Chimneys on a party wall: notices, consent and timing

A stack that stands on the line between two houses belongs to both roofs. This guide explains who serves the notice, how long it takes and what your neighbour can do once it lands.

Horizon Roofing Hereford 9 min read

Walk along a terrace or a row of semis and you will see stacks that straddle the boundary, one flue serving each side. From the street they look like a single chimney. In law and in brickwork they are shared, and that changes how repairs are planned. A rebuild, a new flashing or the cutting away of a breast inside the house can touch a wall that your neighbour owns in part, or can affect their rooms and roof.

The Party Wall etc. Act 1996 applies in both England and Wales, and the duty to give notice falls on the building owner. The roofer does not serve it, and neither does the neighbour. The notice has a minimum lead time, which is the part people overlook: two months is long when a stack is shedding bricks.

The sections below cover what makes a stack a shared one, the notice periods, your neighbour's options, what changes for roof-side work, the Building Regulations that sit alongside the Act, and how to fit the timing around a survey. Everything else we do on stacks is described on our chimney repairs page.

What makes a stack a shared one

On a detached house the stack stands on your own walls and nobody else has a say in the work. On a semi-detached or terraced house the stack can sit on the wall between two homes, and each house uses its own flues inside it. The brickwork above the roof is then a single mass of masonry resting on a wall that both owners rely on.

Three things tell us it is shared when we look from the roof:

  • the stack sits centrally on the ridge line, over the wall between two houses
  • there are pots in more than one set, with flues running to either side
  • the flashings, soakers and flaunching at the base are continuous across the boundary, so the lead on your side joins the lead on theirs

Inside, the same breast can continue through the party wall into the neighbouring bedroom or living room, with their fireplace on the far side. Whether a given stack counts as part of a party wall in the sense of the Act depends on how the houses were built, and a party wall surveyor can say. What we can say from the roof is whether the stack straddles the line and whether the work we propose reaches the neighbour's side.

Older stone houses around Hereford make this less obvious. In Herefordshire's timber-framed houses the building stone atlas calls the big outside stacks "commonly of local sandstone", and a stone stack on a gable may serve a single house or two cottages that were once one farmhouse. If you are not sure whose stack it is, check the deeds or ask a surveyor before any scaffold goes up.

Who serves the notice, and how far ahead

The building owner serves the notice. That is the person who wants the work done, which in a repair is the owner of the house that needs it. We can describe the work on a written survey so that the notice says what is planned, but the notice itself comes from you. In England and Wales alike, the periods in the Act are minimums, counted from the day the work will start.

Notice periods under the Party Wall etc. Act 1996
WorkNoticeSection
Cutting away a projecting chimney breast or flueAt least two months2(2)(g), 3(2)(a)
Cutting into the neighbour's wall for a flashingAt least two months2(2)(j), 3(2)(a)
A new wall built on the line of junctionAt least one month1(2)
Excavating near a neighbouring buildingAt least one month6(5)

The first two rows are the ones a stack brings into play. Section 2(2)(g) lets the owner cut away from a party wall any "projecting chimney breast, jamb or flue", and section 3(2)(a) says a party structure notice must "be served at least two months before the date on which the proposed work will begin". Section 2(2)(j) is the flashing right: cutting into the neighbour's building "in order to insert a flashing or other weather-proofing of a wall erected against that wall".

A short written notice that sets out the address, the work and the start date is the usual form. Keep a copy, and note the day it was handed over or posted.

What your neighbour can do with the notice

The notice is the start of a conversation, and there are three outcomes.

  1. Consent. Section 3(3)(a) lets you proceed once the adjoining owners and the adjoining occupiers have agreed in writing, so a tenant next door is asked as well as the landlord.
  2. Dissent. A neighbour who disagrees can say so, and a dispute is then in being.
  3. Silence. Under section 5, an owner who "does not serve a notice indicating his consent to it within the period of fourteen days" is "deemed to have dissented", and the Act treats a dispute as having started.

GOV.UK puts the same point in plain words: "You cannot assume that no response means they agree to the works." The 14 days count from the day the notice was served.

Once a dispute exists, section 10 provides for a surveyor to be appointed, either one surveyor agreed by both sides or one for each owner, with the two choosing a third. GOV.UK adds: "You must appoint a surveyor if you and your neighbour cannot agree." The surveyor, not the roofer, settles how and when the work on the shared structure goes ahead.

A friendly word before the letter arrives, with a photograph of the cracked flaunching or the lifted lead, gives your neighbour the reason as well as the request. Our notice to cut away a shared chimney breast answer walks through the notice step by step.

Roof-side work on a shared stack

Most of what we do on a stack happens above the roof: repointing the shaft, renewing the flaunching, replacing a pot, dressing new lead. Whether each of those jobs engages the Act depends on whether it cuts into or alters the shared wall, and that is a point to put to a party wall surveyor. The one roof-side right we can point to is section 2(2)(j), the cutting into a neighbouring wall to fit a flashing, which is the point where lead work can meet the Act.

What we do on our side of the survey is to keep the neighbour's roof in the picture:

  • we photograph the whole stack from your roof, and from theirs if they agree to us stepping onto it
  • we check where the lead from the two houses meets and whether one side has been patched against the other
  • we note which pots serve which house, so the notice names the right fireplaces
  • we say plainly if the proposed repair stays on your side of the line

A stack that is dropping bricks or pots is a different case. Keep people away from the ground below, say so to your insurer before any lasting repair, and ring us so we can see how to make the area safe. Whether any part of that work can begin before the notice period has run is a question to put to a party wall surveyor, because we would not want to give an answer that your neighbour's surveyor later disputes.

When the neighbour's flue is the one that has failed, the position is reversed: they serve the notice on you.

Building Regulations as well as the Act

The Party Wall etc. Act and the Building Regulations are separate laws. The Act deals with your relationship with your neighbour; the Regulations deal with whether the work is safe and sound. A job can need both, one, or neither.

If a chimney breast is to come out, England and Wales are not worded alike:

  • In England, the Planning Portal says: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure."
  • In Wales, ask the council's building control service or a registered building control approver before any breast is cut away.
  • In both countries, questions about the party wall notice go to a party wall surveyor, not to building control.

That last line trips people up. Building control will want to see how the stack above is supported if the breast below goes. It will not decide whether your neighbour has been properly notified, and it will not accept a party wall dispute as a reason to delay inspection.

Repointing, reflaunching or a new pot do not involve the structure in that way, and a roof repair of that size can be settled between you, your neighbour and the roofer. If the stack is to be taken down or rebuilt, planning and listed building rules may apply too. Our guide to removing a chimney breast sets out the approval route for the breast itself.

Fitting the notice around the survey

The easiest way to lose a month is to survey first, quote second and think about the neighbour third. Reversing that order costs nothing and can save the delay.

  1. We survey the stack from the roof and the loft and photograph what we find.
  2. After the survey you receive one written total price covering the whole job.
  3. If the work reaches the shared wall, you serve the notice on the adjoining owner and occupier, with a start date at least two months before any cutting away of a breast, jamb or flue.
  4. You wait for the neighbour's reply. Written consent lets you go ahead on that consent; no reply after 14 days is treated as dissent.
  5. If a dispute arises, the surveyors settle the terms of the work.
  6. We confirm the start date with you once the position is clear, and arrange the scaffold and its licence with our scaffolder.

Where the shared stack is in a street with limited access, the scaffold could need to stand out on the public highway, in which case our scaffolder takes out the licence under section 169 of the Highways Act 1980 and we handle the arrangements.

If the notice period is the sticking point, do not let it push you into a rushed deal. A stack that cannot wait is made safe first: the pots and loose courses come off, the area below is cleared, and the larger job is planned properly once the position next door is clear. A written total price for each stage keeps both owners clear on what is being agreed. If the notice period is the problem, the answer is to make the stack safe first and plan the larger job properly. Rebuilding above the roof line is covered in our guide to rebuilding a chimney above the roof line.

Shared stacks: your questions

Does the notice come from the roofer or from the homeowner?

From the homeowner. Under the Party Wall etc. Act 1996 the building owner carries the duty, serving it on the adjoining owner and occupier. We describe the work in writing after the survey so the notice is accurate, but the notice is yours to serve and sign.

What if my neighbour never replies to the notice?

Under section 5 of the Act, no consent within 14 days from the day the notice was served counts as dissent, and the Act treats a dispute as having started. GOV.UK says you cannot assume that no response means they agree. A surveyor is then appointed under section 10.

Should a party wall question go to building control?

No. Questions about the notice and the neighbour go to a party wall surveyor. Building control looks at structure and safety, for example how a stack is supported after a breast is cut away. In England and in Wales the council or a registered building control approver deals with that part.

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing