Where two slopes meet: valleys at Christchurch
Every drop of rain that lands on two neighbouring slopes ends up in the valley between them, so callout one is the valley. It is a gutter built into the roof itself. A valley can be lined with lead, formed from tiles cut and laid to a curve, or fitted with a GRP channel, and whichever it is, the survey names the type before anything else. From the garden a valley looks like a faint line. Close up it shows whether the lining has cracked, whether the tile edges on either side have broken and whether the channel is clear.
Lead is sold in codes, each tied to a use. Royston Lead lists Code 3 as recommended for lead soakers only, so a valley lining asks for a heavier code than a soaker does, and the choice goes into the quote. We look for lead that has crept down the slope, split along a fold or lifted at its edge. A patch can answer a split in one place. A valley cracked along its length wants a new lining, and the old tiles beside it are lifted and relaid on top of it.
We also check both ends of a valley: the top, where it meets the ridge, and the foot, where it discharges into the gutter. A lining can be sound along its length and still fail at either end. Leaves, moss and silt in the channel can back water up under the tile edges, which is why we clear a valley and photograph it before judging the lining. A blocked channel and a failed one look much alike from below, and only one of them needs new lead. Where a valley ends in a gutter, the join gets the same attention, because that is where two systems hand over to each other.
None of this changes the approval picture for England. The Planning Portal says a re-cover is normally outside the application route where it touches less than 25 per cent of the building envelope and less than 50 per cent of the roof, and a new covering weighing 15 per cent or more extra would bring Building Regulations approval into play. Our lead roofing page covers valleys, flashings and sheet work in more depth.
Valley question
How can you tell a cracked valley lining from a blocked one?
We climb up and look. A clear channel with water still escaping under its edge means the lining has failed. A channel full of silt and moss, with sound lead beneath, only needs clearing. Photographs of both conditions go into the report, so you see which one you have.
A blocked valley and a failed one look alike from below. Only one needs new lead.