01432 610152 Get a quote Call 01432 610152

Roofers in Sheet

Roof repairs and re-roofs for Sheet's listed house, lodge and neighbouring homes.

Sheet is a drive of about 32 minutes from central Hereford, 23 road miles to the north. One written total ends each survey.

Get a free quoteCall 01432 610152

Sheet's listed house, lodge and bridge

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Sheet HouseGrade II, first listed 12 November 1954, so roof work needs consent.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Sheet LodgeAlso Grade II, and listed on that date too: 12 November 1954.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Ludlow's conservation areasNearby Ludlow has Gravel Hill, Galdeford, Steventon and town conservation areas.

Sheet and the roads in

Sheet on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Sheet roofs: windows, pitch and listed walls

Roof windows, pitch and the listed walls at Sheet

Three callouts, in survey order: the roof window and what England's Part L asks of it, the pitch that decides what covering a slope can take, and the listed house and lodge where consent comes first.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Roof window; 2 Pitch; 3 Listed walls.

Fig. 1 Sheet roof cut open: window, slope and wall head, numbered.

Callout 1 of 3

Roof windows and the figures behind them

A roof window is a gap cut into the weatherproofing, so a Sheet survey looks at it early. We check the glass for failed seals and misting, the frame for stains and softness, and the flashing around it, which is the set of pieces that carries water past the frame and down the slope. A window that was well fitted still leaks if the covering beside it has slipped, so the courses on both sides and the ones above are read as well. From the loft we examine the lining and the timbers round the opening for damp. The frame is set to the slope at the depth the maker specifies, and the flashing kit is dressed over the covering so water passes down the sides and over the head, not under them. A new opening also means cutting a rafter, so the framing around it is trimmed with timber of a matching size, and a photograph is taken of that stage before the lining hides it.

England sets thermal figures for new openings. AD L 2021 Table 4.2 gives a window, roof windows included, 1.4 or WER Band B, and gives a rooflight 2.2 W/(m²·K). Rooflights take the 2.2 figure; a roof window takes the window one. Regulation 2 of the 2010 Regulations keeps roof windows and roof-lights outside the thermal element, along with windows and doors, which is why the glazing is judged on its own figures and the roof around it on Table 4.3. AD L 2026 renumbers these as Tables 3.2 and 3.3 from 24 March 2027.

A loft room adds fire questions. AD B says escape windows apply to storeys within 4.5 m of the ground, with an openable area of 0.33m2 or more, 450mm high and 450mm wide at the least, and a bottom edge no higher than 1100mm above the floor. Planning permission for a new window or a dormer is a different question, and our planning guide for roof windows sets out where the limits fall. For work on the glazing and its surround, our Velux and skylight installation page explains how a window is fitted into an existing slope without disturbing more covering than it must.

Window or rooflight?

Do roof windows and rooflights meet the same U-value?

No. AD L 2021 Table 4.2 sets a window, roof windows included, at 1.4 or WER Band B, and the figure for a rooflight is 2.2. The two sit on separate rows of the table, so each is checked against its own figure.

A window that was fitted well still leaks when the slates beside it have slipped.

Fig. 2 Roof windows, drawn close

Callout 2 of 3

Pitch decides what a slope can carry

The second callout is the slope itself, and the first thing measured is its pitch, the angle of the slope in degrees. Every covering has a lowest pitch at which it is meant to be laid, and a roof too shallow for its covering lets rain blow back up under the laps. Marley's published table lists Plain concrete at 35°, Edgemere at 17.5° and the Lincoln clay pantile at 15°, each as a minimum. Those are product names rather than places, and the exact product's data sheet is the real check. For natural slate, Cupa says BS 5534 puts the lowest pitch at 20 degrees with moderate exposure, a 500mm slate and a 115mm overlap, and that hook fixings are not for any pitch below 25 degrees.

That matters when a covering changes. A heavier one needs the timbers checked: a covering that "increases the weight of the roof covering by 15 per cent or more" needs approval, says the Planning Portal, and AD A paragraph 4.4 counts an increase of "more than 15%" as a significant change. A different product can also call for a steeper minimum pitch than the roof already has. Lifespans are ranges and keep their hedges. HomeBuilding gives plain concrete tiles "40-50 years" where Marley expects around 60 years, and clay tiles have a BRE minimum of 60 years, for clay alone.

Outbuildings need one more question. HSE says: "If the building was built or refurbished before 2000, assume that there is asbestos in it." HSE also says "AC roofs are always fragile", which is why nobody walks on asbestos cement sheeting. HSE treats careful, intact removal of asbestos cement as non-licensed; broken-up sheeting falls into notifiable non-licensed work. Removing insulating board from soffits is usually licensed work, and that goes to a licensed firm. For asbestos, HSE asks for a lockable skip rather than an open one. Our roof replacement page covers full re-coverings.

A pitched roof need not fail all at once. Where the damage is local, slipped or cracked units are replaced and the fixings renewed, and the report says how much of the slope is still sound. Where the battens and underlay have gone too, the whole slope is stripped and relaid. Either way you receive one written total, with scaffold inside it.

Lowest pitches, as the makers publish them

Marley Plain concrete
35 degrees minimum
Marley Edgemere concrete
17.5 degrees minimum
Marley Lincoln clay pantile
15 degrees minimum
Natural slate, per Cupa
20 degrees in moderate exposure
Fig. 3 The slopes, drawn close

Callout 3 of 3

Sheet House, Sheet Lodge and the Ludlow conservation areas

At callout three the covering meets the masonry, and consent enters the picture. Historic England records Sheet House as Grade II (list entry 1202858, first listed 12 November 1954) and Sheet Lodge as Grade II (list entry 1291728, first listed on that date as well). Ledwyche Bridge is Grade II too (list entry 1383690), though a bridge carries no roof. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 stops anyone altering a listed building in a manner that affects its character, "unless the works are authorised". A lodge is a small house at the gate to a larger property, and its roof is judged against the same test as the main house.

A listing does not remove permitted development rights; it adds consent as a second step. Shropshire Council decides, so materials and method go to the council before any covering is ordered, and our photographs of each slope go with the question. Where a roof of this kind is re-covered, the aim is to keep the original material wherever it can still do the job, and to match it closely where it cannot.

For conservation areas, Shropshire Council names Ludlow Gravel Hill, Ludlow Galdeford, Ludlow Steventon and Ludlow close to Sheet. The council's own list is the place to check a particular address, and an Article 4 direction is a separate question to put to Shropshire Council. Shropshire Council Building Control can be reached on 01743 258710, or a registered building control approver can take the job on. Our listed and heritage roofing page explains how work on a protected house is planned.

The contract itself carries consumer rights. Under regulation 5 of the Consumer Contracts Regulations 2013, a contract concluded face to face anywhere other than the trader's premises is off-premises, and that includes your own kitchen table after a survey. You then have 14 days to cancel (regulation 30), and a start before it ends needs your written request (regulation 36). Regulation 28(1)(e) excludes an urgent repair visit requested by you. Citizens Advice runs the consumer helpline on 0808 223 1133.

What the survey records at a listed wall head

  • Covering where it meets the masonry
  • Flashing and pointing along the joint
  • Chimney stacks and their lead
  • Gutter line and downpipe fixings
  • The original material, slope by slope

Sheet roofs: windows, listings and fire rules

Could a roof window be fitted in a Sheet roof, and which U-value applies?

AD L 2021 Table 4.2 sets a window, roof windows included, at 1.4 or WER Band B, with 2.2 for a rooflight. On a listed building such as Sheet House or Sheet Lodge, the opening also needs listed building consent from Shropshire Council before anything is cut. Whether planning permission is needed is covered in our planning guide, and the survey looks at the rafters first.

Do repairs to the roof of Sheet House need consent because it is listed?

Sheet House is Grade II (list entry 1202858, first listed 12 November 1954). Under section 7 of the 1990 Act, authorisation is needed for works touching its character, and a listing leaves permitted development rights in place beside that requirement. Shropshire Council decides whether a given repair affects character, so we ask it first, with photographs of the slope, and the materials are agreed before anything is ordered.

Which Ludlow conservation areas lie near Sheet?

Close to Sheet, Shropshire Council names Ludlow Gravel Hill, Ludlow Galdeford, Ludlow Steventon and Ludlow. Whether a Sheet address falls inside any of them is for the council's own list to say, and the council is also the one to ask about any Article 4 direction. Neither answer stops a repair, though both can shape how a new covering or opening is proposed, so it pays to ask before a price is agreed.

What happens about scaffold licensing at Sheet?

Section 169 of the Highways Act 1980 makes a licence necessary where scaffolding would obstruct the highway. On Shropshire Council's fees page the entry is £200, and its application page asks for ten working days' notice, not counting Saturdays. We arrange the licence with our scaffolder, and the scaffold forms part of the quote you receive, so the notice period goes into the programme at the outset.

What fire rules apply to a loft conversion at Sheet?

In England, AD B paragraph 2.5 requires a protected stairway on a storey above 4.5 m unless an alternative escape route is provided, and paragraph 2.23 allows sprinklers as another route for open-plan arrangements. Escape windows serve storeys within 4.5 m of the ground. The edition in force is the 2019 one incorporating 2020, 2022, 2025 and 2026 amendments, and building control confirms the detail on your plans, so a conversion is designed around the stair and the window from the beginning.

Is old asbestos cement a worry on a Sheet garage or outbuilding?

HSE says a building built or refurbished before 2000 should be assumed to contain asbestos. HSE treats asbestos cement lifted off intact as non-licensed work; once it is broken up, the work is notifiable non-licensed. Insulating board in soffits is usually licensed, and that goes to a licensed firm. HSE asks for a lockable skip, and asbestos waste from a job never goes into an open one. The survey looks before anyone steps on the roof, and the findings are written into the report.

Ask about a roof window or re-cover at Sheet

Describe the problem and, if you can, send a picture. A survey follows, and one total goes into writing.

10-year workmanship guarantee, in writing