01432 610152 Get a quote Call 01432 610152

Roofers in Ludford

Roof repairs and re-roofs for Ludford's church, listed houses and homes on Ludlow's doorstep.

Ludford lies 22.7 road miles to the north of central Hereford, around 33 minutes' drive. One written total ends every survey.

Get a free quoteCall 01432 610152

Ludford's church, house group and Ludlow-side conservation areas

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    St Giles' churchGrade II* and, being Church of England, in the faculty system.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Ludford House entryList entry 1291720 includes Ludford House and is graded II*.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Ludlow's conservation areasShropshire Council names Ludlow Steventon, Ludlow Galdeford and Ludlow near Ludford.

Ludford on the area map

Ludford on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Ludford roofs, ridge to wall head

Ridge fixings, eaves and gutters, and the listed church at Ludford

Three callouts, top to bottom: the ridge and how its units are fixed, the eaves and gutter that carry the water away, and the listed church and houses where consent decides the method.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge fixings; 2 Eaves and gutter; 3 Listed walls.

Fig. 1 Ludford roof cut open: ridge, eaves and listed wall, numbered.

Callout 1 of 3

Ridge units and what holds them down

A Ludford survey begins on the ridge, the one line every slope depends on. The ridge is a row of capping units laid on the highest line of the roof where the slopes meet, and each unit is held by mortar, by a dry-fix arrangement of clips and screws, or by both. Press a unit that has lost its bed and it rocks. Open joints give rain a way in at the uppermost course and the battens under it, the strips of timber carrying the covering. At a hip, the outside corner running down between two slopes, the check is made again.

Fixing is where the rules have moved. Marley, the tile maker, says that "Installing to BS 5534 isn't required by law", and it explains that since the 2015 amendments mortar alone has not counted as enough to secure a covering. The standard itself, BS 5534:2014+A2:2018, covers slating and tiling, while BS 8612 is the dry-fix specification. Mortar has not been banned. On a ridge we rebed here, each unit takes a fixing as well as its bed, and the report names the fixing used.

A tired ridge calls for a repair and gets a repair price. If the survey finds the covering spent across most of the slopes, England's Building Regulations apply. The Planning Portal's test turns on whether "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected"; if both hold, no application is normally needed. A new covering that "increases the weight of the roof covering by 15 per cent or more" is caught as well. Because Ludford sits close to Ludlow's conservation areas, any switch of covering material goes to Shropshire Council for a view before a price is written. The verge, where the covering finishes over a gable wall, is looked at on the same walk. Verge units are bedded or fixed much as ridge units are, and once its bedding goes, wind can lift the edge course. A tile or slate that has lifted there is refixed, and the pointing beneath is raked out and renewed where it has failed. Smaller ridge and verge jobs are described under roof repairs, and each fault is recorded in place with a photograph of the unit concerned.

Looked at along a Ludford ridge

  • Units that rock or have shifted
  • Mortar joints that have opened
  • A mechanical fixing on every unit
  • The corner where ridge meets hip
  • The last unit at each gable

Every unit on a rebedded ridge gets a fixing as well as a bed.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Eaves, gutters and where the water goes

The second callout is the foot of the slope, where everything the roof sheds arrives. The first run of covering, the fascia board and the gutter are therefore read as one assembly. A gutter that sags between brackets will hold water, and one that spills over soaks the wall below and the timber behind. Brett Martin, a maker of guttering, gives the fall as "1mm for every 600mm" towards the outlet, so we sight along each length and look for stains on the wall beneath, which mark a failing joint or outlet.

Brackets matter as much as the channel. A run held by loose or corroded brackets drops out of line again, so we test the screws into the fascia and the spacing along the run before judging the gutter itself. Where a length has to be replaced, the new section is set to the same fall as its neighbours and the joints are made so that they do not catch debris.

Behind the gutter, the underlay needs air. HR stands for high resistance, and HR underlay, Marley says, is not vapour-permeable; for a cold roof it asks for a gap at the eaves of "25mm" along pitches of 15° or less and "10mm" on steeper ones. A blocked gap is a fault worth finding. In the loft we look for damp where the rafters meet the wall, and at the long timber they bear on, before a stain reaches a ceiling. Air-permeable underlay is different: Marley says fortuitous ventilation at the eaves can be enough where the ceiling is well sealed and third-party certification is met.

Roofline materials age too. A retailer of plastic fascia, an interested party, says uPVC can typically perform for between 20 and 40 years, so a board that has bowed or split is replaced and one that is sound is cleaned and left. The report names any length that has come away. Our guttering, soffits and fascias page explains the options, and scaffold for a high run is included in the written quote. Downpipes are followed to ground level too; and a cracked or blocked one delivers the whole roof's run-off to a single spot at the foot of the wall.

Eaves figures from the makers

Gutter fall
1mm for every 600mm, says Brett Martin
Eaves gap, 15° or less
25mm with HR underlay, says Marley
Eaves gap, over 15°
10mm with HR underlay, says Marley
HR underlay
High resistance, not vapour-permeable
Fig. 3 Eaves and gutters, drawn close

Callout 3 of 3

The listed church, Ludford House and Ludlow's conservation areas

Our third callout is high on the wall, at the point where roof gives way to the lists. Historic England records the Church of St Giles as Grade II* (list entry 1291747, first listed 15 November 1954), and the entry named Charlton House Garden House Ludford House St Giles House as Grade II* (list entry 1291720, first listed on the same date). The Old Bell is Grade II* as well (list entry 1202820). Ludford had 673 usual residents at the 2021 Census. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 asks for consent before works that would alter a listed building's special interest, and a listing leaves permitted development rights in place while adding that consent on top.

The Church of St Giles is Church of England, one of the Ashfords group of churches, so as long as services go on, repairs to its roof pass through the diocese's faculty system. Section 60 of the same Act says its controls "shall not apply to any ecclesiastical building which is for the time being used for ecclesiastical purposes". A closed church would be different, and so would a chapel of a denomination outside the exemption. The houses take listed building consent from Shropshire Council, and we settle materials with the council before a slate is ordered.

Tall gables on listed houses need careful access. Scaffold is planned with boards and ties placed to avoid fixing into old masonry where we can, and the plan is agreed with you before a date is booked. Where a single contractor does the work, regulation 7(1) of the CDM Regulations 2015 hands a household client's duties to that contractor, and regulation 15(5) calls for a construction phase plan.

Shropshire Council names the Ludlow Steventon, Ludlow Galdeford and Ludlow conservation areas near Ludford. Whether your address sits in one is the council's call, and the same goes for any Article 4 direction, so check both with Shropshire Council. Roof windows and dormers at Ludford each prompt planning points, and our planning guide for roof windows explains them. Shropshire Council Building Control is on 01743 258710, or the work can be passed to a registered building control approver. See also listed and heritage roofing.

Four terms from a Ludford survey

Faculty
Church of England permission for work to a church in use
Listed building consent
Council consent for works that alter a listed building's special interest
Wall plate
The beam along the wall top that the rafters bear on
Fascia
The board along the eaves that carries the gutter

Ludford roofs: church, ridges, gutters and consents

How does Church of England status change roof work on St Giles' church at Ludford?

St Giles is Grade II* (list entry 1291747, first listed 15 November 1954) and is Church of England. While services go on, roof work is handled through the faculty system and not through listed building consent, because the 1990 Act exempts an ecclesiastical building in ecclesiastical use. If its use changed, the answer could change too, so we confirm the position with those who run the church first.

Do the Ludlow conservation areas reach Ludford houses?

Shropshire Council names Ludlow Steventon, Ludlow Galdeford and Ludlow near Ludford, and its own list shows whether a given address falls inside any of them. Ask Shropshire Council too whether an Article 4 direction applies. Swapping like for like is one question and altering the roof's appearance another, and the survey photographs the slope so the council has something exact to judge.

What fixing should a rebedded ridge on a Ludford house have?

BS 8612 covers dry-fix ridge systems, and BS 5534:2014+A2:2018 is the code for slating and tiling. Marley says following BS 5534 is not a legal requirement, and that since the 2015 amendments mortar cannot be relied on as the sole means of holding the covering. Each capping unit therefore gets a mechanical fixing alongside its bed, and on a listed ridge the bedded look is kept so the line does not change.

Does re-roofing in Ludford need Building Regulations approval?

In England the Planning Portal's test settles most re-roofs: when under 25 per cent of the building envelope and under 50 per cent of the roof is touched, no application is normally needed. Larger work goes to building control. Shropshire Council Building Control can be rung on 01743 258710, or a registered building control approver can act instead, and we check before pricing.

Who deals with a scaffold licence for a Ludford house on a public road?

A licence is needed under section 169 of the Highways Act 1980 when scaffolding obstructs a highway. Shropshire Council's fees page lists £200 for a scaffolding or hoarding licence without stating a period, and asks for applications to arrive ten working days or more beforehand. We arrange the licence with our scaffolder, and the quote you sign already includes the scaffold, so none of this is a separate bill.

How level must a gutter on a Ludford house be?

Level is the wrong aim, because a gutter needs a fall. Brett Martin gives "1mm for every 600mm" towards the outlet. If the middle of a run dips, water stands there and spills past the edge onto the wall. We sight along every length, check the brackets and joints, and photograph any section that needs resetting or replacing, so you can see the dip for yourself before agreeing to the work.

A ridge-and-eaves survey for your Ludford roof

Describe the fault and add a photograph if you can. The survey works from the ridge to the gutter and ends in one written total.

10-year workmanship guarantee, in writing