01432 610152 Get a quote Call 01432 610152

Roofers in Rushwick

Rushwick roofs, from flat extension coverings and loft windows to chimney stacks.

We photograph every fault on the roof you own, survey in a fixed order and put the total price in one written sum.

Get a free quoteCall 01432 610152

Rushwick: flat roofs, roof windows and chimneys

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Low spots on a flat roofLittle fall means a low spot soon holds a pool of rain.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Loft roof windowsA roof window needs flashings that suit the covering around it.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Chimneys and a listed houseLaugherne House is listed Grade II, and chimneys need lead and pointing checks.

Rushwick on our area map

Rushwick on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Flat roof, loft window and chimney in Rushwick

A Rushwick roof read in three parts, from flat extension to chimney stack

We take the Rushwick roof in survey order: the flat roof over any extension first, then the roof window in the loft and its flashings, then the chimney and the rules and licences that frame a repair.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Flat roof; 2 Roof window; 3 Stack and house.

Fig. 1 A Rushwick house in section: flat roof, roof window and chimney, numbered.

Callout 1 of 3

The flat roof over a Rushwick extension

Most of a house sheds rain by slope. A flat roof over a kitchen or garage extension manages it with a slight fall toward an outlet, and the covering on top has to stay unbroken because no pitch exists to carry a leak away. So the survey of a flat roof starts with ponding, meaning water still standing on the membrane a day or two after rain. A pool means the slope toward the outlet has gone, and it ages the covering faster than the dry parts of the roof.

The standard for flexible-membrane flat roofs today is BS 6229:2025. The NFRC reports that it sets "a minimum 1:80 finished fall for general roof areas and internal gutters", and IKO's published advice is a 1:40 design fall. A roof built dead level will pond whatever the covering, and the fall is worth checking before money is spent on a new membrane.

Lifespans are quoted as ranges, and the sources disagree. HomeBuilding gives EPDM, a synthetic rubber sheet, "25-30 years" and Less gives "30 to 50 years". For GRP, glass-reinforced plastic laid as one skin, HomeBuilding says "25-30 years" and Less "25 to 40 years". Torch-on felt is "10-15 years" at HomeBuilding and "10 to 20 years" at Less. We treat each as a range for the material, never a promise about your roof. Age on its own settles little; condition decides. The report records what we find on the membrane itself: blisters, splits at the laps, and edges lifting at the trim.

Upstands, the vertical turn-ups at a wall junction, are the next suspect after ponding. A split there lets rain run down inside the wall, so we check the seal along the top edge, the corners and each pipe that passes through. Indoors, we look at the ceiling below the flat roof for tide marks, which show where a slow leak has been working. On a GRP roof we also look for hairline cracks where deck boards meet, since the deck can move at those joints.

Approved Document L 2021 classes the re-covering of a flat roof as renovation, which brings insulation standards and building control into the job. Our flat roofing page covers the repair and the new-covering options.

Read across a Rushwick flat roof

Membrane
Unbroken, with no blisters or split laps
Fall
Enough slope to clear standing water
Upstands
Turned up the wall and sealed at the top
Outlets
Clear, with the gutter below running free
Edge trim
Fixed tight, with no lifting at the drip

A flat roof that ponds is telling you the fall has gone.

Fig. 2 Flat roofs, drawn close

Callout 2 of 3

Loft roof windows, flashings and escape routes

Callout two sits in the loft: a glazed frame let into the slope, with a kit of flashings sized to the tile or slate around it. Slate, plain tile and large-format tile each need a different kit, and lead soakers or an apron may finish the edge, so the first thing we ask of an old window is what it was fitted into. Rain at a roof window can come through the flashing rather than the glass, which is why the surround gets checked before the pane.

Thermal rules cover a new unit. Approved Document L 2021, Table 4.2, asks 2.2 of a rooflight and 1.4 or WER Band B of the roof window, so the two figures are not interchangeable. If the loft is being insulated or converted at the same time, Table 4.3 sets a threshold of 0.35 and an improved figure of 0.16 for the roof, until AD L 2026 Table 3.3 takes over from 24 March 2027.

Before any unit is quoted, we measure the rafter spacing, since a frame has to fit between two rafters or be carried on a trimmer. A trimmer is a short cross-timber that frames an opening in the roof, and cutting a rafter to make room for it is a structural change that needs checking, not guessing.

A converted loft brings fire safety in as well. In England, Approved Document B (the 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments) gives, at paragraph 2.5, a protected stairway or an alternative escape route, and its escape-window provision applies to storeys within 4.5 m of the ground. Your building control body decides what a given house needs, and the plan goes on the quote. From inside the loft we also check the lining around the frame and the seal between frame and insulation, because a gap there can show as damp on the reveal before it shows outside.

Planning is a separate question from Building Regulations, and in England designated land bears on a dormer more than on a roof window. Our planning guide for roof windows goes through the detail, and our Velux and skylight installation page shows how a unit is fitted and flashed.

Loft-window figures, asked and answered

Is a rooflight held to the same figure as a roof window?

No. Table 4.2 gives a rooflight 2.2 and a roof window 1.4 (or WER Band B). The two units are named separately in the Regulations, so we confirm which one you have before any figure is quoted.

At a roof window the flashing can decide whether the room stays dry.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

Chimney stacks, party walls and the Grade II house

Callout three belongs to the chimney, which has weather on all four sides. Lead is where a stack leaks. Where the stack meets the roof, a lead apron at the front and stepped flashings up the sides are wedged into the joints of the masonry. Small folded lead soakers go under each course of tile or slate beside it. Royston Lead marks Code 3 as "Recommended for lead soakers only", and MyJobQuote says correctly installed lead flashing "can last for over 80 years", so sound lead stays where it is. At the top, a pot that rocks in cracked flaunching is reset in a fresh collar of mortar, and the photographs show the crack before the repair and the collar after it.

Removing the breast and the stack is a structural change. The Planning Portal states that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." A breast on a party wall raises the Party Wall etc. Act 1996: the building owner serves notice and then waits at least two months, only afterwards taking a saw to the breast. Surveyors enter only if the neighbour objects, and silence for 14 days counts as an objection.

Laugherne House is listed Grade II (list entry 1063907, first listed 5 April 1971). Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 applies to works that would "affect its character as a building of special architectural or historic interest", and consent from Malvern Hills District Council is needed on top of any permitted development right. The parish had 1,403 usual residents at the 2021 Census, according to the ONS. The drive from central Hereford to Rushwick is 23.8 road miles, bearing north-east, in about 38 minutes.

To see whether your street falls inside a conservation area, search Malvern Hills District Council's own list. The council reports that no Article 4(2) Directions are currently in force. Worcester City Council, Wychavon District Council and Malvern Hills District Council share South Worcestershire Building Control, while a registered building control approver may be engaged instead. For Rushwick, Worcestershire County Council runs the scaffold licence under section 169 of the Highways Act 1980, and puts the duty on the hired firm, "required to apply" in the page's own words. Scaffolding kept within your own boundary needs no such licence.

A chimney stack at the roofline

SoundLead tight in the joint, pointing full, pots firm
Needs workLifted lead, raked-out joints, a rocking pot

Rushwick roofs: extensions, loft windows and chimneys

How long should a flat roof over a Rushwick extension last?

It depends on the covering. HomeBuilding gives EPDM "25-30 years" where Less says "30 to 50 years", GRP "25-30 years" against "25 to 40 years", and torch-on felt "10-15 years" against "10 to 20 years". Those are ranges for each material, never a promise. The survey reads the membrane itself for ponding, blisters and split laps, and a local repair is the right answer where the rest is sound.

Does a new roof window in a Rushwick loft need planning permission?

Building Regulations and planning are separate questions. On the planning side a roof window is not treated like a dormer, and the conditions are in our planning guide. For Building Regulations, a new roof window must reach 1.4 or WER Band B, and a loft conversion brings Approved Document B in too. Your building control body confirms what a given house needs.

Can I take a chimney breast out of a Rushwick house?

Not without approval: the Planning Portal states that building regulations approval will always apply to chimney breast removal. A shared wall also engages the Party Wall etc. Act 1996, where the owner serves notice and waits at least two months. We survey the stack above the roof first, then report what supports it, so the structural question is answered before anything is cut and you know who needs to be told.

What does Grade II listing mean for roof work at Laugherne House?

Laugherne House is Grade II (list entry 1063907, first listed 5 April 1971). Works that would affect a listed building's character need listed building consent under section 7 of the 1990 Act, even though the house keeps its permitted development rights. Malvern Hills District Council decides, so take the list entry and the covering you propose to it before anything is ordered.

Who licenses a scaffold on a Rushwick road, and what is the fee?

In Rushwick, Worcestershire County Council grants scaffold licences, and the contracting firm is "required to apply". Worcestershire County Council charges £85 per week and £65 for subsequent weeks, with a £25 urgency surcharge where the application is needed within two days. Scaffold kept wholly inside your own boundary stays outside the highway licence. Any licence the scaffold does need is folded into our one written price.

How do I check whether my Rushwick street is in a conservation area?

Malvern Hills District Council keeps the conservation area list, so search it for your street, and ask the council if the answer is unclear. A conservation area alters the position for a Rushwick dormer, though a plain re-cover differs, as the planning guide explains. The council also reports no Article 4(2) Directions in force. Your building control route is the same either way, and a survey will not change that.

Book a flat-roof or loft-window survey in Rushwick

Message us a photograph of the extension roof or the loft window, and a survey date follows, with one written total price afterwards.

10-year workmanship guarantee, in writing