Roofers in Newland, near Malvern

Newland roofs, from roof windows and flat extensions to a Grade I church and almshouses.

Each fault gets a photograph taken on the roof itself, then one total price is set down in writing.

Get a free quoteCall 01432 610152

Where Newland roofs meet the rules

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Roof windows and rooflightsA new opening in the slope raises planning, Part L and flashing questions.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Flat roofs on porches and extensionsA flat roof needs a finished fall, so water leaves instead of ponding.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade I church and almshousesA listed church and the almshouse blocks each follow their own consent route.

Newland on our coverage map

Newland, near Malvern on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Newland roofs, window to church wall

Window, flat roof and church wall: the three details of a Newland survey

A Newland survey opens with the roof window and what the rules ask of it, moves to the flat roofs on extensions and porches, and finishes at the listed church and almshouses, where consent decides the method.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Roof window; 2 Flat roof; 3 Church wall.

Fig. 1 Roof window, flat roof and wall: three numbered details in section.

Callout 1 of 3

A roof window and the rules around it

The first callout is the roof window, an opening set into the slope. In Newland it raises three questions at once: whether it needs planning permission, what energy standard the glazing must reach, and how the lead around the frame is formed. The first question belongs in our roof window planning guide, which explains how England's permitted development rules treat a roof window and a dormer in a conservation area. Malvern Hills District Council lists Newland as a conservation area, and the council lists no Article 4(2) Directions as being in force.

On energy, Table 4.2 of AD L 2021 asks a window, roof windows included, to reach 1.4 or WER Band B. Rooflights are a separate, fixed-in-place type of opening, with a figure of 2.2. The same table gives 0.15 for a new roof. AD L 2026 Table 3.2 repeats those values from 24 March 2027, so a window ordered now meets both editions. Where an existing roof is renovated, Table 4.3 sets 0.35 as the threshold and 0.16 as the improved value.

Lead does the sealing round the frame: a strip dressed against the glazing bar and tucked into the slope, with soakers folded in under the courses alongside it. A soaker is a small bent piece of lead that keeps the joint between frame and covering dry. Royston Lead's table shows Code 4 as suitable for soakers and flashings, and Code 3 as "Recommended for lead soakers only". We identify which code is in place before we judge whether it can stay, because a flashing cut from the wrong gauge fails early.

Condensation is the other thing to plan for, because a glazed opening is a cold surface in a room under the slope. We ask what is below the window, whether that is a bedroom or a loft room, so the position suits how the space will be used. Listing changes the first step. On a listed building, a new opening in the slope alters the roof's character, and that needs listed building consent from the council before anything is ordered. Fitting a new roof window, or replacing an old one, is covered on our skylights page, and the survey photographs the slope you have in mind so the opening can be placed against the rafters and clear of any chimney run. Cutting a window opening through the rafters means the cut timbers must be carried by new trimmers, the short cross-pieces framing the hole, and that structural detail is shown in the survey notes before an order is placed.

Figures for a Newland roof window

Roof window
1.4 or WER Band B, Table 4.2
Rooflight
2.2, a separate figure
New roof
0.15, Table 4.2
Renovated roof
0.35 threshold, 0.16 improved, Table 4.3

A roof window brings a planning question, an energy figure and a lead detail in one opening.

Fig. 2 Roof windows, drawn close

Callout 2 of 3

Flat roofs on porches and extensions

Callout two takes us up to the flat roof over a porch, a bay or an extension. It looks simple and it leaves the least room for error. A flat roof sheds water by its fall, and BS 6229:2025, as NFRC summarises it, sets a minimum 1:80 finished fall. IKO advises designing for a fall of 1:40. A roof built dead level holds a pond, and a pond is where the membrane gives up.

How long each covering lasts is given as a range, and the published ranges differ. For EPDM, HomeBuilding gives 25 to 30 years and Less gives 30 to 50. For GRP, HomeBuilding gives 25 to 30 and Less gives 25 to 40. For felt, HomeBuilding gives 10 to 15 years and Less gives 10 to 20. Treat each range as typical, never as a promise, and expect a roof laid well and kept clear of leaves to sit at the better end. BS 6229:2025 covers flexible membranes only, so a lead flat roof falls outside it.

We look at the upstands, the short walls where the membrane turns up against the house, because that is where a flat roof has most of its joints. We check the edge trim and the outlet, and we photograph every blister, split and pool. AD L 2021 treats a new membrane over an existing flat deck as renovation, which brings the insulation under review, so a recover is not always a simple swap. At the point where roof and house wall join, we examine the lead flashing that covers the turned-up edge, and the outlet or gutter that takes the water away at the low side. Each photograph is tied to a spot on a simple sketch, so you can find the fault yourself afterwards.

Size matters too. No application is normally needed for a re-cover in England when less than 25 per cent of the building envelope is affected and less than 50 per cent of the roof is affected; that is the Planning Portal's test. A patch sits well inside that and a full strip may not. Our flat roofing page explains the covering options, and we say plainly when mending the roof makes more sense than replacing it.

Patch or recover

When is a flat roof past patching?

When the water is ponding because the fall is wrong, or when splits and blisters cover much of the surface. A single puncture can be patched. A roof that holds standing water needs the fall corrected, and that can mean recovering it.

Standing water on a flat roof is a fall problem before it is a membrane problem.

Fig. 3 Flat roofs, drawn close

Callout 3 of 3

St Leonard's, the almshouses and The Grange

Callout three is the church wall, in a parish whose 2021 Census population was 296 usual residents (ONS). The Church of St Leonard is listed Grade I (list entry 1098739, first listed 25 March 1968). The Church of England's faculty system governs roof works at St Leonard's while it is in use, and council consent does not apply. Two almshouse blocks are listed Grade II: the Eastern Detached Block to West of Beauchamp Almshouses (list entry 1098741, first listed 9 February 1988), and the Western Detached Block (list entry 1349272). The Grange is Grade II too (list entry 1349273, first listed 9 February 1988).

Those three are a house and almshouses, not churches, so the council's listed building consent governs roof work touching their special interest, under section 7 of the 1990 Act on listed buildings and conservation areas. Even a repair in matching material goes to Malvern Hills District Council ahead of the first tile, and the report we write gives the covering, the fixings and the photographs it will want to see. Where the almshouse blocks stand apart from one another, each has its own list entry, so each roof is described separately.

Building control for Newland is South Worcestershire Building Control, a joint service of Malvern Hills District Council, Worcester City Council and Wychavon District Council, and a registered building control approver can act instead. Section 169 of the Highways Act 1980 sets the licence for a scaffold on the public highway. Worcestershire County Council tells householders that licence applications are for the contracted firm to make: it is "required to apply".

Central Hereford is 21.7 road miles to the west, roughly 36 minutes by road, and the survey visit is booked with that drive in mind. Our listed and heritage roofing page explains what protected buildings need from the first visit, and the scaffold sits within the single total in our quote.

Terms for the Newland listings

Grade I
The highest listing grade, given to buildings of exceptional interest
Faculty
The Church of England's own permission for work on a church in use
Detached block
A separate building within a listed group, with its own list entry
Finished fall
The slope of a flat roof once it is complete

Newland roofs: windows, flat roofs and listings

Which flat roof covering suits a porch or extension in Newland?

That depends on the shape and the use. HomeBuilding and Less disagree on lifespan: EPDM 25 to 30 years against 30 to 50, GRP 25 to 30 against 25 to 40, felt 10 to 15 against 10 to 20. All three need a finished fall of at least 1:80, per NFRC's reading of BS 6229:2025. The survey measures the fall first, then we match the covering to the roof.

Can a new roof window go in a house in the Newland conservation area?

Possibly, but check first. Malvern Hills District Council lists Newland as a conservation area, so ask the council about a Newland dormer. The council lists no Article 4(2) Directions as in force. Our planning guide explains how England's rules treat roof windows, and a listed house needs listed building consent for a new opening as well, so ask before ordering.

What energy figure must a Newland roof window reach?

AD L 2021 Table 4.2 gives a window, including a roof window, 1.4 or WER Band B. A rooflight takes 2.2. Both values carry over to AD L 2026 Table 3.2, which takes effect on 24 March 2027 in England. If the surrounding roof is renovated, Table 4.3 asks for 0.16 against a 0.35 threshold, so insulation is part of the plan.

Which body consents to roof work at St Leonard's church?

The Church of St Leonard is listed Grade I under entry 1098739, and it is Church of England. While it is in use, works go through the faculty system, not listed building consent. A chapel that has closed, or one belonging to a Unitarian or Quaker congregation, sits outside the exemption and needs the council's consent. Ask the church before you plan anything.

Do the Beauchamp Almshouse blocks need consent for a roof repair?

Both detached blocks are listed Grade II, under entries 1098741 and 1349272. Work touching their special character needs listed building consent from Malvern Hills District Council. Quote the entry number, describe the covering and the fixings, and ask the council before you appoint anyone. We photograph the roof so that the application has real evidence behind it, and each block is described on its own.

Who applies for the scaffolding licence on a Newland job?

Poles or boards over the public highway bring in section 169 of the Highways Act 1980. Worcestershire County Council tells householders that licence applications are for the contracted firm to make: it is "required to apply", at £85 per week and £65 for subsequent weeks. The scaffold is part of our one written total, with no separate bill to chase.