Breast removal cost

What does removing a chimney breast cost?

MyJobQuote gives around £2,500 as the average for taking out a chimney breast, and where yours lands depends on what happens to the stack above.

In brief

MyJobQuote (page dated 03/11/26) gives £2,500 or so as the average for taking out a chimney breast, within a range of £1,200 to £3,500. Taking the whole stack out together with the breast is around £3,000 to £3,500 on the same page. Those are third-party UK figures, not our prices. Ours is a whole-job total in writing, worked out after someone has been into your loft and looked at the stack.

What the published figures cover and what they leave out

A chimney breast is the part of the chimney that projects into a room, with the fireplace, where there is one, at the bottom. The stack is the part that rises above the roof. Removing the breast inside and dealing with the stack outside are linked, because once the breast beneath it goes, the stack above has to be held up on something new or taken down.

These are the figures from MyJobQuote's page on removing a chimney breast:

  • the average for removing a chimney breast: around £2,500
  • the range given for the job: £1,200 to £3,500
  • the whole stack taken out with the breast: around £3,000 to £3,500

MyJobQuote is a price-comparison site, and these are typical ranges across the UK, not Hereford prices. A range this wide covers houses of every size and condition, on either side of the border, so it tells you the job varies, not what yours will cost.

The page on what removing a whole chimney stack costs deals with the outside half of the job, and the hub page for chimney repairs sets the whole subject out.

What pushes a job towards either end of the range

The gap between £1,200 and £3,500 comes from the house, not from the method. These are the things a survey looks at:

  • how many storeys the breast rises through, since each floor means another room to open up and make good
  • whether the stack above the roof stays, and if so what will carry its weight once the breast below has gone
  • the state of the brickwork, because crumbling brick or stone has to be dealt with before it can be built on
  • whether the chimney is shared with next door, which changes the paperwork and the timing
  • how easy it is to get rubble out of the room and the house
  • whether scaffold is needed outside, and whether the roof around the stack needs making good

None of that shows in a photograph of the fireplace. A breast on a ground floor with no stack above is a different job from a breast through two floors with a tall stack that has to be supported or lowered.

We photograph what we find in the loft and at the top of the stack, then give you a total for the whole job in writing.

Approval and neighbour notice come before a price is fixed

In England, the Planning Portal says: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." So approval is dealt with before the work begins, through the council's building control service or a registered building control approver.

In Wales, Building Regulations are devolved, and the Welsh Government publishes its own approved documents. A breast alters the structure of a Welsh house as much as an English one, so we check with the council's building control service or a registered building control approver before any of it comes out.

If the breast is joined to the house next door, the Party Wall etc. Act 1996 comes into play on both sides of the border. It is the owner of the building who serves notice, not the roofer. Cutting away a projecting chimney breast falls under section 2(2)(g), and the notice under section 3(2)(a) must go out at least 2 months before the work starts. Written consent from the neighbours is possible; a dispute is deemed to exist after 14 days of silence, and surveyors are appointed at that point. Questions about that process go to a party wall surveyor, not to building control.

These steps move the start date more than the price, but they come first.

How to read a breast removal quote before you sign

With a published range this wide, the wording of the quote in front of you matters more than the number. Ask each firm to put these points in writing:

  • whether the price includes VAT
  • whether scaffold is included
  • what will support the stack above, or whether the stack is coming down too
  • the state the room is left in, from the wall face to the floor
  • whether rubble leaves the house and the site is cleared
  • who deals with Building Regulations approval, and who serves any party wall notice

Where scaffold has to stand on the highway, we arrange the licence with our scaffolder. The notice to a neighbour is served by the owner, and we describe the work so it can be written up correctly.

Treat a figure given over the phone before anyone has looked in the loft as a guess. A stack that looks plain from the road can hide a flue running sideways into the next house, and that changes both the approach and the number.

If you want to know what the approval involves, the page on whether removing a chimney breast needs approval goes through it.

Related questions

Is the £2,500 figure what you would charge me?

No. It is MyJobQuote's average across the UK, not our price. Ours is a whole-job total, in writing, that follows a look at the stack from the loft and the rooms below it, with the approval and any shared-wall notice worked out beforehand, and the price covers the whole job from first cut to the last of the rubble.

Why does the range run from £1,200 to £3,500?

The ends of a range like this reflect different houses. The number of storeys, whether a stack above the roof stays, the state of the brickwork and whether the chimney is shared next door all change the job, and a visit to the loft sorts out which of them applies.