01432 610152 Get a quote Call 01432 610152

Roofers in Tibberton

Gable, lead and listed-house repairs in Tibberton, matched to how your house was built.

We sight along the verges first, photograph whatever turns up and then put the whole job into one written total.

Get a free quoteCall 01432 610152

Tibberton roofs: verges, lead and listed walls

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Verges on gable endsMortar drops out of a verge bed, and wind-driven rain then reaches the timbers.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Lead flashings and soakersLead seals the joints beside walls and stacks, and it can split or lift.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Three Grade II neighboursListed houses need consent as well, so the route is settled before the work.

Our patch around Tibberton

Tibberton on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Gable, lead and listed wall

Three stops on a Tibberton survey: the gable verge, the lead and the listed neighbours

Our Tibberton visit opens on the gable verge, turns to the lead flashings that seal the roof against walls and stacks, and closes with the listed houses, where consent rules apply ahead of any work.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Lead sheet; 3 Listed walls.

Fig. 1 A Tibberton roof cut open: verge, lead and listed wall, marked 1 to 3.

Callout 1 of 3

Gable ends and the verge that finishes them

Tibberton surveys begin at the gable end, the point at which covering stops and the verge starts. A verge is the finished edge of a roof along a gable end. In the traditional method the tiles overhang the wall slightly, rest on a row of undercloak tiles beneath, and are pointed in mortar. The newer method uses dry-fix cappings screwed down along the edge, and BS 8612 is the standard that covers them.

Mortar beds can fail. Wind and the slow movement of the gable wall crack the bed until pieces drop away, and a gap along a verge lets wind-driven rain reach the batten ends and the timber under the edge. From the road we sight along the line, since a wavy edge shows tiles that have lifted. Close up, we press the cappings and look beneath the overhang for a dark, damp underside.

Marley points out that after the 2015 amendments "mortar could no longer be relied upon as the only means of securing the roof covering". So when a verge is rebuilt we add a mechanical fixing along its length, or fit a dry-fix system, whichever the house suits. On a listed house that choice is part of the conversation with the council, and a bedded look can be kept where it matters to the building's appearance.

When a whole verge has to be rebuilt, the sequence is simple. The failed tiles and old mortar come off, the undercloak is checked and replaced if it has cracked, and the tiles go back with fresh bedding and a fixing at each one. Hips and ridge ends that meet the verge are looked at before we leave, so a new edge is not left beside a weak one.

Bargeboards, the boards fixed along the edge of a gable, belong to the same inspection. One that has rotted at its foot lets water into the verge below, so we probe the lower ends and write down any decay. Where the gable faces the road, the scaffold may stand on the highway, and section 169 of the Highways Act 1980 then requires a licence; we arrange the licence with our scaffolder. Our pitched roofing page explains verges, ridges and re-covering in more depth.

The gable verge, close up

SoundEdge tiles sit straight on the undercloak, mortar full and dry
Needs workMortar dropped out, tiles lifted, damp staining on the timber beneath

A wavy line along a gable edge, seen from the road, tells us where to put the ladder.

Callout 2 of 3

Lead flashings, soakers and which thickness goes where

Lead is the metal that keeps a roof dry where it meets something solid: a wall, a chimney, a dormer cheek, a valley. It comes in sheets of several thicknesses, each with a code number, and the code that suits a job depends on the part. Royston Lead's table gives Code 3, at 1.32 mm, as "Recommended for lead soakers only", while Codes 4, 5 and 6 (1.80, 2.24 and 2.65 mm) are all listed for flashings. A thin sheet used where a thick one is wanted splits early, which is why we read the table before we order.

The pieces have plain names once you see them. A step flashing climbs a sloping wall like a stair, one step to each course of brick. An apron lies across the foot of a chimney stack. A cover flashing hangs over the top of the piece beneath it and sheds water on to it. Soakers are folded lead pieces, one slipped beneath every tile course where the slope runs past a wall. Together they form a joint with some give in it, which still keeps water out.

Lead fails in recognisable ways. A flashing fixed too rigidly, or cut too long, splits at its bends as it warms and cools. A strip that has lifted from its joint lets rain run behind it. A bead of mastic smeared over either is a cover-up, not a cure, and we strip it back to see the real fault. New lead is dressed with room to move, and the joint in the masonry is raked out and wedged properly. Valleys deserve the same attention. A lead valley gutter sits between two slopes and carries the water of both, so a pinhole or a split seam there lets in far more than a flashing fault would. Tiles along the edge are raised so the lead underneath can be cleared and inspected, and the report carries photographs.

MyJobQuote says that correctly installed lead flashing "can last for over 80 years", a hedge worth keeping in mind when someone says it must all come off. Sound lead stays; lead that is torn, thin or lifted is renewed, and each replaced piece gets its own picture once it is fitted and dressed, taken before the scaffold or ladders leave. Approved Document C cites BS 6915:2001 for lead sheet, and BS 6229 covers flexible membranes only, so it has nothing to say about a lead roof. Our lead roofing page covers valleys, dormers and flat lead as well.

Lead pieces and their jobs

Step flashing
Follows a sloping wall, one step per course
Apron
Lies across the foot of a chimney stack
Soaker
A folded piece under each course beside a wall
Cover flashing
Hangs over the top edge of the piece beneath
Fig. 3 Leadwork, drawn close

Callout 3 of 3

The Laurels, Meredith and the Old School

Last comes the wall, home to Tibberton's protected houses. The parish had 586 usual residents at the 2021 Census, and Gloucester station is 5.1 miles away in a straight line. Three Historic England entries sit among the houses: The Laurels is Grade II (list entry 1078587, first listed 18 October 1985), Meredith is Grade II (list entry 1078581, first listed 18 October 1985) and the Old School is Grade II (list entry 1153354). If your house is one of them, or stands next to one, the survey notes it before anything else.

Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 covers works that would affect "its character as a building of special architectural or historic interest". A listed house keeps its permitted development rights; a separate consent is also required. The covering, its fixings and the technique are submitted to Forest of Dean District Council in writing, and nothing is ordered until the answer comes back. Copying what is on the roof is the easiest case to argue, and changing the material is the hardest.

For a listed house we photograph the roof from every reachable angle before touching it, label each picture by slope and position, and note the covering, its size and how it is fixed. That record goes with any consent application, so the council can see what is there now and what is proposed.

For any Tibberton address, look at Forest of Dean District Council's own conservation area list, and ask the council whether an Article 4 direction applies. Roof windows and dormers raise planning points that our planning guide for roof windows covers. Building control is Forest of Dean District Council's own team, on 01594 812315, or a registered building control approver may be hired instead. Leaving central Hereford to the south-east, Tibberton is 24.4 road miles on, about 44 minutes by road. For the way we work on protected houses, see listed and heritage roofing.

Listed neighbours

Does a house next to a listed one need consent for roof work?

Not by itself, because consent attaches to the listed building. Even so, a neighbour's scaffold, access or party wall can bring the two houses into the same job, so the survey notes where the boundary sits.

Tibberton roof questions, from gable to lead

What goes wrong at a Tibberton gable verge, and how is it mended?

Mortar cracks and drops out, the edge tiles lift, and rain then reaches the battens and the timber under the edge. We rake out what has failed, rebed the verge with a mechanical fixing along its length, or fit a dry-fix system covered by BS 8612, and check the bargeboard at the same visit. Photographs of the gap and the finished edge are in your report.

Which thickness of lead goes into a chimney flashing, and which into a soaker?

Royston Lead's table lists Code 3 as "Recommended for lead soakers only", and Codes 4, 5 and 6 for flashings. Code 4 is 1.80 mm, Code 5 is 2.24 mm and Code 6 is 2.65 mm. We choose between them on site, after looking at the run of the joint and how exposed the stack is, instead of working from a list in the van.

Which British Standard does Approved Document C cite for lead sheet?

Approved Document C cites BS 6915:2001 for lead sheet. That is the standard to ask a supplier about when lead is specified for a flashing, a soaker or a valley. The thickness comes from the Royston Lead code table for each use, and the dressing and fixing come from the detail of the job. We record the code and where it went in your report, so the roof file shows what was fitted.

Is my Tibberton house one of the listed ones?

Search Historic England's list by address. Three Tibberton entries are Grade II: The Laurels (1078587), Meredith (1078581) and the Old School (1153354). Yours may be another, so check before planning anything. If it is listed, section 7 of the 1990 Act demands consent in addition to any permitted development you hold, so ask Forest of Dean District Council before anything else.

What rating must a roof window meet when it is swapped on a Tibberton house?

AD L 2021 Table 4.2 sets roof windows at 1.4 or WER Band B minimum and rooflights at 2.2, so a roof window takes 1.4, and it is only a rooflight that takes 2.2. Dormers and anything on a listed house raise planning points, set out in our planning guide, and a mix-up between the two figures is easy to make. The rating on the delivery paperwork is checked before a unit goes on the roof.

Who prepares the construction phase plan on a Tibberton re-roof?

Under CDM 2015 a homeowner counts as a domestic client, and regulation 7(1) hands those client duties to the contractor on a one-contractor job. If several firms are on the project, the principal contractor takes them. Regulation 15(5) adds that a sole contractor must have the construction phase plan drawn up first, ahead of the site being set up. When we are that contractor, our plan covers access, edges and the working area.

Get a Tibberton roof looked over

Say which gable, flashing or listed front concerns you, and you will get pictures of it and a single written total.

10-year workmanship guarantee, in writing