01432 610152 Get a quote Call 01432 610152

Roofers in Leigh

Leigh roofs, from the gable verge and gutter line to the Grade I church and barn.

Our survey begins at the roofline, with photographs of the faults and a total price set out on one written sheet.

Get a free quoteCall 01432 610152

Leigh: verges, gutters and Grade I walls

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Verges on gable endsA gable verge faces the wind, and dropped mortar lets rain behind the tiles.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Gutters under the eavesA sagging gutter holds water and stains the wall beneath it.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade I church and barnLeigh Court Barn and St Eadburga's church are both Grade I listed.

Leigh from Hereford

Leigh on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Verge, gutter and Grade I wall at Leigh

From the gable verge to the Grade I walls: a Leigh roof in three parts

A Leigh survey runs in a fixed order: the verge along each gable first, then the eaves and gutter line, then the listed buildings and the consents, council contacts and scaffold licence that sit behind any repair.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Gutter run; 3 Listed walls.

Fig. 1 A Leigh house in section: verge, gutter and wall, each one numbered.

Callout 1 of 3

The verge where a Leigh gable meets the sky

A Leigh survey opens at the gable ends, because the verge, the sloping edge where the roof stops above a gable wall, is exposed on its top face and along its underside at once. In a bedded verge the last tiles or slates sit on an undercloak, a bedding layer of slate or tile beneath the edge, and mortar closes the gap between the two. A dry verge swaps that mortar for plastic or metal units held by screws, and BS 8612 is the specification written for dry-fix ridge and verge units.

Marley, the tile maker, writes that "Installing to BS 5534 isn't required by law", but adds that after the 2015 amendments "mortar could no longer be relied upon as the only means of securing the roof covering". A bedded verge on a Leigh house is therefore not condemned. It wants a mechanical fixing behind the mortar, and an older building may keep its mortar line for the look of the thing. From the ground we look for a verge line that waves instead of running straight, and for pale crumbs of mortar on the path below. From the loft, daylight along the gable wall tells us the undercloak has opened.

Tiles at the edge of a roof carry more load from the wind than tiles in the middle of a slope, so a loose one at the verge deserves a ladder visit soon after it is spotted. We lift the edge tiles, check the battens that the tile nibs hook over, and photograph every stage so the pictures reach you with the report. Lost verge mortar is a repair, and the written price covers that repair alone.

Even where a whole slope proves worn, the Planning Portal's England test keeps the question small: no application is normally needed when "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected." A bigger job goes to building control.

On a gable that is also a party boundary or sits close to a neighbour's, access matters too. We check how a ladder or a scaffold tower will stand before we quote, because a verge cannot be rebedded from the ground, and the report records the access it needs. Our roof repairs page covers the smaller work on a gable edge.

Checked along a Leigh gable verge

  • A verge line that runs true
  • Mortar that is sound, not crumbling
  • Edge tiles that sit tight
  • Battens beneath the last course
  • Daylight along the gable wall inside

Lost verge mortar is a job for a trowel and a ladder, not a new roof.

Fig. 2 The verge, drawn close

Callout 2 of 3

Gutters, brackets and the wall they protect

Callout two follows the drip line, where rain leaves the slope and a gutter has to catch it. A gutter is a shallow channel on brackets, screwed to the fascia (a timber or plastic board that closes the rafter ends) at the point where the roof overhangs the wall. It has to fall gently toward its outlet, and Brett Martin, a gutter maker, gives that fall as "1mm for every 600mm". Where a run dips between two brackets it holds a pool, the pool seeps at the joints, and the wall below shows a dark tide mark long before anyone looks up.

We run a hand along the joints and the stop ends, since a gutter can open at its seams, and we look at the brackets for rust or a loose screw. A fascia that has gone soft behind a gutter shows only when the gutter comes off, so we photograph the board at that point and you see for yourself whether it can take a new run. A sound fascia lets the gutter be replaced alone. A soft one is a bigger job, and the report says where the rot starts.

Eaves also let air into a cold roof. Marley advises a 25 mm opening along the eaves for pitches of 15 degrees or less and 10 mm for steeper ones when the underlay is high resistance, which means it is not vapour-permeable and cannot breathe on its own. We check that a later fascia, a coat of paint or a drift of leaves has not closed that gap. Inside the loft, a torch on the rafter feet shows any dark staining.

Cast iron, aluminium and plastic all appear on older and newer houses alike, and a repair is matched to the run that is already there. A cracked joint on a cast-iron length is a different fix from a split in a plastic one. Last come the downpipes. We follow each one down from the hopper to the gully and photograph where it empties. A pipe that finishes against the foot of a wall rather than over a drain leaves a damp patch that is easy to read from the garden. Our guttering, soffits and fascias page covers the replacement work in full.

What a Leigh gutter run has to do

Fall
A gentle slope toward the outlet, to the maker's figure
Brackets
Hold the channel level and free of sag
Joints
Sealed, with stop ends that stay tight
Outlet
Clear, so the overflow never tops the pipe
Pipe foot
Ends over a gully, not against the wall

A gutter holding a pool is a fault we can show you in a photograph.

Fig. 3 Gutters and downpipes, drawn close

Callout 3 of 3

Listed walls, the church faculty and the road licence

At the third callout the drawing shows a wall; in Leigh that wall is the listed buildings. The Church of St Eadburga is Grade I (list entry 1098765, first listed 29 July 1959), and so is Leigh Court Barn (list entry 1349245, first listed 9 February 1988), the great cruck barn of ten bays whose roof, the Victoria County History wrote in 1924, "is covered with red tiles and is hipped in the upper part at each end". Old Post House is Grade II (list entry 1349246, first listed 26 October 1987), and the Old Rectory is Grade II as well (list entry 1157700). Leigh parish counted 1,589 usual residents at the 2021 Census (ONS). Reaching the village from central Hereford means 23.1 road miles heading north-east, around 38 minutes at the wheel.

The Planning (Listed Buildings and Conservation Areas) Act 1990 catches works "in any manner which would affect its character as a building of special architectural or historic interest", at section 7, when no authorisation has been given. Owners of listed houses keep permitted development rights, although listed building consent is required on top, so the covering, the method and any new roof window are settled with Malvern Hills District Council before a tile comes off. For St Eadburga's, a Church of England church while it is in use, roof work follows the faculty jurisdiction, not the council's listed building consent.

Where a listed roof needs work, the order matters. We photograph the fault, you take the pictures and the list entry number to the council, and the consent is in hand before the scaffold goes up.

Malvern Hills District Council's conservation area list includes a Leigh conservation area, so look up your address if a new covering would change the street view. The council states that no Article 4(2) Directions are in force at present. Read our planning guide for roof windows before you plan a dormer or a new window.

South Worcestershire Building Control is run jointly by Malvern Hills District Council, Worcester City Council and Wychavon District Council, and the work can instead be inspected by a registered building control approver of your choosing. Scaffolding on or over the highway cannot stay up without a licence (Highways Act 1980, section 169). Leigh's scaffold licences are Worcestershire County Council's to grant, and the council describes the firm hired for the work as "required to apply". Scaffolding that stays on your own land needs none. Our approach to a protected roof starts on the listed and heritage roofing page, from the first photograph to the final lead dressing.

Words you will meet on a listed Leigh roof

Verge
The sloping edge of the roof above a gable wall
Undercloak
A bedding layer of slate or tile that carries the verge mortar
Fascia
The board closing the rafter ends that carries the gutter
Faculty
The Church of England's consent system for work to its churches
Listed building consent
Council consent for works that affect a listed building's character

Leigh roofs: gables, gutters and listed buildings

What does a failing verge on a Leigh gable look like from the ground?

Stand back from the gable and sight along the edge. A verge line that waves, a gap between the last tile and the wall, pale mortar crumbs on the path and a damp stain high on the gable wall are the signs to note. None of them proves the roof is finished. We climb to the verge, photograph the mortar and the undercloak, and tell you whether it needs a repair or a rebed.

Does re-roofing a listed building in Leigh, such as the Old Post House, need consent?

Consent is needed if the work would touch a listed building's special character, and section 7 of the 1990 Act is the test. The Old Post House is Grade II (list entry 1349246). Malvern Hills District Council decides, so put the question to it. Take the list entry number and the covering you have in mind, and keep every tile in place until the council has replied.

Do I need Building Regulations approval to re-roof a house in Leigh?

Leigh is in England. For a re-cover, the Planning Portal sets two limits, under 25 per cent of the building envelope and under 50 per cent of the roof, within which no application is normally needed. Bigger jobs go to South Worcestershire Building Control or a registered building control approver. If insulation goes in as well, AD L 2021 Table 4.3 sets a threshold of 0.35 and an improved figure of 0.16, until AD L 2026 Table 3.3 takes over on 24 March 2027.

Is work on the roof of St Eadburga's church a matter for a faculty?

For a Church of England church while it is in use, the faculty jurisdiction applies, so listed building consent from the council is not the route for St Eadburga's, which is Grade I (list entry 1098765, first listed 29 July 1959). A closed or redundant church is different and does need listed building consent. For any other building, ask the body that owns it what it requires before work starts.

Who licenses scaffolding on a Leigh road, and at what fee?

Worcestershire County Council charges £85 per week and £65 for subsequent weeks, plus a £25 surcharge for urgent applications. Scaffolding on a Leigh road is licensed by Worcestershire County Council, which says whichever firm is hired is "required to apply". A scaffold that never leaves your own land needs no highway licence, and one that does is priced into our single written total, so nothing arrives as a separate bill.

Is my Leigh house inside the conservation area, and where do I look?

Malvern Hills District Council publishes the conservation area list and map that name Leigh. Find your address on the map, and ring the council if your lane is hard to place. Inside a designated area a Leigh dormer needs the council's view, with roof windows covered in our planning guide, so read it before you commit to a design. A plain repair with nothing altered in appearance raises a smaller question.

Book a verge-to-gutter survey in Leigh

A picture of your gable end or gutter line is enough to start; we then arrange a visit and give you a written total price.

10-year workmanship guarantee, in writing