01432 610152 Get a quote Call 01432 610152

Roofers in West Malvern

Roof repairs and re-roofs in West Malvern, 20 road miles east of Hereford.

The ridge comes first on every survey, and the photographs of what we find arrive with one written total price.

Get a free quoteCall 01432 610152

Roof questions that come with the Malvern Hills

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Roof windows and dormersThe National Landscape touches dormers, so planning comes before the order.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Listed in the villageA sewer gas vent and a pair of street lamps are listed Grade II.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Stacks and their leadA stack meets the weather on four faces, so we examine its lead first.

Our route to West Malvern

West Malvern on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

A West Malvern roof, read in three parts

Windows, gutters and stacks on a West Malvern house, taken in survey order

The survey for a West Malvern house runs through three callouts: roof windows and the designation around them, the eaves and gutters that carry rain away, and the stack with the lead that seals it.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Roof windows; 2 Eaves and gutters; 3 Stacks and lead.

Fig. 1 West Malvern roof drawn in section, three callouts numbered.

Callout 1 of 3

Cutting a roof window into a West Malvern slope

Inside the Malvern Hills National Landscape, which was an Area of Outstanding Natural Beauty until the renaming of 2023, West Malvern carries a designation but no planning powers of its own. Decisions on a roof window or a dormer rest with Malvern Hills District Council. The landscape's own planning page is explicit about it: the individual Local Planning Authorities decide, and the landscape team does not.

For West Malvern the designation's weight falls on dormers, and the English rules for every other roof change are in our planning guide. A roof window is therefore the lighter question, though its conditions still need reading, and they are laid out in our planning guide for roof windows. A listed house keeps those rights and also needs listed building consent, so the council hears from you before an order is placed.

Planning is one track and Building Regulations are another. Table 4.2 in AD L 2021 sets 2.2 for a rooflight, while a roof window takes 1.4 or WER Band B, and an order that confuses the two fails the test. A new opening means a cut rafter, with the timbers round the hole doubled up to carry the load before any flashing kit goes on. Applications go to South Worcestershire Building Control, which Malvern Hills District Council shares with Worcester City Council and Wychavon District Council; a registered building control approver is the alternative.

A window that lights a loft room is a means-of-escape question first. In England, AD B paragraph 2.5 sets out two routes once a storey is more than 4.5 m up: protect the stairway, or fence off the top floor and give it a second exit. The escape window in paragraph 2.10 (0.33 m2 openable, at least 450 mm by 450 mm) is meant for storeys within 4.5 m of the ground. Stair and escape route are settled first, and the glass follows.

Before a unit is chosen we photograph the slope it would sit in and inspect the rafters from the loft. Malvern Hills District Council publishes its own conservation area list, and a conservation area has a similar effect, so look up your street there. Our skylights page covers fitting and flashing.

Before a window is ordered

Who decides whether a West Malvern roof window can go in?

Malvern Hills District Council decides, and the designation only changes which permitted development rights apply. Here a dormer goes before the council first. Read the planning guide, then confirm your address with the council before a unit is ordered.

Planning is settled with the council first, and the rafters are checked from the loft.

Fig. 2 Roof windows, drawn close

Callout 2 of 3

Where the rain leaves a West Malvern roof

Eaves are the hand-over point: the last course of covering sheds into the gutter, and the gutter sheds into the downpipe. When either step fails, the evidence is a green stain or a dark patch on the wall beneath, well before a ceiling shows anything. Along a West Malvern run we look at three timbers and one overhang. The timbers are the fascia that holds the brackets, the soffit under the eaves and the rafter feet behind both. The overhang is the first course of tiles or slates, which has to project past the gutter lip so that drips land inside it.

Fall matters more than size. Brett Martin, a gutter maker, specifies 1mm of fall for every 600mm of run, and a length that has drooped between brackets holds a pool, spills at the joints and keeps the fascia wet. We test joints, stop ends and the shoe at the foot of each downpipe with running water before anything is ordered, since a joint that is resealed costs less than a run that is replaced.

Rafter feet bear on the wall plate, a beam laid along the wall head, and a joint that has dribbled for a long time can soften both. We press a probe into the timber and photograph the result. Fascia that is sound stays where it is, and a rotten length is cut out and replaced. Our guttering, soffits and fascias page covers the materials.

Wildlife lives in this zone too. Anyone who intentionally harms a nest in active use, or half built, commits an offence under the Wildlife and Countryside Act 1981, so a nest tucked behind a fascia board is photographed and the repair is sequenced after the birds have left. Bats and their roosts are protected as well, and GOV.UK lists roof repair among the work that can call for a Natural England licence. A bat found in the eaves ends the day's work, and Natural England is the next call.

What the survey measures at the eaves

Gutter fall
1mm for every 600mm, as Brett Martin sets out
Brackets
Spacing and fixing, so a full run cannot sag
Joints and stop ends
Tested with water before any length is replaced
Fascia and soffit
Probed for rot, with gaps a bird could use noted
Downpipe shoe
Checked for leaks onto the wall below

A nest or a roost behind the fascia changes the order of work, and the photographs record it.

Fig. 3 Gutters and downpipes, drawn close

Callout 3 of 3

Stack lead, listed lamps and a vent

Of all the parts of a roof, a stack is the one that stands entirely in the open. Rain and wind reach it from every side, and the weak point is the line where it leaves the slope. Lead seals that junction in three pieces. The flashing is a band whose top edge is tucked into a raked joint in the masonry and whose other edge overlies the covering. Soakers, folded sheets of lead, interleave with the courses of covering at the sides. To the rear, a lead trough named the back gutter takes water round the chimney. Royston Lead's table lists Code 3 as "Recommended for lead soakers only" and Codes 4, 5 and 6 for flashings, so the code follows the job. MyJobQuote says correctly installed lead flashing "can last for over 80 years", which is why lead in good order stays and cracked lead is renewed.

Higher up are the pots, then the flaunching and the pointing beneath them. Flaunching is the sloped bed of mortar that throws water away from the flue openings. Nothing up there is visible to a passer-by, hence the report holds one photograph per face, per pot and of the flue top. Where a stack and its breast are to be taken out altogether, the Planning Portal states plainly: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure."

Historic England's list includes West Malvern's Sewer Gas Vent (Grade II, list entry 1389547, first listed 7 November 2001) and Two Gas Street Lamps (Grade II, list entry 1389548, listed on that date too). They are street furniture, not roofs, but a house that carries its own listing would need consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 whenever the work touches its special character, and any permitted development right it keeps does not replace that consent.

Malvern Hills District Council states that no Article 4(2) Directions are in force, and a call to its planning team settles the position at your own address. Our chimney repairs page covers rebuilding and repointing.

What sets the price of a West Malvern stack job

Stack height
How much scaffold the climb needs and where it must stand
Masonry
Pointing, flaunching and how much brickwork is rebuilt
Lead
Flashings, soakers and back gutter to renew or keep
Highway
Whether the scaffold stands on a licensed public road

One written total price, never itemised.

West Malvern roofs: approval, scaffold and weight

Does re-covering a West Malvern roof need Building Regulations approval?

West Malvern is in England, so the Planning Portal's two limits apply: under 25 per cent of the building envelope and under 50 per cent of the roof. A job that stays inside both is not normally expected to need an application. Beyond either, it goes to South Worcestershire Building Control or a registered building control approver. We measure the slopes at the survey, so you know which side of the line the work falls before a price is written.

Do conservation areas or Article 4 directions touch a West Malvern roof?

A conservation area weighs on a dormer much as the National Landscape does, so ask Malvern Hills District Council before one is drawn. Malvern Hills District Council states that no Article 4(2) Directions are in force. The council keeps its own conservation area list, so look up your street on it, then read our guide to roof window planning before choosing a unit.

How is scaffold licensed at a West Malvern house?

Worcestershire County Council charges £85 per week, then £65 for subsequent weeks, and it holds the contractor responsible for applying, in its words "required to apply". We arrange the licence with our scaffolder; the scaffold is already priced into the quote. Because the council looks at applications on working days only, a West Malvern start date is fixed with that review time in hand.

A storm has damaged a West Malvern roof: what comes first?

Make the roof safe, photograph the damage, keep receipts and tell your insurer before permanent repairs. In the Financial Ombudsman Service's words a storm "usually involves violent winds"; rain, hail or snow on their own can be enough, and its decisions usually weigh expert reports and photos. Our photographs give your insurer a record, but the insurer decides the claim.

Is spray foam under a West Malvern roof a problem when the house is sold?

RICS reported in March 2023 that unease had spread through parts of the mortgage market, equity release being one example, and suggests a word with the mortgage provider. Make that call before foam goes under a roof and again before a sale. The Energy Saving Trust names the drawback of closed-cell foam as lacking vapour permeability, while open-cell foam allows more vapour through, and a roof's exposure to rot should be much lower with that type.

Does a heavier covering on a West Malvern house need a structural check?

Where the new covering is heavier by enough, yes. The Planning Portal asks for approval if a covering adds 15 per cent or more to the weight, and AD A uses "more than 15%". It is a Building Regulations matter, not planning. A change of material can add weight, so the survey looks at the rafters and the walls before a covering is chosen.

Book a West Malvern roof survey

Tell us the address and describe the fault, and a photographed survey will be booked in.

10-year workmanship guarantee, in writing