Chimney pointing

Repointing a chimney stack: mortar, access and timing

Repointing a chimney stack renews the mortar joints that keep weather out of the masonry. This guide covers the work, how we reach the stack, timing and the rules in England and Wales.

Horizon Roofing Hereford 9 min read

The stack is the section of a chimney that rises above the roof. It stands in the open on every face, with no eaves or slope to shelter its joints. Pointing is the mortar between its bricks or stones, and repointing means raking out the loose and crumbling joints and packing fresh mortar in their place.

The work looks small from the ground, yet a stack is a high, narrow structure. Lead flashing seals its foot where it meets the slope, and a mortar collar called the flaunching holds the pots at its head. Open joints let rain into the masonry, and from there into the chimney breast, the part that projects into the room, and the ceilings below. So the job may not be only pointing. We look at all three parts together and photograph each one for you.

This guide sets out what repointing involves, how the mortar is chosen, how we get to the stack, when to book, and which rules differ between England and Wales. For the wider range of stack work, see our chimney repairs page.

What repointing a stack actually involves

Repointing starts with a close look from the roof or from scaffold, because joints cannot be judged from the garden. We press and probe the mortar, note where it has gone soft or sandy, and photograph the worst faces so that you can see them on your own stack.

The work then follows a set order:

  • rake out the loose mortar back to sound material, without cutting into the bricks or stones
  • brush out the dust and damp the joints so the new mortar bonds
  • pack fresh mortar in layers and finish it to the profile of the old joints
  • check the flaunching, the pots and the lead flashing while the stack is within reach
  • clear the debris from the roof and the gutters and take it away

Raking out is the step that decides how long the work lasts. Fresh mortar laid over mortar that is still crumbling will fail along with it, so the joint is opened until the material behind it is firm. On a stone stack we also check the bed joints, the horizontal ones that sit under each course, because the weight of the courses above rests on them.

The mortar collar at the head is a separate repair, and our guide to flaunching on top of the stack explains it. A stack that leans, bulges or has lost masonry needs a different repair, because pointing cannot straighten it.

Matching the mortar to brick or stone

We pick the mortar to suit the existing stonework or brickwork of the stack. Brick, sandstone and other stone behave differently, and an older stack may have been built with lime mortar, a softer mix that lets moisture pass through the joints. Our answer on lime or cement mortar for a chimney sets that choice out in more detail.

Among the county's north-western timber-framed houses, the stone atlas that Herefordshire Council published describes the outside stacks as "commonly of local sandstone". Where a stack is built of that stone, we match the new joint to the old one in colour, texture and the way it sat in the face of the masonry. A wide band of hard grey mortar smeared across a sandstone stack changes how the house looks from the road, and it can work against the stone instead of with it.

Before any mortar is mixed we note:

  • what the stack is built of, and whether earlier repairs used a different material
  • the colour, grain and hardness of the existing mortar
  • the joint profile, whether flush, recessed or struck
  • whether the house is listed or in a conservation area, which changes what we ask the council first

You can ask for the mortar mix to be named on the written quote, and we are glad to name it. Set quotes side by side and see whether each one says if VAT and the scaffold are included in the total. Pointing carried out in the wrong mortar is slow to show and costly to undo, because the new joints must then be raked out again, so the choice is worth settling before the scaffold goes up. If the stack is part of a timber-framed house, the stone-stack guide for Herefordshire's black-and-white houses covers the stone itself.

Reaching the stack: ladder, tower or scaffold

Access is the part of the job that most changes its shape. A low stack on a gentle slope may be reached with a roof ladder and crawling boards. A tall stack, or one that needs work on all four faces, is safer and quicker to work from a scaffold, because it gives a level platform and a safe place to put the debris. A tower can help in between, where the ground is firm and level and the stack is not too high.

Whichever way we reach it, the stack is checked for movement before anyone leans on it. If a stone or brick rocks when pressed, we stop, make it safe and report back on what we found before pointing resumes.

Where scaffolding projects over a road or pavement, the Highways Act 1980 section 169 requires a licence. Our scaffolder and we arrange the licence, and the scaffold cost is included in your written total price. Fees and notice periods vary from council to council, and each fee has its own unit, so the figures below are not comparable:

Scaffold licence fees and notice, by council
CouncilSideFee and unitNotice
Herefordshire CouncilEngland£167, which covers a maximum period of 1 month; extensions £123 per monthAt least 10 days
Worcestershire County CouncilEngland£85 per week; £65 for later weeksNot stated
Gloucestershire County CouncilEngland£145 for a minimum of 28 days; £36 per 7 days to extendAt least twelve calendar days
Shropshire CouncilEngland£200At least ten working days
Monmouthshire County CouncilWales£108 administration fee; £27 per week to extendAt least 5 working days

For Powys addresses we confirm the fee and the notice period with the council before the date is fixed. Of the councils here, Worcestershire County Council is the only one whose page puts the duty on the contractor, who is "required to apply".

Signs that it is time, and when to book

Pointing may not fail all at once. These are the signs we look for, and several can be seen from the ground with binoculars:

  • joints that are empty, sandy or recessed so far that the edge of a brick or stone shows
  • bricks or stones that rock when pressed, or small pieces of masonry in the gutter
  • moss, grass or small plants rooted in the joints
  • a damp patch or flaking paint on the chimney breast inside, which can come from the stack above
  • mortar crumbs on the flat roof or the slope below the stack

Photographs taken from the same spot a year apart make a slow change easy to see, and you can send them to us with a message on WhatsApp before we visit.

On timing, the right moment is before open joints have let water into the stack, and ideally together with any other roof work, so the scaffold is put up once. We avoid pointing in rain or hard frost, because wet or frozen joints do not set properly. A nest in a pot can hold the work back, as the last section explains.

Repointing is priced after a survey, as a stack differs in height, face count, stone and condition, and you receive one written total price. Lead flashing can go with it, and MyJobQuote (page updated 22 September 2026) gives around £200 for a patch repair at a chimney and around £570 for replacing the flashing in full. Chimney flashing leaks have their own guide, on apron, step and back gutter detail.

Listed houses, conservation areas and rebuilding: the rules by side

Pointing a stack to match the existing masonry is repair. Rebuilding or replacing it is a larger step, and England and Wales treat the paperwork differently:

  • In England, works that would affect a listed building's "character as a building of special architectural or historic interest" (Planning (Listed Buildings and Conservation Areas) Act 1990, section 7) need listed building consent, so ask the council before pointing starts.
  • In Wales, the Historic Environment (Wales) Act 2023 section 88 says works to a listed building must be authorised, by listed building consent under section 89, and section 88 has been in force since 4 November 2024.
  • In England, Herefordshire Council says there are 64 conservation areas in the county. Whether an Article 4 direction applies to your house is a question for your council.
  • In England, permitted development Class C does not cover the installation, alteration or replacement of a chimney (paragraph C.1(d)(i)).
  • In Wales, Class C does not cover the installation, alteration or replacement of a chimney (paragraph C.1(c)(i)), nor the removal of a chimney on article 1(5) land, which includes conservation areas and National Parks.

Classes B and C stay open to a listed house in both countries, with consent required on top. Inside the Bannau Brycheiniog National Park, check with the National Park Authority. Removing a chimney breast is its own subject, with a guide of its own, because it brings in Building Regulations and sometimes a neighbour.

Shared stacks, nesting birds and bats

A stack on a party wall belongs to two households, and the Party Wall etc. Act 1996 covers both countries. The owner of the building being worked on, rather than the neighbour, sends the notice, and for cutting away a projecting chimney breast it must go out two months or more before the start (section 2(2)(g) and section 3(2)(a)). Surveyors enter the picture if next door objects, or says nothing for 14 days. Section 2(2)(j) separately lets an owner cut into the neighbouring wall to fit a flashing. Whether a given job touches those rights is a party wall surveyor's question, not building control's. Our guide to chimneys on a party wall covers notices and timing.

Wildlife can also set the date:

  • In England and in Wales, a nest is protected by section 1 of the Wildlife and Countryside Act 1981 from the moment a bird starts building, and the offence applies to a person who acts "intentionally".
  • In England, bat licences come from Natural England.
  • In Wales, bat licences come from Natural Resources Wales.
  • In both countries, regulation 43 of the Habitats Regulations is stricter: the offence covers damage to a bat roost or breeding site even where no harm was intended.

If we see a nest or a bat during the survey, we stop, tell you and rearrange the work around it. Birds can use the pots and the stack head, so the date for pointing may move for that reason alone. Bats can use gaps in old masonry and under lead, so we look in the joints and behind the flashing as we rake out, and we photograph what we find. A cowl fitted later can keep birds out of the flue, and a separate answer deals with that.

Repointing a stack: your questions

How can I tell from the ground that the pointing has failed?

Use binoculars on a dry day and look for dark, empty joints, edges of brick or stone standing proud of the mortar, plants growing from the stack and crumbs of mortar in the gutter below. A damp stain on the chimney breast inside can also point to the stack above. A survey confirms it.

Does repointing a stack need planning permission?

Pointing in matching mortar is repair, and we do not normally expect it to need an application. Rebuilding or replacing a chimney is different. A listed house also needs consent for any works that touch its character, in England and in Wales alike, so check with your council first if yours is listed.

Is the scaffold licence part of the repointing quote?

Yes. Where scaffolding overhangs the highway, we arrange the licence with our scaffolder, and your written total price already takes in the scaffold. Each council has its own fee and notice period, so the licence can set how soon work starts, and we tell you the date once it is confirmed.