 4 times 25.40, which is 101.6 kg of lead. The same bay in Code 6 carries 4 times 30.05, or 120.2 kg. Each step up the table adds roughly 5 kg to every square metre, so the gap between codes grows as the area grows.
The weight is also why lead is handled in rolls, carried up in stages and fixed with care. A narrow flashing weighs little. A wide sheet over a flat roof, a parapet gutter or a long valley weighs a good deal, and it is laid on boarding that must be sound enough to carry it without sagging.
We measure the area of each lead detail on the survey and photograph it. We then work from the code the detail calls for, so the weight on your roof is known before the order goes in. The thickness side of the same table is covered on the page about Code 5 lead.
When extra weight brings in Building Regulations
Replacing a roof covering with something heavier changes the load on the roof structure, and each country sets a test for it. It is a matter for the Building Regulations and not for planning permission.
- England: the Planning Portal sets the trigger at a new covering material that "increases the weight of the roof covering by 15 per cent or more".
- Wales: Welsh Approved Document A, paragraph 4.4, says "A significant change in roof loading is when the loading upon the roof is increased by more than 15%".
A flashing in Code 4 or 5 adds very little to a house, and a like-for-like change leaves the load where it was. The test matters when lead replaces another covering over a wide area, such as a flat roof or a bay. The structure is then checked first, and building control, or a registered building control approver, is asked before the work starts.
The lead pieces that sit beside slates and tiles are described under lead roofing, and the sheet used for gutters is described on parapet and box gutters in lead.
Choosing a code for the detail, not by weight alone
Heavier is not always better. The code is chosen from what the detail does, and Royston's table gives each code a set of uses, lettered A to E. The letters stand for soakers, flashings, pitched valley gutters, larger gutters behind parapets and between roofs, and dormers.
- Code 3: soakers only, marked "Recommended for lead soakers only"
- Code 4: soakers, flashings, pitched valleys and dormers
- Codes 5 and 6: flashings, pitched valley gutters, the larger gutters and dormers
- Codes 7 and 8: pitched valley gutters, the larger gutters and dormers
A soaker is lead folded to run under each tile or slate where the roof meets a wall or chimney, so it is light by design. A parapet gutter, a lined channel behind a low wall, takes heavier sheet. Our pages on the lead code for soakers and the lead code for flashings go through the choices.
The pairing of code and detail is also why a single thickness never suits every job. A flashing in Code 4 and a box gutter in Code 6 are listed for their places, but Royston gives Code 4 no box-gutter use, so that swap would be a fault. We write the code against each detail in the quote, and photograph the finished lead so that you can check it matches.