01432 610152 Get a quote Call 01432 610152

Roofers in Ludlow

Roof repairs, re-roofs and heritage roofing in Ludlow, 23.9 road miles north of Hereford.

Conservation areas and Grade I buildings are part of the town, so we check what is protected before we price a repair.

Get a free quoteCall 01432 610152

Grade I names and Ludlow's conservation areas

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ludlow's conservation areasLudlow Steventon, Ludlow Galdeford, Ludlow and Ludlow Gravel Hill are on the council's list.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Grade I roofsThe Reader's House, Feathers Hotel and Castle House Flats all carry Grade I.
  • Newer homes with grey concrete tile roofs along a curving estate road
    St Laurence's ChurchChurches in use by the Church of England follow a separate consent route.

How far Ludlow is

Ludlow on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Ludlow roofs, from the stack to the listing

A Ludlow roof read as stack, roof window and listed wall

Three callouts cover a Ludlow house: the chimney stack and what changes when a breast comes out, the roof window and the energy figures behind it, and the listed walls where a protected town's roofs meet Shropshire Council's rules.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Stack and breast; 2 Roof window; 3 Listings and areas.

Fig. 1 Stack, roof window and wall head numbered on a drawn house in Ludlow's streets.

Callout 1 of 3

Ludlow chimney stacks: lead, breasts and shared walls

A stack is the point where a house's structure, its weather and sometimes its neighbours all meet, which is why a Ludlow survey goes there first. From the roof we read the pointing, the flaunching around the pots and the lead that seals the stack to the slope, and we photograph all four faces. Where one stack serves a pair of houses, the wall beneath it is shared, and that changes the paperwork once a job goes beyond repair. Whatever the stack is built from, new work is done in matching material, so the finished repair sits within the old building and not as a patch.

Removing a chimney breast is a structural matter. The Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." Under the Party Wall etc. Act 1996, the owner of a Ludlow house who wishes to remove a chimney breast from a wall adjoining next door serves a party wall notice on the neighbour, and for cutting into a shared wall the figure is two months, so at least that long must pass after the notice reaches the neighbour. A neighbour's agreement can be given in writing. The neighbour's dissent, or silence for 14 days, is what brings in a party wall surveyor. Those questions go to a party wall surveyor, and not to building control.

Reaching a stack in a town street can call for scaffold over the pavement, which needs a licence under section 169 of the Highways Act 1980. We arrange the licence with our scaffolder. Shropshire Council's page also lists embargo periods for its market towns, with Christmas and Good Friday among them, so the date for putting scaffold up is chosen with those in mind. The quote you receive already includes the scaffold.

When the stack stays, the repair is local: joints repointed, the collar around the pots made good and any failed lead replaced. Photographs of each face go to you before and after, so you see the same view we did. A nest found in a pot is covered by section 1 of the Wildlife and Countryside Act 1981, which covers a nest in use, or one half-made, and makes it an offence for anybody to wreck it, remove it or harm it intentionally, and we plan the work around it. Our chimney repairs page describes stack work from a single pot to a full rebuild, and the questions to ask about a stack that leans.

Before a breast comes out

Who is told, and when, if a Ludlow chimney breast is removed?

Building control is approached first. On a shared wall, a breast cannot come out without a party wall notice to the neighbour, served by the owner with plenty of warning, and the neighbour can answer with written consent.

Where a stack serves two houses, the wall under it belongs to both.

Fig. 2 Chimneys, drawn close

Callout 2 of 3

Roof windows in Ludlow: energy figures and fire rules

A roof window is glazing built into a pitched slope, set to follow the line of the covering. Roof windows and rooflights carry different energy figures. AD L 2021 Table 4.2 gives a window as "1.4 or Window Energy Rating Band B minimum" and says that row includes roof windows. Rooflights are held to 2.2. The roof element itself, where a new roof is built on an existing dwelling, must reach 0.15. AD L 2026 takes over from 24 March 2027, keeps the same values and renumbers the table 3.2.

Under regulation 2 of the Building Regulations 2010, only walls, floors and roofs count as thermal elements, and glazed openings in a slope sit outside that term. Fitting a roof window therefore falls under the window figures, while renovating the roof around it falls under Table 4.3, with a threshold of 0.35 and an improved figure of 0.16. Paragraph 4.13 lets a lesser figure stand if the improved one is out of practical reach or cannot recover its cost in 15 years.

Loft rooms bring fire safety in. For a storey above 4.5 m, AD B para 2.5 offers either a protected stairway or an alternative escape route, and para 2.23 gives open-plan layouts a sprinkler alternative. We plan a loft room starting with the staircase and finishing with the window, since an escape window serves only storeys within 4.5 m of the ground. The wording comes from the 2019 edition of AD B incorporating 2020, 2022, 2025 and 2026 amendments.

Planning is the other half. Dormers and roof windows follow different rules in England, a listed building needs consent as well, and every opening in a slope is worth raising with Shropshire Council early. Our planning guide for roof windows sets out the England position, and the council's own answer for your house is worth having in writing before an order goes in. The fitting itself, from the frame to the flashing kit, is covered on our Velux and skylight installation page.

Figures behind a Ludlow roof window

Roof window
1.4, or WER Band B
Rooflight
2.2
Renovated roof
Threshold 0.35, improved 0.16 (Table 4.3)
Payback relaxation
15 years or less, paragraph 4.13
Next edition
AD L 2026 from 24 March 2027

Checked before a Ludlow roof window is ordered

  • Which slope and how the rafters run
  • Frame size against the rafter spacing
  • Flashing kit that suits the covering
  • Glazing figure for the edition in force
  • Escape route if it serves a loft room

Callout 3 of 3

Grade I entries, St Laurence and Ludlow's conservation areas

The wall head is where roof and law meet, and Ludlow has more to say there than a village does. The Church of St Laurence and Attached Railings is Grade I (list entry 1202794, first listed 15 April 1954). So are the Reader's House (list entry 1220775, first listed 15 April 1954), the Feathers Hotel (list entry 1282026, first listed 15 April 1954) and Castle House Flats (list entry 1202824). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 makes consent a requirement for works that touch what makes a listed building special, and Shropshire Council decides those applications.

St Laurence's is Church of England, which puts its roof work under the faculty jurisdiction for as long as worship continues. Four more bodies are exempt while their buildings are in use: the United Reformed Church, Roman Catholic dioceses, the Methodist Church and Baptist Union member churches, where a Schedule 1 trust corporation holds the building. No exemption reaches a Unitarian chapel, a Quaker meeting house or a church that has stopped holding worship, and for those Shropshire Council grants or refuses listed building consent.

Shropshire Council's conservation areas for the town are Ludlow Steventon, Ludlow Galdeford, Ludlow and Ludlow Gravel Hill. Which one holds your address, if any, is for Shropshire Council to confirm. Each list entry has a number, so quote it when you write to us or to the council about a listed house, and the right building is identified at once. Check whether an Article 4 direction applies with Shropshire Council as well, because a direction may withdraw rights that a householder would otherwise rely on.

On a protected building the pace is slow on purpose. The covering and its fixings are recorded in photographs, a matching material is chosen and the method is agreed with the council before any stripping starts. For building control, a Ludlow address goes to Shropshire Council Building Control on 01743 258710, or to a registered building control approver. Our listed and heritage roofing page sets out how that work is planned and recorded.

A protected roof, handled and mishandled

SoundMatching material, fixings recorded, consent in hand before work
Needs workSubstitute covering, no photographs, no word from the council

Ludlow roofs: Grade I listings, flat roofs and windows

How is a roof repair handled on a Grade I Ludlow building such as the Feathers Hotel or the Reader's House?

Both are Grade I, so any work that would affect their special interest needs listed building consent from Shropshire Council under section 7 of the 1990 Act, even though permitted development rights stay with a listed building. We photograph the roof as found, name the matching material and agree the method with the council before stripping begins, so nobody is surprised halfway through.

Which of Ludlow's conservation areas covers my street?

Shropshire Council's list for the town names Ludlow Steventon, Ludlow Galdeford, Ludlow and Ludlow Gravel Hill. Where each boundary falls is for Shropshire Council to say, so ask about your street before you decide anything. Ask the council as well whether an Article 4 direction applies to you, because one can remove rights that let a householder carry on without an application.

Can a flat roof on a Ludlow extension be re-covered in felt, EPDM or GRP?

Yes, and the sources disagree on how long each lasts, so we name both. HomeBuilding gives EPDM 25-30 years and Less 30 to 50; GRP 25-30 against 25 to 40; felt 10-15 against 10 to 20. BS 6229:2025 covers membranes, and NFRC states a minimum 1:80 finished fall, though IKO advises designing for 1:40, so the falls are set out on the survey.

Does a roof window need planning permission on a Ludlow house?

Roof windows and dormers follow different rules in England, and a listed building needs consent in addition to anything else. For a Ludlow roof window, read our planning guide and ask Shropshire Council whether an Article 4 direction applies, and put any dormer to the council as well. Our planning guide sets out each position, and Shropshire Council can give a definite answer for a particular house, which is worth having in writing.

Which energy figure applies to a roof window fitted in a Ludlow house?

AD L 2021 Table 4.2 sets 1.4 for a window, roof windows included, or WER Band B as the alternative. For a rooflight the number is 2.2. Those values carry across to AD L 2026, which takes effect on 24 March 2027, so we quote against whichever edition applies when the work is built, and tell you which edition that is before you sign anything.

What does scaffold on a Ludlow street involve?

Section 169 of the Highways Act 1980 is the law behind a scaffold licence for scaffold over a road or pavement. Shropshire Council's published fee for scaffolding or hoarding is £200, with no period stated, and ten working days, not counting Saturdays, must pass before the scaffold can go up. We arrange the licence with our scaffolder, so the quote you receive already includes the scaffold, and we plan the date with you.

Ask for a survey that starts with the listing

Give us the street and a note about the roof, and we will say what is protected before we price in writing.

10-year workmanship guarantee, in writing