01432 610152 Get a quote Call 01432 610152

Roofers in Mitchel Troy

Roof and roofline repairs in Mitchel Troy, a village inside the Wye Valley National Landscape.

Our surveys begin at the verge and the eaves. Every fault is photographed, and the quote is a single written total.

Get a free quoteCall 01432 610152

Green slate, a barn and a National Landscape

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Green slate at St Michael'sCadw's listing for the church records green slate roofs.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Church Farmhouse and its barnChurch Farmhouse and the barn to its west are both listed Grade II.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Inside a National LandscapeThe Wye Valley National Landscape covers the village, so roof lights need planning permission.

Mitchel Troy and the lanes around it

Mitchel Troy on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Mitchel Troy roofs, verge to wall

Gable edges, the roofline and the listings around the church and farm

The survey takes three passes through Mitchel Troy: the verges at the gable ends, then the roofline of fascia, soffit and gutter, then the listed walls and National Landscape rules that govern any change.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Roofline; 3 Listed walls.

Fig. 1 Mitchel Troy house in section: verge, eaves line and wall numbered for survey.

Callout 1 of 3

Verges and gable ends round the church and farm

A verge is the exposed edge of a roof above a gable wall, and it faces the wind with nothing to shelter it. Mitchel Troy has a church and a farm group to measure against. The Cadw listing for St Michael's church (Grade II*) records "green slate roofs", and Church Farmhouse and the barn to its west are both listed Grade II. On roofs like these, the verge is where an owner first sees trouble: a stripe of daylight along the wall head, pointing that has dropped into the border below, or a slate corner that lifts in a gust.

We work along each verge from the eaves to the ridge. Loose pointing is raked out and renewed, undercloak slates (the narrow course tucked beneath the edge slates) are checked for cracks, and the edge slates themselves are tested for movement. Dry-fix verge systems come under BS 8612. On an older gable we weigh a bedded edge against a clipped unit by asking how the house was built, because a dry system can look foreign on a historic wall. Wherever a mortar bed is kept, a mechanical fixing goes behind it. A photograph is taken before the old verge comes off and again once the new one is dressed, so you can compare them. If a slate along the edge has cracked across its width, it is replaced, not glued, and the replacement is chosen by tone against its neighbours before it goes up.

Green slate comes in shades, and matching is a matter of laying samples side by side on the roof. HomeBuilding gives Welsh slate "100+ years" and Spanish "75-100 years", so sound slates are worth saving. A change to a different material is another matter: the Welsh Government says approval under the Building Regulations is likely, because loading, fire performance and energy use all change. Welsh permitted development covers a new covering that matches the old in look so far as practicable, and on the listed church or farm group, work that would alter their character needs listed building consent as well. Our slate roofing page covers repair methods, and you are told early if the survey points to a strip and relay of one slope. Because a gable can be reached only by ladder or tower, we agree the access with you first and keep the garden clear of loose material as we work.

The parts of a gable verge

Edge slates
The outer slates, pinned where the roof ends
Undercloak
A narrow course tucked beneath the edge slates
Pointing
Mortar bed that seals the edge against the wall
Fixings
Nails or clips holding the edge against wind
Dry-fix unit
A clipped verge system under BS 8612

A good verge repair is the one nobody notices from the lane.

Fig. 2 The verge, drawn close

Callout 2 of 3

Fascia, soffit and gutter: the Mitchel Troy roofline

The roofline is the lowest edge of the covering and everything fixed to it. Fascia: the timber facing the rafter ends, which carries the gutter brackets. Soffit: the underside panel of the overhang, hiding the rafter feet. The gutter takes the run-off and sends it down a pipe to a drain. When one part fails, the others follow it down, since a gutter that spills soaks the fascia and a soaked fascia loosens its fixings. Brett Martin gives the gutter fall as "1mm for every 600mm", a figure we check with a level on each run before deciding whether to re-set the old lengths or replace them.

Outbuildings need a separate thought. A cement-sheet roof on a barn or store has to be treated as fragile whatever it looks like: HSE's guidance A14 puts it as "AC roofs are always fragile", so crawl boards and edge protection come before anyone steps out. For a householder's own small amount of asbestos, Monmouthshire County Council points to a booked slot at its Llanfoist or Five Lanes recycling centre. Where roof timbers are exposed to view, we also record whether anyone has sprayed foam to the underside. The Energy Saving Trust says closed-cell foam's "main drawback is that it's not vapour permeable", that open-cell is "the more vapour permeable", and that the rot risk "should be much lower with an open-cell foam". RICS noted in March 2023 that lenders in certain sectors, equity release mortgages among them, had grown concerned; talk to your mortgage lender first, before any spray foam is applied.

Birds nest under eaves and bats use roof voids, so the same walk along the roofline includes a look for both. Birds in the middle of nesting get protection from the Wildlife and Countryside Act 1981, section 1, against harm done "intentionally". A licence for work affecting bats in Wales is applied for from Natural Resources Wales. Our guttering, soffits and fascias page covers replacement systems, and our spray foam insulation removal page covers the foam question. The survey says which parts of your roofline can stay, and photographs of each board and joint go with it.

Checked along the roofline

  • Gutter joints, brackets and the fall of each run
  • Fascia boards for softness where water has stood
  • Soffit panels, and what they are made of
  • Nests or roosts before any board comes off
  • Sheet roofs on outbuildings, for fragility
Fig. 3 Eaves and gutters, drawn close

Callout 3 of 3

The church, the farm and the National Landscape

Grade II* is the listing of St Michael's church (Cadw record 2086, designated 19 November 1953). Church Farmhouse is Grade II (record 25765) and so is the barn to its west (record 25766), both designated 27 September 2001. Works that would affect a listed building's character need authorisation under section 88 of the Historic Environment (Wales) Act 2023, and section 89 provides listed building consent. Monmouthshire County Council decides, and a listed building keeps its permitted development rights. A barn with a listing of its own is treated like any other listed building, so re-covering it is a consent matter before it is a pricing matter. We photograph the existing roof from several sides so the council has the record it needs.

The Wye Valley National Landscape (the former AONB) covers the village. It is a designation, and the planning decision still rests with Monmouthshire County Council. The rule book is what changes: the village counts as article 1(5) land, where permitted development does not extend to roof lights or dormers. Our planning guide for roof windows lays out the steps, and the council's planning team can say whether a given proposal needs permission. Monmouth (Central) is one conservation area nearby on the council's list, and the council confirms whether an Article 4 direction applies.

For church work, the first question is whose building it is. The Welsh exempt list covers the Church in Wales, Methodist, Roman Catholic, Baptist Union corporation and faculty churches, and it leaves out the United Reformed Church; ask the body that governs the congregation before planning roof work. Mitchel Troy had 1,414 residents at the 2021 Census and sits about 22.6 road miles south of Hereford, around 35 minutes by road. Building control is Monmouthshire County Council Building Control. We arrange any scaffold licence with our scaffolder, and plan the start date around the notice the council asks for. Where the survey finds that the walls themselves are damp, we tell you, because no roof repair cures that. Near the church and the farm group, stone walls and old mortar behave differently from modern brick, and the repair is chosen to suit them.

Terms from the listing paperwork

Section 88
Works to a listed building must be authorised before they start
Section 89
The part of the 2023 Act that grants listed building consent
National Landscape
The new name for an Area of Outstanding Natural Beauty
Article 1(5) land
Welsh land, such as a National Landscape, with fewer permitted development rights
Undercloak
The narrow slate course tucked beneath a verge edge

Mitchel Troy roofs, barns and the Wye Valley

Can green slate on a Mitchel Troy house be matched when slates slip?

Cadw's listing for the Church of St Michael records green slate roofs, and green slate varies in shade from one batch to the next. We hold replacement samples against the existing courses on the roof in daylight, photograph the choices and agree one with you before ordering. Where only a few slates have moved, the sound ones are refixed and the odd cracked one is replaced, and the report shows the roof before and after so the match can be judged from your own phone.

Do roof lights need permission inside the Wye Valley National Landscape at Mitchel Troy?

Yes, planning permission is needed. In Wales a National Landscape is article 1(5) land, where roof lights are outside permitted development. Monmouthshire County Council, not the designation, decides each application. A new rooflight brings Building Regulations into play as well, on the Welsh Government's reading. The planning guide on roof windows walks through the order of steps, starting with whether your plot falls inside the designation.

Does re-covering a barn or outbuilding roof at Mitchel Troy need approval?

The Welsh Government says re-roofing needs Building Regulations approval in most situations, and its roof page expects insulation to be upgraded once more than 25 per cent of the roof area is replaced or repaired. If the barn is listed, consent under the 2023 Act comes first. If it carries sheet roofing, assume it is fragile until the survey shows otherwise, and keep people and animals clear of the area beneath while any work is planned.

How does listed building consent work for Church Farmhouse and its barn?

Church Farmhouse (Cadw record 25765) and the barn to its west (record 25766) are each listed Grade II, designated on 27 September 2001. Works that would affect a listed building's character must be authorised under section 88 of the Historic Environment (Wales) Act 2023, through consent under section 89 from Monmouthshire County Council. We photograph the existing covering and write down the repair method for the council to consider.

Which council deals with a Mitchel Troy roof, and how far away are you?

Monmouthshire County Council deals with planning and building control for Mitchel Troy, which sits outside the National Park. Monmouth (Central) is one conservation area nearby on its list. We are about 22.6 road miles away, around 35 minutes by road, and a registered building control approver can handle Building Regulations as an alternative to the council. Party wall questions go to a party wall surveyor, not building control.

What does a scaffold licence involve in a Mitchel Troy lane?

The licence is a Highways Act 1980 section 169 matter. Monmouthshire County Council asks £108 as an administration fee, £27 per week for any extension, and at least 5 working days' notice before erection, and the start date is set to fit. We arrange the licence with our scaffolder. Where the scaffold stands wholly inside your own garden, off the highway, the licence question does not arise.

A Mitchel Troy survey, verge to gutter

Tell us which gable or roofline worries you, and we will visit, photograph it then write out a single total for the work.

10-year workmanship guarantee, in writing