Callout 1 of 3
Chimney stacks and their lead in Barnard's Green
Our survey in Barnard's Green opens at the chimney stack, because it is the part of a house that meets the weather from every direction. A stack stands clear of the slopes, so rain and wind reach all four faces, and what runs off the brickwork or stone lands on the covering below. We look at the pointing, which is the mortar face of each joint, at the flaunching, the sloped mortar collar that holds the pots, and at the pots themselves. None of that can be seen from the road, so each face and the flaunching are photographed for the report.
Lead seals the junction where the stack comes through the roof. The flashing is tucked into a raked-out joint and laid across onto the covering, soakers slip beneath every course next to the stack, and behind it a lead tray known as the back gutter sends water round the corner. In Royston Lead's table every thickness carries a code number: Code 3 is "Recommended for lead soakers only", and Codes 4, 5 and 6 are listed for flashings. We fit the code to the job, and we note it in the report.
MyJobQuote says correctly installed lead flashing "can last for over 80 years". That is a hedged claim rather than a promise, but it explains why lead in good order is kept and lead that has split is replaced instead of being covered with sealant. A missing pot or cap is checked at the same time, since it leaves the flue open to the rain. If the stack itself has gone out of true, or its brickwork is loose, that is a rebuild, and our chimney repairs page sets out the choices.
Taking a stack and its breast out of a house is another matter. The Planning Portal states that removing a chimney breast always brings Building Regulations approval into play, since the breast is part of the building's structure. Where the breast is party property between two houses, the Party Wall etc. Act 1996 applies as well. A listed house adds consent for any work that changes its character, and Barnards Green House is one of the Grade II entries nearby.
A shared chimney breast
Who has to be told before a shared chimney breast is cut?
The neighbour, by a notice from the building owner doing the work, at least two months ahead of cutting away the breast. Neither side needs a surveyor unless the adjoining owner objects or says nothing for 14 days, and written consent can settle it sooner.
The crown of a stack cannot be seen from the road, so the photographs have to show it.