01432 610152 Get a quote Call 01432 610152

Roofers in Bitterley

Roof repairs and re-roofs for Bitterley houses in the Shropshire Hills, near Ludlow.

We photograph each fault from the ridge down, explain it in plain words and put a single total price in writing.

Get a free quoteCall 01432 610152

Bitterley's listed houses and protected hills

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Grade II houses in the villageBitterley House, the Old Rectory and Three Ways Cottage each carry Grade II.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    A National Landscape settingRoof windows and dormers follow different planning rules inside the Shropshire Hills.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Dhustone conservation area nearbyAsk Shropshire Council whether your lane falls inside a boundary.

Locating Bitterley

Bitterley on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

A Bitterley survey from verge to listed wall

Verges, roof windows and Grade II walls: how we read a Bitterley roof

Our survey of a Bitterley house climbs in a fixed order: the gable verge and ridge first, then any roof window the hills rules touch, then the listed wall head where the law sits behind the masonry.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Verge edge; 2 Roof windows; 3 Listed walls.

Fig. 1 A Bitterley roof in section: verge, roof window and wall head, each one numbered.

Callout 1 of 3

Bitterley gable verges and the ridge above them

Our visit to a Bitterley house starts at the top. At the gable end, the verge is where the covering runs past the end wall and finishes; along the summit, the ridge is a line of capping tiles that closes the two slopes. Both finish the covering at an open edge, with nothing beyond to lap over them, which is why we climb to them first and photograph them before anything else. From the ground, a lifted capping tile or a gap under the verge is almost impossible to judge, and a long lens does not show a hairline crack.

Verges come bedded or dry. A bedded verge sets its last tiles or slates on mortar, over an undercloak, a narrow strip of tile, slate or board that carries the edge. A dry verge uses units screwed or clipped down, and BS 8612 deals with dry-fix ridge and verge systems. Bedded edges tell us their age through hairline cracks, crumbled mortar and tiles that rock when pressed. Dry ones are judged on the clips, the screws and the gaps at each joint.

Fixing matters because the rules moved. Marley, the tile maker, says that "Installing to BS 5534 isn't required by law", and adds that "The 2015 amendments made it clear that mortar could no longer be relied upon as the only means of securing the roof covering." Mortar is not banned. A ridge or verge rebedded in Bitterley therefore gets a mechanical fixing too, and the mortar face can still be finished to suit the house.

Where a hip, the angled line down the corner of a hipped end, meets the ridge, three lines of covering gather under one cap, and we photograph that knot of tiles separately because the capping there is cut to meet three ways. A loose verge or ridge is a repair, not a reason to re-roof, and the report says so. Where a whole slope has come to the end of its working life the report says that instead, with pictures beside each finding. A heavier covering is its own question: the Planning Portal says approval is needed when a new material "increases the weight of the roof covering by 15 per cent or more", so the rafters are assessed before heavier tiles are ordered. Our roof repairs page shows how smaller jobs run, from first survey to cleared site.

Looked at along a Bitterley verge

  • Mortar cracks and gaps beneath the edge tiles
  • Edge tiles that rock under a gloved hand
  • Clips and screws on any dry-fix unit
  • Ridge capping where it meets the verge
  • The undercloak strip below the overhang

Rebedding a ridge is a small job, and we price it as one.

Fig. 2 The verge, drawn close

Callout 2 of 3

Roof windows and dormers inside the Shropshire Hills

Bitterley sits inside the Shropshire Hills National Landscape, a title it held earlier as an Area of Outstanding Natural Beauty. The label is a designation, not a planning authority: Shropshire Council decides planning applications here. What the designation alters is the rulebook. Under English rules a National Landscape matters for a dormer, the box that projects from a slope to add headroom, so a Bitterley dormer starts with Shropshire Council. A flush roof window is different work, with its own conditions in the planning guide.

The conditions that apply to a roof window, including what happens on a side slope, are set out in full in our planning guide for roof windows. Read it before you choose a position, because the answer depends on the elevation and on whether the house is listed.

Planning is half the picture, and the energy rules are the other half. Where an existing dwelling gains a roof window, AD L 2021 Table 4.2 asks for 1.4 or Window Energy Rating Band B as a minimum, while a rooflight is held to 2.2. Both figures are in W/(m²·K), the standard measure of heat loss. A loft conversion falls under Table 4.3 instead, where a retained roof has a threshold of 0.35 and an improved figure of 0.16. AD L 2026 renumbers these as Tables 3.2 and 3.3 from 24 March 2027, and until that date the 2021 tables apply.

The detail around a new opening decides whether it stays dry. A roof window needs its flashing kit fitted to the covering beneath it, matched to the profile of the tile or slate around it. We fit the unit, flash it and photograph the junction before the lining goes over it, so you can see work that will be hidden for good. Our skylights page covers supply and fitting. For building control, Shropshire Council Building Control answers on 01743 258710, and a registered building control approver is the alternative.

A roof window in the hills

Where do I check the rules for a roof window in the National Landscape?

Shropshire Council is the planning authority for Bitterley, and our planning guide sets out the roof window and dormer rules. Conditions, a listing or an Article 4 direction can still apply, so ask the council before you order.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

Bitterley House, the Old Rectory and Three Ways Cottage

The wall head is the last callout: the line where roof, masonry and the law meet. On the National Heritage List, Bitterley House (list entry 1383650, first listed 29 February 2000), the Old Rectory (list entry 1383661, first listed 12 November 1954) and Three Ways Cottage (list entry 1383662, first listed 15 March 1974) are each Grade II. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 asks for consent before work that would affect "its character as a building of special architectural or historic interest".

A listed house keeps its permitted development rights, and listed building consent is a second layer added to those rights, so a repair that looks like-for-like can still be a question for Shropshire Council. We photograph the roof as found, agree the covering, fixings and method with the council, and only then lift a tile. The rafter feet and the wall plate, the beam that runs along the wall's upper edge and carries them, are checked from the loft, because an old leak can leave its mark on that timber.

Lead is dressed to suit the house too. Royston Lead's table lists Codes 4, 5 and 6 for flashings, and Code 3 is "Recommended for lead soakers only", so thin sheet is kept for soakers and the heavier codes go where a flashing is wanted.

Where a roof carries stone slates, SPAB's note on slate and stone roofing is the reference: it says Welsh slate and stone roofs "are predominantly double-lapped", meaning each unit overlaps the courses beneath it. It also warns that "Claims of unavailability or long delivery times should always be checked with the quarries." We take that advice as written: before a listed roof loses its stone, the supplier's claim is checked at the source.

Shropshire Council's conservation areas near Bitterley include Dhustone. Whether your own address sits inside a boundary is for Shropshire Council to confirm. Check whether an Article 4 direction applies with Shropshire Council as well, since such a direction can withdraw specified permitted development rights across a defined area. To see how we handle protected houses, start with our listed and heritage roofing page.

Terms met on a listed Bitterley roof

List entry
The number the National Heritage List gives each protected building
Wall plate
The timber along the wall top that carries the rafter feet
Double-lapped
Each unit overlaps the courses beneath it in the roof
Article 4 direction
A council order withdrawing specified permitted development rights across a defined area

Bitterley questions: listings, hills and scaffold

Does the Shropshire Hills designation affect a repair to a Bitterley roof?

A repair that keeps the same covering is not what the designation is aimed at. Its effect falls on dormers, and Shropshire Council decides any application, not the landscape team. Roof windows are treated differently, and the planning guide explains how. Bring the roof, the elevation and any listing to the survey and we will go through what applies to your house.

Whose consent covers a listed roof at Bitterley?

Shropshire Council does, through listed building consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and that consent sits alongside any permitted development right the house still has. Bitterley House, the Old Rectory and Three Ways Cottage are all Grade II. Before work starts we photograph the roof as found and set out the covering, fixings and method, so the council has a clear record to agree.

How much of a Bitterley roof can be re-covered before building control gets involved?

Bitterley is in England, where the Planning Portal sets the bar: an application is not normally required while the work touches under 25 per cent of the building envelope and under 50 per cent of the roof. Beyond that, ask Shropshire Council Building Control or a registered building control approver. Added weight is separate: a covering that weighs 15 per cent or more over the old one calls for approval, with a structural check first.

What happens about scaffold on a Bitterley lane?

Section 169 of the Highways Act 1980 requires a licence for scaffolding that obstructs a highway. Shropshire Council's fees page lists £200 for scaffolding or hoarding, giving no period, and it wants applications made at least ten working days, excluding Saturdays, before the date you would like it up. We arrange the licence with our scaffolder, and that cost is folded into the single total we send after the survey.

What if a bat or a nesting bird turns up in a Bitterley loft?

Stop work near it and call us. A wild bird's nest in use or being built is protected by section 1 of the Wildlife and Countryside Act 1981, which makes it an offence to take, damage or destroy it intentionally. Bats come under section 9(4), which reaches anyone acting intentionally or recklessly, and regulation 43 of the Habitats Regulations also catches damage to the place where bats breed or rest. Licences come from Natural England.

How is the flat roof of a Bitterley extension recovered?

A flat roof in felt, EPDM or GRP is a membrane job, and BS 6229:2025 covers membranes. NFRC states a minimum 1:80 finished fall, while IKO advises designing for 1:40 to reach it. Lifespans differ by source: HomeBuilding gives EPDM 25-30 years and Less gives 30 to 50 years, so treat both as typical ranges. We check the fall and the outlets at survey, then price the work as one total.

Send Bitterley roof photos for a written price

Describe the roof as it looks from your garden, and we will survey from the verge and ridge down, then write one total price.

10-year workmanship guarantee, in writing