In brief
At least 2 months. Section 3(2)(a) of the Party Wall etc. Act 1996 sets that minimum for a party structure notice, and section 2(2)(g) is the provision that lets an owner cut a projecting breast back. The Act reaches both England and Wales. The owner of the house is the one who serves the notice, and a neighbour can accept it by letter.
The period and who serves it
The Party Wall etc. Act 1996 runs across England and Wales, so one timetable applies in either country. Section 2(2)(g) gives the right "to cut away from a party wall, party fence wall, external wall or boundary wall any footing or any projecting chimney breast, jamb or flue". Section 3(2)(a) then says the notice must "be served at least two months before the date on which the proposed work will begin".
Serving it is the building owner's task, meaning whoever owns the house where the breast is coming out. The notice is the owner's document and goes to each adjoining owner. As the roofers, we can describe what is planned for the stack above the roof, so the notice reflects the real work, but we do not serve it for you.
That minimum is a floor, not a target. Work inside the period waits for the neighbour's written agreement. Count from the day the notice is served, then plan the scaffold, the stack work and the roof around that date. Fixing a builder's start day first and the notice second is the wrong way round, and it is a slip worth avoiding.
What the neighbour can do with the notice
When the notice lands, the neighbour has a choice to make. Section 3(3)(a) allows work to go ahead sooner with "the consent in writing of the adjoining owners and of the adjoining occupiers". A tenant next door is an occupier, so their agreement is wanted as well as the landlord's.
| Reply | Result |
|---|---|
| Consent in writing | Work can go ahead on the agreed terms |
| Dissent | A disagreement exists and surveyors are appointed |
| No reply in 14 days | Silence counts as dissent |
Section 5 treats an owner who does not consent within "the period of fourteen days" as having dissented. According to GOV.UK, a neighbour's silence is never consent. A surveyor comes in only where there is dissent or silence, and under section 10 the owners appoint one agreed surveyor, or each appoints their own with a third chosen by the two. The owner who wants the breast out keeps matters moving, so a short, polite letter beforehand helps, and a neighbour who has heard the plan in person is less likely to be surprised by the formal notice when it arrives.
How the notice sits beside building control
A party wall notice and Building Regulations are separate controls, and neither replaces the other. In England, the Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure". In Wales, ask the council's building control service or a registered building control approver whether your plans need approval.
Party wall questions go to a party wall surveyor, not building control. Building control looks at whether the structure left behind is sound, such as the support for a stack that remains above the roof. The notice deals with your neighbour's rights, which is why a breast removal can need both routes.
For the roof, our part of the job is the zone above the ceiling. The stack either stays, supported, or comes down to below the roof line, as described in what happens to the roof when a stack comes down. Either way, the breast and the masonry over it form one structure, and the order of the work needs agreeing in a single plan before anyone picks up a tool.
Cost, timing and what to settle first
MyJobQuote (updated 03/11/26) lists chimney breast removal at around £2,500, within a range of £1,200 to £3,500, and £3,000 to £3,500 for taking out the entire stack together with its breast. A party wall surveyor's fees come on top when the neighbour dissents. The roof side of the work sits inside a single written figure, given after the survey.
Settle these items before a date is fixed:
- whether the breast projects from a party wall or an external wall
- who the adjoining owners and occupiers are
- the day the notice was served, so you can count at least 2 months from it
- whether the masonry above the roof is being taken down as well
If the stack stands on a wall you share, read chimneys on a party wall first. The cost side is covered in chimney breast removal cost, and the wider picture sits in chimney repairs. Keep a copy of every notice and every reply together in one folder, so the dates are never in doubt. Our survey of the stack sits alongside them, with photographs of the chimney from roof level, so anyone reading the file can see the breast, the stack and the roof it passes through.
